An unlocked Excel calculator for up to 10 machines, lines or shifts: availability, performance and quality, OEE, OOE and TEEP, the six big losses in hours and dollars, OEE aggregated by time, the value of one OEE point and the cost of one hour of downtime.
Most OEE disputes are definition disputes: which stops were planned, which ideal cycle sits under performance, whether reworked parts count as good, and how four machines were turned into one plant figure. This calculator makes every one of those choices visible in a blue cell, so the number on the board can be rebuilt and defended.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once, along with the other free models.
OEE_Calculator.xlsx (21 KB)
You join the reader list: one email when a new free model or book comes out. Unsubscribe in one click. Already subscribed? Enter the same address. How your address is used.
This calculator is the stand-alone engine of The OEE Handbook, which follows one four-press plant through a measured baseline and a 12-month improvement program: the time model, availability, performance and quality, the six big losses and the Pareto, data collection and reason codes, TEEP and OOE, SMED, TPM and reliability, quality losses, the constraint, the value of an OEE point and the business case, benchmarks and governance.
Paperback, $32.99 PDF edition, $19.99 Book page and full workbook
| Output | What you enter | Why it matters |
|---|---|---|
| Availability | Scheduled time, planned stops, downtime by cause | Run time over planned production time; changeovers count as downtime |
| Performance | Ideal cycle and cavities, or the ideal rate, and the total count | Total parts x ideal time per part over run time; a value above 100 percent is flagged |
| Quality | Total count, scrap, rework and startup scrap | Good parts made right the first time over total parts |
| OEE, OOE, TEEP, utilization | The same inputs and the calendar hours | OEE alone hides every exclusion; OOE and TEEP show what was excluded |
| Six big losses and Pareto | Downtime by cause and the counts | Loss hours ranked, then priced at the value of an hour on each machine |
| Value of a point, cost of an hour | Contribution per part, avoidable cost per hour, constraint flag | An hour at the constraint is lost output; elsewhere it is only the cost the plant stops spending |
Planned production time is scheduled time minus the planned stops you list. Run time is planned production time minus every unplanned stop, changeovers included. Net run time is total parts times the ideal time per part, and fully productive time is good parts made right the first time times the ideal time per part. OEE is fully productive time divided by planned production time, which equals availability x performance x quality. OOE puts the same fully productive time over scheduled time and TEEP over calendar time. Several machines are aggregated by summing their times, never by averaging their percentages.
The file opens with Example Co., an illustrative plant whose four presses carry the baseline inputs of the book's fictional case, so every result can be checked against the book: Press 2 at 60.9 percent OEE and the four presses at 66.1 percent aggregated by time, against a simple average of 66.3 percent. Reproduce those figures first, then save a copy, clear the blue cells, keep the formulas and enter your own machines.
For the formula worked on four presses, read the OEE formula, step by step; for the measures that sit beside OEE, TEEP vs OEE vs OOE; for the money, how to calculate the cost of downtime per hour.
The calculator computes from the figures you enter and decides nothing. It is a working aid, not a system of record. Education only, not engineering or accounting advice.
For up to 10 machines, lines or shifts it turns scheduled time, planned stops, downtime by cause, the ideal cycle, counts, scrap and rework into availability, performance, quality, OEE, OOE, TEEP and utilization, the six big losses in hours and a Pareto, then aggregates the machines by time.
Because it is impossible. A performance figure above 100 percent almost always means the ideal cycle entered is slower than the machine really runs, often a padded standard copied from the ERP. The flag asks you to fix the ideal cycle, not to celebrate.
Enter the contribution per good part and the avoidable cost per hour. If the machine is flagged as the constraint and its output sells, one point is valued at the extra good parts times their contribution; otherwise it is valued at the hours freed times the cost the plant actually stops spending.
No. It does not capture data, schedule production or post accounting entries. It computes from the totals you type in, which makes it useful to audit a dashboard, test definitions or build a business case.