OEE Calculator (Excel)

An unlocked Excel calculator for up to 10 machines, lines or shifts: availability, performance and quality, OEE, OOE and TEEP, the six big losses in hours and dollars, OEE aggregated by time, the value of one OEE point and the cost of one hour of downtime.

Most OEE disputes are definition disputes: which stops were planned, which ideal cycle sits under performance, whether reworked parts count as good, and how four machines were turned into one plant figure. This calculator makes every one of those choices visible in a blue cell, so the number on the board can be rebuilt and defended.

Get the Excel calculator

One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once, along with the other free models.

OEE_Calculator.xlsx (21 KB)

You join the reader list: one email when a new free model or book comes out. Unsubscribe in one click. Already subscribed? Enter the same address. How your address is used.

The handbook behind this calculator

This calculator is the stand-alone engine of The OEE Handbook, which follows one four-press plant through a measured baseline and a 12-month improvement program: the time model, availability, performance and quality, the six big losses and the Pareto, data collection and reason codes, TEEP and OOE, SMED, TPM and reliability, quality losses, the constraint, the value of an OEE point and the business case, benchmarks and governance.

Paperback, $32.99 PDF edition, $19.99 Book page and full workbook

What it computes

OutputWhat you enterWhy it matters
AvailabilityScheduled time, planned stops, downtime by causeRun time over planned production time; changeovers count as downtime
PerformanceIdeal cycle and cavities, or the ideal rate, and the total countTotal parts x ideal time per part over run time; a value above 100 percent is flagged
QualityTotal count, scrap, rework and startup scrapGood parts made right the first time over total parts
OEE, OOE, TEEP, utilizationThe same inputs and the calendar hoursOEE alone hides every exclusion; OOE and TEEP show what was excluded
Six big losses and ParetoDowntime by cause and the countsLoss hours ranked, then priced at the value of an hour on each machine
Value of a point, cost of an hourContribution per part, avoidable cost per hour, constraint flagAn hour at the constraint is lost output; elsewhere it is only the cost the plant stops spending

How the numbers are computed

Planned production time is scheduled time minus the planned stops you list. Run time is planned production time minus every unplanned stop, changeovers included. Net run time is total parts times the ideal time per part, and fully productive time is good parts made right the first time times the ideal time per part. OEE is fully productive time divided by planned production time, which equals availability x performance x quality. OOE puts the same fully productive time over scheduled time and TEEP over calendar time. Several machines are aggregated by summing their times, never by averaging their percentages.

What is inside the workbook

README
What the file does, how to use it, the definitions it applies and its limits.
Inputs
Blue cells, one line per machine, line or shift (up to 10): scheduled hours, planned stop hours, breakdown, changeover and other unplanned stop hours, minor stop hours, ideal cycle and cavities or ideal rate, total count, scrap, rework, startup scrap, contribution per part, avoidable cost per hour and the constraint flag.
Results
Planned production time, run time, net run time and fully productive time, then availability, performance, quality, OEE, OOE, TEEP and utilization by line and in total, with OEE aggregated by time beside the simple average it replaces.
Losses_Pareto
Loss hours by line for the six big losses plus other unplanned stops, tied to planned production time minus fully productive time, and the ten largest losses ranked in hours and in dollars.
Value
For each line, the hours and good parts in one OEE point, its value if the output is sold or not, and the cost of one hour of downtime.
Checks
Flags for impossible inputs, such as performance above 100 percent, downtime above planned production time or scrap above the count, and reconciliations of the totals. The total must read zero.

The prefilled example

The file opens with Example Co., an illustrative plant whose four presses carry the baseline inputs of the book's fictional case, so every result can be checked against the book: Press 2 at 60.9 percent OEE and the four presses at 66.1 percent aggregated by time, against a simple average of 66.3 percent. Reproduce those figures first, then save a copy, clear the blue cells, keep the formulas and enter your own machines.

How to use it

  1. Write down your definitions first: the planned-stop list, the source of each ideal cycle, the minor-stop threshold and whether reworked parts count as good.
  2. Clear the blue cells of the example, leaving the formulas in place.
  3. Enter one machine, line or shift per row with the same period for all of them.
  4. Add the contribution per part and the avoidable cost per hour, and flag the constraint.
  5. Check that the Checks tab reads zero before any figure goes into a shift review, a capital request or a board report.

For the formula worked on four presses, read the OEE formula, step by step; for the measures that sit beside OEE, TEEP vs OEE vs OOE; for the money, how to calculate the cost of downtime per hour.

The calculator computes from the figures you enter and decides nothing. It is a working aid, not a system of record. Education only, not engineering or accounting advice.

Questions practitioners ask

What does the OEE calculator do?

For up to 10 machines, lines or shifts it turns scheduled time, planned stops, downtime by cause, the ideal cycle, counts, scrap and rework into availability, performance, quality, OEE, OOE, TEEP and utilization, the six big losses in hours and a Pareto, then aggregates the machines by time.

Why does it flag performance above 100 percent?

Because it is impossible. A performance figure above 100 percent almost always means the ideal cycle entered is slower than the machine really runs, often a padded standard copied from the ERP. The flag asks you to fix the ideal cycle, not to celebrate.

How does it value an OEE point?

Enter the contribution per good part and the avoidable cost per hour. If the machine is flagged as the constraint and its output sells, one point is valued at the extra good parts times their contribution; otherwise it is valued at the hours freed times the cost the plant actually stops spending.

Does it replace an MES or a monitoring system?

No. It does not capture data, schedule production or post accounting entries. It computes from the totals you type in, which makes it useful to audit a dashboard, test definitions or build a business case.