Book · Julian R. Sterling
Fuel Supply, Offtake, Emissions Credits, and Lender Due Diligence for Wood, Agricultural Residue, and Waste Biomass Plants
Google Play Paperback, $32.99 PDF edition, $19.99
Buying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.
A biomass power plant is the only utility-scale renewable generator whose fuel must be harvested, chipped, dried, hauled by truck, weighed on a scale, stored without catching fire, and fed into a boiler twenty-four hours a day for twenty years. This handbook delivers the complete institutional playbook for financing wood, agricultural residue, and waste biomass power plants from basinshed fuel physics to distressed workouts.
Every calculation is worked on one fictional project: the 40.0 MW net Timberline Biomass Generating Station of Timberline BioPower, LLC, a bubbling fluidized bed plant burning 250,433 bone dry tons (431,781 green tons, 47.3 chip vans per day) of sawmill residuals, forestry slash, and agricultural/urban wood waste under a 20-year utility PPA and a 10-year Class I REC contract. The $253.2 million financing combines $95.0 million of IRC Section 142(a)(6) tax-exempt solid waste bonds, a $60.0 million senior taxable term loan, and $98.2 million of sponsor equity: 1.74x Year 2 DSCR, 1.38x minimum DSCR in Year 15, 8.4 percent base equity IRR (13.5 percent with Section 48E transferability net of the statutory 15 percent tax-exempt bond haircut), and a full Section 45Q BECCS retrofit analysis.
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.00.
Complete case model
8 tabs rebuilding feedstock physics and daily chip-van logistics, Sources and Uses with IRC 142(a)(6) solid waste bonds, the 20-year projection, DSCR/LLCR/PLCR, Base and Section 48E Equity IRR, 14 Year 2 stress cases, exact break-evens, and Section 45Q BECCS retrofit math.
Download Timberline_Biomass_Project_Finance_Workbook.xlsx37 KBStandalone practitioner tool
Converts any biomass plant's megawatts, moisture content, 3-tier feedstock basket, and PPA/REC tariff into green tons, daily truckloads, CFADS, DSCR, break-evens, and a 6-scenario stress matrix.
Download Biomass_Fuel_Supply_and_PPA_Model.xlsx17 KBWant the standalone model first? Open the free Biomass Fuel Supply and PPA Model (Excel) page.
Project finance lenders, infrastructure equity sponsors, utility financial advisors, biomass developers, independent engineers, and analysts modeling wood, agricultural residue, or waste biomass power plants.
Yes. All legal frameworks reflect November 2026 law, including Treasury TD 10024 LCA/PER rules for Sections 45Y and 48E, the July 2025 One Big Beautiful Bill Act (P.L. 119-21) baseload 2033 runway and Prohibited Foreign Entity rules, IRC Section 142(a)(6) solid waste bonds, Section 45Q BECCS parity, Clean Air Act Boiler MACT, and the December 2025 California BioMAT sunset.
Yes. Both Timberline_Biomass_Project_Finance_Workbook.xlsx and the standalone Biomass_Fuel_Supply_and_PPA_Model.xlsx are free on this page, unlocked and macro-free, with Controls equal to 0.00.