An unlocked Excel calculator to compute work-center rated capacity, isolate your plant bottleneck, size your 85 percent protected gap, and price overtime, an added shift, or a new machine.
Most capacity crunches happen because leadership averages utilization across the whole building instead of loading each work center against honest rated capacity. This template isolates your bottleneck, computes your raw and protected capacity gaps, and compares overtime, a third shift, and buying a machine on a 5-year after-tax PV basis.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Capacity_Planning_Calculator.xlsx (16 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Production Capacity Planning Handbook, covering Rough-Cut Capacity Planning, Theory of Constraints, Kingman queueing physics, SMED exploitation, FLSA/OSHA shift economics, ASC 330 overhead absorption, and 5-year capital budgeting.
Paperback, $32.99 PDF edition, $19.99 Book page and full workbook
Related guides: Rough-Cut Capacity Planning example, bottleneck analysis & Theory of Constraints, and add a shift or buy a machine.
It converts your operating calendar, shifts, efficiency factors, product demand, and routings into work-center rated capacity, load percentages, bottleneck identification, protected capacity gap, and a 5-year after-tax cost comparison of overtime, adding a shift, or buying a machine.
No. Every sheet is unlocked, macro-free, and separates blue user inputs from black formulas with a dynamic Controls tab.