Definitions and formulas, a worked example on four presses, why TEEP stays flat on demand-limited machines, and which measure to use for which decision.
OEE, OOE and TEEP share one numerator, fully productive time, and differ only in the denominator. OEE divides it by planned production time, OOE by scheduled (operating) time and TEEP by calendar time. OEE answers how well the machine ran when it was supposed to run; TEEP answers how much of the year's 8,760 hours produced good parts. Utilization, planned production time over calendar time, links the two: TEEP = OEE x utilization.
Worked in full in The OEE Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
| Measure | Formula | What it tells you |
|---|---|---|
| OEE | Fully productive time / planned production time | How well the machine runs in the time it is meant to produce |
| OOE | Fully productive time / scheduled time | The same, with planned stops (maintenance, trials, no orders) counted as losses |
| TEEP | Fully productive time / calendar time | How much of all the hours in the year made good parts |
| Utilization | Planned production time / calendar time | How much of the year was loaded at all; TEEP = OEE x utilization |
Because the numerator never changes, the three can only move apart when the denominators do. That is exactly why they belong side by side: every hour a plant moves out of planned production time raises OEE and leaves OOE and TEEP where they were.
In the fictional plant of The OEE Handbook, Press 2 is sold out. Each year has 8,760 calendar hours; weekends and 9 plant holidays leave 2,712 unscheduled hours, so scheduled time is 6,048 hours. Planned maintenance of 120 hours leaves 5,928 hours of planned production time. In the baseline year the press produced 3,610 hours of fully productive time.
OEE = 3,610 / 5,928 = 60.9 percent; OOE = 3,610 / 6,048 = 59.7 percent; TEEP = 3,610 / 8,760 = 41.2 percent
Utilization = 5,928 / 8,760 = 67.7 percent; TEEP = 60.9 percent x 67.7 percent = 41.2 percent
OOE sits close to OEE because Press 2 has no idle time: its only planned stop is maintenance. After a 12-month improvement program its OEE reached 77.1 percent, OOE 75.5 percent and TEEP 52.2 percent. Utilization did not change, so every point of OEE gained became a point of TEEP.
The other three presses were limited by demand. The plant excluded "no orders" idle time from planned production time, as many plants do, which made their OEE look like a measure of how well they ran.
| Press | OEE before / after | OOE before / after | TEEP before / after |
|---|---|---|---|
| Press 1 | 73.4 / 85.1 percent | 62 / 62 percent | 42.8 / 42.8 percent |
| Press 2 | 60.9 / 77.1 percent | 59.7 / 75.5 percent | 41.2 / 52.2 percent |
| Press 3 | 63.4 / 76.6 percent | 51.4 / 51.4 percent | 35.5 / 35.5 percent |
| Press 4 | 67.4 / 81.9 percent | 51.7 / 51.7 percent | 35.7 / 35.7 percent |
Presses 1, 3 and 4 made the same good parts in the same calendar, so their fully productive time, their OOE and their TEEP could not change. What changed was where the saved time went: into idle hours. Idle time on Press 1 rose from 844 hours to 1,546 hours, on Press 3 from 926 hours to 1,774 hours and on Press 4 from 1,337 hours to 2,161 hours. OEE rose because planned production time shrank. That is not a failure of the program; it is information. An OEE gain on a demand-limited machine is worth only the cash the plant stops spending in those idle hours, which the cost of an hour of downtime prices at about $20 an hour on Press 1.
At plant level, OEE went from 66.1 percent to 79.9 percent, a gain of 13.8 points, while OOE went from 56.2 percent to 60.2 percent and TEEP from 38.8 percent to 41.5 percent. Published alone, the first figure would have told the board that the plant had gained far more capacity than it could actually sell.
Every exclusion raises OEE without producing a part. In the case, reclassifying Press 2's 292 hours of material and staffing stops as planned stops would have lifted its baseline OEE from 60.9 percent to 64.1 percent without one more housing. OOE and TEEP would not have moved, which is why the plant publishes them beside OEE and audits its planned-stop list every quarter.
The rule that keeps the three honest has three parts: write the exclusion list down once (the case plant's list names planned maintenance, mold trials and no orders, and explicitly not material shortages, waiting or changeovers), apply it the same way to every machine and period, and never publish OEE without OOE or TEEP next to it. The formula itself is worked rung by rung in the OEE formula worked step by step.
Computing the three measures takes no more data than OEE alone, only more discipline about time. For each machine and period, keep calendar hours, scheduled hours, each planned stop by type, each unplanned stop by reason code, the total count, the good-first-time count and the ideal cycle with its source. Store the planned stops as separate lines rather than netting them off scheduled time, so that OOE can be rebuilt later and an auditor can see what was excluded. If a planned-stop category grows from one quarter to the next, that is the first place to look when OEE improves faster than output.
Semiconductor fabs use a related family under SEMI E10 and E79, where the time states differ and "efficiency" replaces "effectiveness"; the logic of a common numerator over different time bases is the same.
The free OEE Calculator computes OEE, OOE, TEEP and utilization side by side for up to 10 machines, so an exclusion cannot hide in one of them.
Both use fully productive time. OEE divides it by planned production time, TEEP by calendar time. TEEP = OEE x utilization, where utilization is planned production time over calendar time.
Overall operations effectiveness: fully productive time over scheduled (operating) time. Unlike OEE it counts planned stops such as maintenance, trials and no-orders idle time as losses, so excluding a stop from the OEE base cannot raise it.
Because planned production time shrank. On a demand-limited machine that makes the same good parts in fewer hours, the saved time becomes idle time, which the OEE base excludes and the TEEP base does not.
OEE for running the floor, with OOE or TEEP printed beside it. TEEP is the measure for capacity and capital decisions, because it shows how many of the year's hours already produce good parts.
This guide is one arc of The OEE Handbook. The book follows one four-press plant through a measured baseline and a 12-month program: what OEE measures and the time model, availability, performance and the ideal cycle, quality, the six big losses and the Pareto in hours and dollars, data collection and reason codes, TEEP, OOE, aggregation and lines, SMED, TPM, MTBF and MTTR, quality losses, the constraint, the value of an OEE point, the business case and inventory cost, benchmarks, gaming and governance, with checklists and templates.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: OEE Calculator (Excel).
Illustrative figures computed by the book model; Ridgeholt Plastics, Inc. and every person and amount are fictional and invented for illustration, not any plant's data or an industry benchmark. OEE formulas, the six big losses, the minor-stop threshold and the 85 percent rule of thumb are conventions of the trade, not norms; ISO 22400-2:2014 is described as read in November 2026 and is under revision. Education only, not engineering, safety or accounting advice.