Average plant utilization hides fatal bottlenecks behind underloaded departments. This handbook bridges industrial engineering and corporate finance, walking operations leaders and CFOs from honest rated capacity and Rough-Cut Capacity Planning (RCCP) through Theory of Constraints, Kingman queueing physics, SMED exploitation, shift patterns, ASC 330 normal capacity, and five-year after-tax capital decisions.
Every calculation is worked on one fictional U.S. precision manufacturer, Kestrel Precision Components, Inc. (110,000 sq ft, five work centers, 24,000 units surging 25.0 percent to 30,000 units): isolating Work Center 20 at 110.7 percent load, unlocking 936 standard hours via a $45,000 SMED/PM program, and proving why pairing SMED with a fifth 5-axis CNC machine ($845,000 upfront, 81.9 percent load) beats adding a third shift by $803,241 in 5-year NPV (49.1 percent incremental IRR, 19.0-month payback vs. third shift).
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Plant managers, operations directors, production planners, manufacturing engineers, plant controllers, and CFOs evaluating capacity bottlenecks and capital expansion.
Which standards and frameworks are covered?
ASCM/APICS RCCP and CRP, Theory of Constraints and Drum-Buffer-Rope, Kingman's VUT equation and Little's Law, SMED, FLSA 29 U.S.C. Section 207, OSHA General Duty Clause, FASB ASC 330-10-30, and 2026 U.S. federal 100 percent bonus depreciation and 7-year MACRS (as read in November 2026).
Are the Excel workbooks included free?
Yes. Both Production_Capacity_Workbook.xlsx and the standalone Capacity_Planning_Calculator.xlsx are free on this page with zero macros.