Locational Congestion Mechanics, Simultaneous Feasibility, Auction Valuation, Revenue Adequacy, Collateral Risk, and Hedging Across U.S. ISO/RTO and European Markets
Buying for your firm? Add your company name and VAT number at checkout and they go on the invoice. Copies for a whole team: write to us.
About the book
In organized wholesale electricity markets, transmission congestion routinely drives fifty-dollar spreads between adjacent substations. Hedging or trading that spatial wedge through Congestion Revenue Rights (CRRs), Financial Transmission Rights (FTRs), TCCs, TCRs, or European JAO LTTRs requires mastering DC-OPF physics, simultaneous feasibility, regional settlement waterfalls, FERC Order 741 credit rules, cross-product compliance, ASC Topic 815 accounting, and IRC Section 1221(a)(7) tax structuring.
Every formula, funding waterfall, margin call, and tax schedule is worked across one engineering test network and four fictional institutional portfolios: the Redwood-Sierra-Bay 3-Bus System ($100.00/MW-h shadow price, $12,000 hourly rent, 87.5% funding under a 105 MW outage derate), Sierra Valley LSE (CAISO Track 1B 65.0% release cap, 97.08% Flowgate X funding, $265,300 net P&L), Permian Mesa Wind & Solar, LLC (ERCOT 100 MW PTP Obligation $649,000 vs. Option $433,200, -$10.45/MWh break-even reversal spread, August CRRBA make-whole), Chesapeake Grid Trading, LP (PJM 72.0% auction discount, $5,500,000 HSIM collateral, 23.57% ROC, and $1,518,512 GreenHat-style topology margin call), and Rhine-Meuse Interconnector Trading GmbH (EUR 1,523,600 JAO FTR Option vs. PTR+UIOSI equivalence).
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
6-tab Excel calculator for pricing auction bids, comparing PTP/FTR Obligations vs. Options, testing funding waterfalls, and sizing Order 741 collateral carry with Controls = 0.