Navigating the 40 MW Conduit Exclusion (AWIA 2018), 10 MW Exemption, 40-year license default, CWA 401 one-year waiver, FPA Section 18 fishways, and Part 12D dam safety.
In United States small hydropower, choosing between a 40 MW Qualifying Conduit Exclusion (AWIA 2018), a perpetual 10 MW Small Hydro Exemption, and a 40-year FPA Part I license can swing development cost by $4 million and schedule by five years. Here is the exact statutory map verified in 2026.
Worked in full in The Small Hydropower Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
As worked in full in The Small Hydropower Handbook, the Hydropower Regulatory Efficiency Act of 2013 and Section 3002 of AWIA 2018 (codified by FERC Order No. 857) reshaped permitting for run-of-river refurbishments, non-powered dams, and pressurized municipal conduits:
| FERC Authorization Track | Capacity Cap | Term | Core Trade-Off |
|---|---|---|---|
| Qualifying Conduit Exclusion | <= 40 MW | Perpetual | NOI with 30-day public notice only (AWIA 2018); zero FERC license or NEPA EA (e.g., Cedar Ridge 0.85 MW) |
| Conduit Exemption | <= 40 MW | Perpetual | Non-federal conduits not meeting all exclusion criteria (e.g., stream discharge); categorical NEPA exclusion |
| Small Hydro Exemption | <= 10 MW | Perpetual | Existing non-federal dams (pre-July 2005); mandatory FPA Sec. 30(c) agency terms, no eminent domain |
| Standard FPA Part I License | Unlimited | 40-yr default | ILP/TLP/ALP process; preserves FERC balancing and EPAct Sec. 33 trial-type hearings |
Even on an existing dam refurbishment like Millbrook Falls Hydro Station (4.80 MW AC on the fictional Harrow River), three regulatory gates control bankability:
Next, review turbine selection and refurbishment CapEx in low-head hydro refurbishment, flow-duration sizing, and CapEx economics, model P90 debt and post-OBBBA tax credits in small hydro project finance, P90 debt sizing, and post-OBBBA Section 48E/45Y tax credits, and test your own site live in the free Small Hydro Feasibility and Project Finance Model (Excel).
A 10 MW Small Hydro Exemption is issued in perpetuity (no 40-year relicensing cliff), but subjects the owner to mandatory fish and wildlife conditions under FPA Section 30(c) with no federal eminent domain authority. A 40-year FERC license (2017 Policy Statement default) preserves FERC equal-consideration balancing and EPAct 2005 Section 33 trial-type hearing rights.
No. Under FPA Section 30(a) as amended by the Hydropower Regulatory Efficiency Act of 2013 and AWIA 2018 Section 3002 (FERC Order No. 857), qualifying non-federal conduit facilities at or below 40 MW AC (such as the 0.85 MW Cedar Ridge Municipal Conduit case) are completely excluded from FERC licensing and require only a Notice of Intent with a 30-day public notice period.
If a state or tribal certifying authority fails to act on a Section 401 Water Quality Certification request within FERC's categorical one-year reasonable period of time (codified across licenses, exemptions, and amendments in January 2025), certification is statutorily waived.
This guide is drawn from The Small Hydropower Handbook, following run-of-river refurbishments and municipal conduits from hydrology and FERC licensing through turbine CapEx, post-OBBBA tax credits, and P90 project finance.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Small Hydro Feasibility and Project Finance Model (Excel).