Contribution margin at the constraint, avoidable cost everywhere else, the Pareto in dollars and the business case, worked on a sold-out press and a demand-limited one.
The cost of an hour of downtime is not a plant-wide constant. On a machine whose output is sold out, it is the good parts the hour would have produced times their contribution margin. On a machine with spare capacity, the lost hour is made up from idle time and costs only what the plant actually stops spending, often little more than energy. The same rule gives the value of one OEE point.
Worked in full in The OEE Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
In the fictional molder of The OEE Handbook, Press 2 makes appliance front housings and is the constraint: customer demand for the next year is 900,000 housings against 830,899 the press can make even after its improvement program. Press 1 makes beverage closures and is limited by demand. An hour lost on Press 2 is output lost for good; an hour lost on Press 1 is made up later from idle time.
| Item | Press 2 (constraint) | Press 1 (demand-limited) |
|---|---|---|
| What an hour of downtime loses | Housings that would have been sold | Nothing that is not made up later |
| Basis of the cost | Contribution per good part | Avoidable cost per press-hour |
| Cost of one hour of downtime | $855 (baseline), $974 (after) | About $20 |
Everything below depends on one judgment, so make it explicitly. A machine is the constraint when demand for what it makes exceeds what it can make, and the signs on the floor agree: work queues in front of it, the machines after it wait for it, and it is the one that runs overtime. Compare a year of demand with the machine's capacity at its current OEE, not at nameplate. If no machine is short of capacity, the plant has no constraint inside it, every hour of downtime is cheap, and the case for an OEE program has to rest on cost avoided rather than output gained.
Use the cash each extra part brings in, net of the costs that vary with it. A housing sells for $11.40; packaging costs $0.30 and material $4.70.
Contribution = $11.40 - $0.30 - $4.70 = $6.40 a housing
Labor, maintenance, depreciation and plant overhead are fixed in the short run in the case, so they stay out. Valuing lost hours at selling price or at full absorbed cost is the most common way a downtime figure becomes too large to be believed by the controller.
At the ideal rate of 180 housings an hour, one hour of fully productive time on Press 2 is worth 180 x $6.40 = $1,152. That is the right rate for pricing losses already expressed in fully productive hours, which is what the six big losses are.
A stopped hour does not cost $1,152, because the press would not have run at the ideal rate with zero scrap if it had been running. Multiply by the performance and quality the press actually achieves: at the baseline (79.3 percent and 93.6 percent) an hour of Press 2 downtime costs $855; after the program (87.9 percent and 96.3 percent) it costs $974. Better running makes each remaining stop more expensive, which is why the next target after a successful program is often the stops that were tolerable before.
On Press 1 the cost is the avoidable cost of a press-hour: $20 of energy and utilities. If the plant would also send people home or cut overtime when the press stops, the avoidable cost rises to $78. The case uses the energy-only figure because staff are not sent home for a stopped press; write your own rule down.
Ranked in hours, the largest loss in the plant is Press 3 changeovers at 880 hours. Ranked in dollars, at $1,152 an hour on Press 2 and $20, $18 and $12 on the other presses, the five largest losses are all on Press 2:
| Press 2 loss | Value a year |
|---|---|
| Idling and minor stops | $605,000 |
| Reduced speed | $556,000 |
| Setup and adjustment (changeovers) | $507,000 |
| Breakdowns | $380,000 |
| Other unplanned stops | $336,000 |
Press 3's 880 hours of changeovers are worth $16,000. A team that works the hours Pareto starts in the wrong place; the dollar Pareto sets the priorities. The six big losses themselves are worked in the OEE formula worked step by step.
One point of OEE on Press 2 is 1 percent of 5,928 hours, 59.28 fully productive hours, or 10,670 good housings. What it is worth depends on what the plant does with it:
The same point is worth almost fifty times more when the market takes the extra parts. On a demand-limited machine, an OEE gain shows up as idle time rather than output, as TEEP vs OEE vs OOE explains, and only the avoidable cost of those hours is real money.
The plant's 12-month program cost $573,000 ($357,000 of capital and $216,000 of one-off expense) and lifted Press 2 from 60.9 percent to 77.1 percent, a gain of 16.2 points. The full-year value depends on the same question as the hourly cost:
| Scenario | Value a year | Payback | Net present value |
|---|---|---|---|
| Extra housings sold | $1,181,000 | 6.1 months | $3,677,000 |
| Extra housings not sellable | $152,000 | 74.7 months | -$224,000 |
The program was approved on the first scenario because the customer's demand was in hand. Another check: buying the extra output with weekend work would have taken 65.6 Saturdays a year, more than the 52 in a year, and about $190,000 of premiums at $2,900 per Saturday.
The free OEE Calculator prices each machine's losses at the contribution per part when you flag it as the constraint and at your avoidable cost per hour otherwise, and returns the cost of an hour of downtime for each. For the accounting side of idle capacity, see the cost of unused capacity.
If the machine's output is sold out, multiply the good parts it makes in an hour (ideal rate x performance x quality) by the contribution margin per part. If it has spare capacity, the cost is only what the plant stops spending when it is idle, usually energy and any labor actually sent home.
No. Use contribution margin: price minus the costs that vary with each extra part, such as material and packaging. Selling price and full absorbed cost both overstate what an hour is worth.
One point equals 1 percent of planned production time in fully productive hours. In the worked case it is worth $68,288 a year on the constrained press if the parts are sold, $5,632 if only staffed hours are saved and $1,423 on energy alone.
Because the press now runs faster and makes fewer bad parts, so each hour it stops loses more good output: $855 at the baseline, $974 after in the worked case.
This guide is one arc of The OEE Handbook. The book follows one four-press plant through a measured baseline and a 12-month program: what OEE measures and the time model, availability, performance and the ideal cycle, quality, the six big losses and the Pareto in hours and dollars, data collection and reason codes, TEEP, OOE, aggregation and lines, SMED, TPM, MTBF and MTTR, quality losses, the constraint, the value of an OEE point, the business case and inventory cost, benchmarks, gaming and governance, with checklists and templates.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: OEE Calculator (Excel).
Illustrative figures computed by the book model; Ridgeholt Plastics, Inc. and every person and amount are fictional and invented for illustration, not any plant's data or an industry benchmark. OEE formulas, the six big losses, the minor-stop threshold and the 85 percent rule of thumb are conventions of the trade, not norms; ISO 22400-2:2014 is described as read in November 2026 and is under revision. Education only, not engineering, safety or accounting advice.