# The Small Hydropower Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/small-hydro/

1. **Millbrook_Falls_Small_Hydro_Case_Workbook.xlsx**: Complete 8-tab Excel case model reproducing Millbrook Falls Hydro Station (4.80 MW Pit-Kaplan refurbishment, 22,825 MWh P50 / 19,173 MWh P90, $21,600,000 CapEx, $2,400,000 DOE Section 247 grant, $7,065,600 IRC 48E ITC cash, $8,404,661 P90-bound senior debt, 15.70 percent 25-year IRR) and Cedar Ridge Municipal Conduit Hydro (0.85 MW, $867,000 Section 6417 Direct Pay, 19.97 percent IRR), with dynamic Controls = 0.
2. **Small_Hydro_Feasibility_and_Project_Finance_Model.xlsx**: Standalone 6-tab Small Hydro Feasibility and Project Finance Model with a 3-scenario selector (Base, Dry/Stress, Domestic Content 50% ITC Upside), statutory threshold flags, P50/P90 debt sizing, two-way sensitivity matrix, and Controls = 0.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not engineering, legal, tax, or investment advice.
