Compare CAISO Track 1B constraint isolation (97.08% funding), ERCOT CRRBA make-whole refunds ($360,000), and PJM 96.0% pro-rata FTR haircuts.
Two congestion rights with identical Day-Ahead spreads can pay dramatically different cash amounts depending on which ISO governs the shortfall waterfall. Pricing CAISO Track 1B like ERCOT CRRBA or PJM pro-rata is one of the costliest valuation errors in wholesale power markets.
Worked in full in The Congestion Revenue Rights Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
When an unmodeled transmission outage reduces Day-Ahead congestion rent below target allocations, each U.S. ISO allocates the shortfall differently under its FERC-approved tariff or PUCT protocols:
| Market Regime | Shortfall Rule | Surplus Rule | Worked Case Result |
|---|---|---|---|
| CAISO Track 1B (Sec. 36) | Constraint-by-constraint pro-rata; same-constraint intra-month offset only | Zero cross-constraint transfer; surplus refunded to measured demand | Flowgate X 97.08% ($10,000 LSE haircut); Flowgate Y $120,000 to load |
| ERCOT CRRBA (Sec. 7 & 9) | Hourly short-pay, then month-end CRRBA make-whole up to 100% | Excess replenishes $10M CRRBA fund cap (Sec. 7.9.3.5); surplus above $10M distributed to load by LRS | Permian Mesa $36,000 short-pay restored to $360,000; $700,000 above cap to LRS |
| PJM FTRs | Pro-rata haircut on positive FTRs; negative obligations 100% payable | End-of-year make-whole, then residual to ARR holders | Chesapeake Grid 96.0% funding trims $273,312 off positive paths |
In The Congestion Revenue Rights Handbook, Sierra Valley LSE's June settlement proves how CAISO Track 1B shifts exactly $40,000 from CRR holders back to California ratepayers compared to legacy pooled rules: Flowgate X collects $1,330,000 against $1,370,000 of target payouts, while Flowgate Y collects $540,000 against $420,000. Under Track 1B, Flowgate Y's $120,000 surplus cannot subsidize Flowgate X.
The trap: Across PJM, CAISO, and MISO, pro-rata funding haircuts reduce positive target allocations only; counterflow and reversed obligations remain 100.0% payable.
Next steps: master PTDF shift factors and the SFT, audit PJM HSIM collateral and GreenHat lessons, and download the free CRR Valuation & Settlement Calculator (Excel).