An unlocked workbook that turns any biomass plant's megawatts, moisture content, 3-tier feedstock basket, and PPA/REC tariff into daily chip-van logistics, CFADS, DSCR, break-evens, and a 6-scenario stress matrix.
Loaded with the fictional 40.0 MW Timberline BioPower case, this model calculates 250,433 BDT/yr (47.3 chip vans/day at 42 percent moisture, jumping to 61.4 vans/day at 52 percent moisture), Year 2 CFADS of $28.56 million, 1.74x base DSCR, 1.48x under a +35 percent fuel spike (1.74x with pass-through), and Controls = 0.00.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Biomass_Fuel_Supply_and_PPA_Model.xlsx (17 KB)
Unsubscribe in one click. How your address is used.
Built from The Biomass Power Project Finance Handbook, following the fictional 40.0 MW Timberline Biomass Generating Station through its $253.2 million financing, IRC Section 142(a)(6) bonds, Section 48E transferability, 14 stress tests, and Section 45Q BECCS retrofit.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: How a Biomass Fuel Supply Agreement Works in Project Finance, Biomass Power PPA Pricing and DSCR Modeling, Biomass Power Tax Credits, RECs, and BECCS Under 2026 Rules.
Six unlocked tabs: README, Inputs (net MW, availability, heat rate, moisture, 3-tier feedstock basket, PPA capacity/energy/REC rates, O&M, MMRA, and debt service), Fuel_Physics (BDT, green tons, daily walking-floor chip vans, wet-fuel penalty), PPA_Economics (CFADS, DSCR, break-even fuel price and availability), Stress_Matrix (6 scenarios including full fuel pass-through), and Controls = 0.00.
Yes. Simply edit the three blue feedstock tier shares, delivered $/BDT prices, moisture content, and net heat rate on Inputs.
Those live in the full 8-tab Timberline case workbook free on the book page. This standalone model focuses on steady-state fuel physics, PPA economics, and 6 lender stresses.