Articles

FTR and CRR Collateral Requirements: FERC Order 741, PJM HSIM Margins, and Lessons from GreenHat

How 18 CFR Section 35.47(c) bans unsecured FTR credit, how PJM HSIM sizes $5,500,000 collateral (23.57% ROC), and how a 500 kV topology shift triggers a $1,518,512 margin call.

Under FERC Order No. 741 (18 CFR Section 35.47(c)), RTOs and ISOs cannot extend a single dollar of unsecured credit for Financial Transmission Rights. After the $179 million GreenHat Energy default in PJM, portfolio-level Historical Simulation Model (HSIM) margins and Mark-to-Auction calls govern survival on every power desk.

Worked in full in The Congestion Revenue Rights Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

Worked PJM Portfolio Collateral & Topology-Shift Stress

In The Congestion Revenue Rights Handbook, fictional PJM fund Chesapeake Grid Trading, LP holds three annual and long-term FTR paths (2,102,400 MWh notional, $3,959,520 net auction cost) backed by $5,500,000 of posted cash/LC collateral ($4,850,000 HSIM 99% initial margin + $650,000 Mark-to-Auction buffer at 6.50% carry = $357,500/yr):

Chesapeake Grid MetricBase Case500 kV Topology-Shift Stress
Unsecured Credit Allowed (18 CFR 35.47(c))$0$0
Net Funded FTR Payout (96.0% Pos)$5,613,408-$3,058,992
Portfolio Net P&L (Before Carry)$1,653,888-$7,018,512
Collateral Carry Cost (6.50%, paid to lenders)-$357,500-$357,500
ISO Margin Surplus / (Margin Call Deficit)$7,153,888 Surplus-$1,518,512 ($1,518,512 Call)
Fund Net P&L After 6.50% Carry$1,296,388 (23.57% ROC)-$7,376,012 Total Loss

When a newly energized 500 kV transmission upgrade collapses Path 1 to $0.80/MWh, blows out Path 2 counterflow to -$5.50/MWh, and flips Path 3 long-term obligations to -$1.20/MWh, the -$7,018,512 loss exhausts all $5,500,000 of posted collateral and triggers an immediate $1,518,512 cash margin call.

The trap: HSIM is still a historical simulation. Always supplement ISO HSIM outputs with forward-looking deterministic topology shocks mapped directly to PJM RTEP and ERCOT TPIT upgrade calendars.

Next steps: review CRR vs. FTR settlement waterfalls, verify PTDF shift factors and the SFT, and download the free CRR Valuation & Settlement Calculator (Excel).