Articles

OEE Formula: Availability x Performance x Quality, Worked Through the Time Model

From scheduled time to fully productive time on one press, the six big losses that fill the gap, and the three definitions that move the number.

OEE (overall equipment effectiveness) is fully productive time divided by planned production time, which is the same thing as availability x performance x quality. Availability is run time over planned production time, performance is total parts x ideal cycle time per part over run time, and quality is good parts made right the first time over total parts. The arithmetic is easy; the three definitions underneath it decide whether the number means anything.

Worked in full in The OEE Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

The time model behind the formula

Every OEE figure is a ratio of two times taken from one ladder. Start from calendar time, remove the hours the plant never schedules, then the planned stops, then every unplanned stop, then the speed losses, then the time spent making parts that were not good the first time. What remains is fully productive time: the hours the machine would have needed to make only the good parts at its ideal cycle.

RungDefinitionLoss removed to reach the next rung
Calendar time24 hours a day, every dayUnscheduled time (weekends, holidays, no shift)
Scheduled timeThe shifts the plant intends to staffPlanned stops (planned maintenance, trials, no orders)
Planned production timeThe OEE baseBreakdowns, changeovers, material and staffing stops
Run timeTime the machine was runningMinor stops and reduced speed
Net run timeTotal parts x ideal time per partScrap, rework and startup scrap
Fully productive timeGood parts x ideal time per part

ISO 22400-2:2014, which ISO has under revision, describes the same partition with its own vocabulary: planned busy time for the OEE base, actual production time for what most plants call run time, and "effectiveness" where most plants say performance. Check the current edition before relying on its detail; the logic of the ladder has not changed.

Worked example: one press, one year

The case in The OEE Handbook is a fictional injection molder with four presses. Press 2, a 500-ton press running a 2-cavity mold for appliance front housings, is the one that matters: its customer would buy more than it can make. The plant runs 3 shifts of 8 hours, Monday to Friday, 252 operating days a year, so each press has 6,048 scheduled hours. Press 2 loses 120 hours to planned maintenance, which leaves 5,928 hours of planned production time.

Availability

In the baseline year Press 2 lost 330 hours to breakdowns (60 failures of 5.5 hours), 440 hours to changeovers (132 changeovers of 200 minutes) and 292 hours to material, staffing and waiting stops, 1,062 hours in all.

Run time = 5,928 - 330 - 440 - 292 = 4,866 hours; availability = 4,866 / 5,928 = 82.1 percent

Changeovers are in. Some plants treat them as planned stops; every such exclusion raises OEE without producing one more part.

Performance

The ideal cycle is 40.0 seconds for 2 housings, so 20 seconds of ideal time per housing. The press made 694,560 housings in total.

Net run time = 694,560 x 20 seconds = 3,859 hours; performance = 3,859 / 4,866 = 79.3 percent

The same figure comes out of the two causes of speed loss: 525 hours of minor stops (10,500 stops of 3.0 minutes, each under the plant's 5-minute threshold) and an actual cycle of 45.0 seconds against the ideal 40.0. Performance = (4,866 - 525) / 4,866 x 40 / 45 = 79.3 percent.

Quality

Of the 694,560 housings, 649,800 were good the first time; the rest were startup scrap after changeovers, scrap and rework.

Quality = 649,800 / 694,560 = 93.6 percent

OEE, two ways

OEE = 82.1 percent x 79.3 percent x 93.6 percent = 60.9 percent

Fully productive time = 649,800 x 20 seconds = 3,610 hours; OEE = 3,610 / 5,928 = 60.9 percent

The two must agree. If your spreadsheet multiplies three rounded components and gets a different answer from the time ratio, one of the inputs is defined twice.

Where the 2,318 lost hours went: the six big losses

Planned production time minus fully productive time is the loss: 5,928 - 3,610 = 2,318 hours. The six big losses split it by cause, with a seventh line for the stops that fit none of them.

LossOEE factorPress 2 hours
BreakdownsAvailability330
Setup and adjustment (changeovers)Availability440
Other unplanned stops (material, staffing, waiting)Availability292
Idling and minor stopsPerformance525
Reduced speedPerformance482
Process defects (scrap and rework)Quality190
Startup (yield) lossesQuality59

The rows add to 2,318 hours. That check is the cheapest audit of an OEE system there is: if the losses do not add up to planned production time minus fully productive time, something is uncoded or double counted.

Three definitions that move the number

The ideal cycle

The ideal cycle is the fastest cycle at which the tool makes a good part on that machine, usually the validated best sustained cycle. It is never the padded standard used for costing. Measured against the ERP standard of 48.0 seconds, Press 2's performance would read 95.2 percent and its OEE 73.1 percent instead of 60.9 percent, for the same housings. On Press 3 the ERP standard gives performance of 103.3 percent, which is impossible and gives the padding away.

Where minor stops go

Common practice puts short stops in performance. ISO 22400-2 places minor stoppages in delay time, outside actual production time, so a plant that follows it sees them in availability. On Press 2 availability becomes 73.2 percent and performance 88.9 percent; OEE stays 60.9 percent. Say which convention you use and never mix them across machines.

Rework

Counting the 13,680 reworked housings as good would give quality of 95.5 percent and OEE of 62.2 percent, and the rework cost of $1.10 a housing would disappear from the indicator.

More than one machine: add times, never average percentages

Plant OEE is the sum of fully productive time over the sum of planned production time. For the four presses: 13,594 hours / 20,581 hours = 66.1 percent. The simple average of the four press figures is 66.3 percent and the average weighted by good parts is 71.3 percent, because 18,000,000 closures swamp everything else. Neither corresponds to any time base. The same rule applies to shifts and to months. TEEP vs OEE vs OOE shows what happens when the base itself changes, and the cost of an hour of downtime turns lost hours into money.

To run the same arithmetic on your own machines, the free OEE Calculator takes up to 10 machines, lines or shifts and aggregates them by time. For the shorter version of this example with the value of one OEE point, see a shorter OEE example with the value of one point.

Questions practitioners ask

What is the OEE formula?

OEE = availability x performance x quality = fully productive time / planned production time. Availability is run time over planned production time, performance is total parts x ideal time per part over run time, and quality is good parts made right the first time over total parts.

Should changeovers count as downtime in OEE?

In the convention used here, yes: changeovers are an availability loss. Treating them as planned stops raises OEE without producing a part, hides the case for SMED and makes the figure incomparable with machines that count them.

Can performance be above 100 percent?

Not if the ideal cycle is right. A performance figure above 100 percent is the classic symptom of an ideal cycle that is too slow, often a padded standard copied from the ERP.

How do you calculate OEE for a whole plant?

Add fully productive time across machines and divide by the sum of planned production time. Never average the percentages: in the worked case the time-weighted plant figure is 66.1 percent, the simple average 66.3 percent and the parts-weighted average 71.3 percent.

Read the full handbook

This guide is one arc of The OEE Handbook. The book follows one four-press plant through a measured baseline and a 12-month program: what OEE measures and the time model, availability, performance and the ideal cycle, quality, the six big losses and the Pareto in hours and dollars, data collection and reason codes, TEEP, OOE, aggregation and lines, SMED, TPM, MTBF and MTTR, quality losses, the constraint, the value of an OEE point, the business case and inventory cost, benchmarks, gaming and governance, with checklists and templates.

Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks

Free download: OEE Calculator (Excel).

Also on this site

Illustrative figures computed by the book model; Ridgeholt Plastics, Inc. and every person and amount are fictional and invented for illustration, not any plant's data or an industry benchmark. OEE formulas, the six big losses, the minor-stop threshold and the 85 percent rule of thumb are conventions of the trade, not norms; ISO 22400-2:2014 is described as read in November 2026 and is under revision. Education only, not engineering, safety or accounting advice.