Book · Julian R. Sterling

The OEE Handbook

A Practitioner's Guide to Overall Equipment Effectiveness: Availability, Performance and Quality, the Six Big Losses, TEEP and the Economics of Downtime

About the book

Cover of The OEE Handbook

Every plant has an OEE board, and few of those numbers change a decision. The percentage depends on what was taken out of planned production time, on which ideal cycle sits under performance and on how the machines were averaged; and an hour of loss is worth very different money on a sold-out press and on one that waits for orders. This handbook shows how to measure overall equipment effectiveness the same way on every machine, read it beside OOE and TEEP, rank losses in dollars as well as in hours, and price each improvement before it is funded.

The OEE Handbook works the whole method on one fictional custom injection molder, Ridgeholt Plastics, Inc., with four presses and one plant. Its fiscal 2025 baseline shows plant OEE of 66.1 percent and Press 2, the sold-out constraint, at 60.9 percent. In hours, Press 3 changeovers are the largest loss at 880 hours; in dollars, the five largest losses all sit on Press 2, because an hour there is worth $1,152 of contribution. A 12-month program costing $573,000 (SMED, autonomous maintenance, a fix of minor stops, cavity pressure monitoring) lifts the plant to 79.9 percent and Press 2 to 77.1 percent, worth $1,181,000 a year when the extra housings sell and $152,000 when they do not. Every figure is invented for illustration. Standards are described as read in November 2026.

Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe and Australia. Add the PDF to a paperback order for $5.

PDF edition, $19.99, DRM-free, delivered at once by email.

Paperback, $32.99 PDF edition, $19.99

Who it is for

What is inside

Front matter

Part I, Definitions and the Time Model

Part II, Measuring Losses

Part III, Reducing Losses

Part IV, Money, Capacity and Governance

Appendices

The Ridgeholt Plastics, Inc. case in figures

Every figure below is computed by the book's model and reproduced in the companion workbook. Ridgeholt Plastics, Inc. and every person in the case are fictional; figures are invented for illustration.

ItemValue
Presses / scheduled hours per press and year4 / 6,048 (252 days of 24 hours)
Plant OEE, fiscal 2025 baseline / after state66.1 percent / 79.9 percent
Plant availability x performance x quality, baseline85.8 percent x 81.3 percent x 94.7 percent
Press 2 OEE, baseline / after state60.9 percent / 77.1 percent
Press 2 planned production time / run time / fully productive time, baseline5,928 / 4,866 / 3,610 hours
Plant loss hours, baseline / after state6,987 / 3,654
Largest loss in hours / in dollarsPress 3 changeovers, 880 hours / Press 2 minor stops, $605,000
Press 2 changeover, before / after SMED200 / 75 minutes
Simple average of the four OEEs / time-weighted plant OEE, baseline66.3 percent / 66.1 percent
Press 2 TEEP, baseline / after state41.2 percent / 52.2 percent
One OEE point on Press 2: sold / staffed hours saved / energy only$68,288 / $5,632 / $1,423 a year
Cost of one hour of downtime: Press 2 baseline / after / Press 1$855 / $974 / about $20
Program cost / full-year value, output sold / not sellable$573,000 / $1,181,000 / $152,000
Payback / net present value, output sold6.1 months / $3,677,000

Free companion files

The live Excel files behind every calculation in the book. Blue inputs, black formulas, no macros, and a Checks tab that must read zero. No sign-up required for book readers.

Download all files (ZIP)105 KB

Start with 00_START_HERE.md.

Want the calculator first? Open the free OEE Calculator page for what it does and the Excel download.

Worked articles from the book

Questions practitioners ask

Who is this book for?

Plant managers and production managers, continuous improvement, lean and six sigma engineers, maintenance and reliability managers, plant controllers and manufacturing CFOs, performance consultants and industrial engineering students.

Which standards does it cover?

ISO 22400-2:2014, which ISO has under revision, for the time elements and the OEE index in principle; SEMI E10 and E79 as the semiconductor variant; lockout/tagout under 29 CFR 1910.147 for changeovers and jam clearing; and normal capacity and abnormal costs under ASC 330, all as read in November 2026.

Does it show how to put a dollar value on OEE?

Yes. Chapter 13 values one OEE point three ways (output sold, staffed hours saved, energy only), prices an hour of downtime at the constraint and elsewhere, and builds the business case of an improvement program with and without sellable output.

Is the 85 percent world class OEE a standard?

No. Chapter 14 traces it as a historical rule of thumb (90 percent availability, 95 percent performance and 99.9 percent quality give 85.4 percent) and shows why a press above it can be worth less than a press below it.

Are the companion files free?

Yes. The case workbook and the standalone OEE Calculator are free on this page, with no sign-up for book readers.