Book · Julian R. Sterling
A Practitioner's Guide to Overall Equipment Effectiveness: Availability, Performance and Quality, the Six Big Losses, TEEP and the Economics of Downtime
Google Play Paperback, $32.99 PDF edition, $19.99
Every plant has an OEE board, and few of those numbers change a decision. The percentage depends on what was taken out of planned production time, on which ideal cycle sits under performance and on how the machines were averaged; and an hour of loss is worth very different money on a sold-out press and on one that waits for orders. This handbook shows how to measure overall equipment effectiveness the same way on every machine, read it beside OOE and TEEP, rank losses in dollars as well as in hours, and price each improvement before it is funded.
The OEE Handbook works the whole method on one fictional custom injection molder, Ridgeholt Plastics, Inc., with four presses and one plant. Its fiscal 2025 baseline shows plant OEE of 66.1 percent and Press 2, the sold-out constraint, at 60.9 percent. In hours, Press 3 changeovers are the largest loss at 880 hours; in dollars, the five largest losses all sit on Press 2, because an hour there is worth $1,152 of contribution. A 12-month program costing $573,000 (SMED, autonomous maintenance, a fix of minor stops, cavity pressure monitoring) lifts the plant to 79.9 percent and Press 2 to 77.1 percent, worth $1,181,000 a year when the extra housings sell and $152,000 when they do not. Every figure is invented for illustration. Standards are described as read in November 2026.
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe and Australia. Add the PDF to a paperback order for $5.
PDF edition, $19.99, DRM-free, delivered at once by email.
Every figure below is computed by the book's model and reproduced in the companion workbook. Ridgeholt Plastics, Inc. and every person in the case are fictional; figures are invented for illustration.
| Item | Value |
|---|---|
| Presses / scheduled hours per press and year | 4 / 6,048 (252 days of 24 hours) |
| Plant OEE, fiscal 2025 baseline / after state | 66.1 percent / 79.9 percent |
| Plant availability x performance x quality, baseline | 85.8 percent x 81.3 percent x 94.7 percent |
| Press 2 OEE, baseline / after state | 60.9 percent / 77.1 percent |
| Press 2 planned production time / run time / fully productive time, baseline | 5,928 / 4,866 / 3,610 hours |
| Plant loss hours, baseline / after state | 6,987 / 3,654 |
| Largest loss in hours / in dollars | Press 3 changeovers, 880 hours / Press 2 minor stops, $605,000 |
| Press 2 changeover, before / after SMED | 200 / 75 minutes |
| Simple average of the four OEEs / time-weighted plant OEE, baseline | 66.3 percent / 66.1 percent |
| Press 2 TEEP, baseline / after state | 41.2 percent / 52.2 percent |
| One OEE point on Press 2: sold / staffed hours saved / energy only | $68,288 / $5,632 / $1,423 a year |
| Cost of one hour of downtime: Press 2 baseline / after / Press 1 | $855 / $974 / about $20 |
| Program cost / full-year value, output sold / not sellable | $573,000 / $1,181,000 / $152,000 |
| Payback / net present value, output sold | 6.1 months / $3,677,000 |
The live Excel files behind every calculation in the book. Blue inputs, black formulas, no macros, and a Checks tab that must read zero. No sign-up required for book readers.
Appendix D, chapters 2 to 14
21 tabs: README, Inputs, Calendar, Time_Model, Availability, Performance, Quality, Six_Losses, Pareto, Data_Codes, TEEP_OOE, Aggregation, Line_vs_Machine, SMED, Reliability, Constraint, Value, Business_Case, Ramp_FY2026, ASC330 and Checks. The time model, availability, performance and quality by press, the six big losses and the Pareto in hours and dollars, OOE and TEEP, aggregation, the line versus the machine, SMED, reliability, the constraint, the value of the program, the business case, the fiscal 2026 ramp, the ASC 330 illustration and the checks.
Download OEE_Workbook.xlsx89 KBStandalone practitioner tool
Up to 10 machines, lines or shifts: availability, performance, quality, OEE, OOE, TEEP and utilization, the six big losses in hours, a Pareto in hours and in dollars, OEE aggregated by time, the value of one OEE point, the cost of one hour of downtime and flags for impossible inputs. Prefilled with an illustrative plant.
Download OEE_Calculator.xlsx21 KBWant the calculator first? Open the free OEE Calculator page for what it does and the Excel download.
Plant managers and production managers, continuous improvement, lean and six sigma engineers, maintenance and reliability managers, plant controllers and manufacturing CFOs, performance consultants and industrial engineering students.
ISO 22400-2:2014, which ISO has under revision, for the time elements and the OEE index in principle; SEMI E10 and E79 as the semiconductor variant; lockout/tagout under 29 CFR 1910.147 for changeovers and jam clearing; and normal capacity and abnormal costs under ASC 330, all as read in November 2026.
Yes. Chapter 13 values one OEE point three ways (output sold, staffed hours saved, energy only), prices an hour of downtime at the constraint and elsewhere, and builds the business case of an improvement program with and without sellable output.
No. Chapter 14 traces it as a historical rule of thumb (90 percent availability, 95 percent performance and 99.9 percent quality give 85.4 percent) and shows why a press above it can be worth less than a press below it.
Yes. The case workbook and the standalone OEE Calculator are free on this page, with no sign-up for book readers.
Related titles. Full list on the author page.