Run-of-river and low-head small hydropower sits at the intersection of hydrology, hydraulic engineering, federal FERC licensing, dam safety stewardship, post-OBBBA clean-energy tax law, and non-recourse project finance. This handbook gives developers, sponsors, lenders, engineers, and municipal utilities one rigorous quantitative and regulatory playbook.
Every figure is worked on two fictional cases: Millbrook Falls Hydro Station (owned by Millbrook Hydro Partners, LLC and sponsored by Granite Water Infrastructure Fund II, LP), a 4.80 MW Pit-Kaplan refurbishment (10.80 m net head, 22,825 MWh P50 / 19,173 MWh P90, $21,600,000 CapEx, $2,400,000 DOE Section 247 grant, $7,065,600 Section 48E ITC cash, $8,404,661 P90-bound senior debt, and 15.70 percent 25-year IRR) and Cedar Ridge Municipal Conduit Hydro (0.85 MW PRV retrofit, $867,000 Section 6417 Direct Pay, 5.0-year payback, 19.97 percent IRR).
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Small hydro developers, infrastructure private equity sponsors, project finance lenders, asset managers, civil/hydro engineers, municipal water directors, and energy attorneys.
Does it cover post-OBBBA tax credits, DOE grants, and P90 project finance?
Yes. It models IRC Section 48E ITC vs. Section 45Y PTC post-OBBBA (July 2025), Section 6418 transfers, Section 6417 municipal Direct Pay, DOE Section 242/243/247 grants, and triple-constraint P50/P90 non-recourse debt sizing.
Are the Excel small hydro underwriting workbooks included free?
Yes. Both Millbrook_Falls_Small_Hydro_Case_Workbook.xlsx and the standalone Small_Hydro_Feasibility_and_Project_Finance_Model.xlsx are free on this page, unlocked, and macro-free with Controls = 0.