Companion files · The Renewable Energy Development Handbook

The Renewable Energy Development Handbook

Taking Solar and Wind Projects from Site Control to Commercial Operation: Land, Permits, Interconnection, PPAs and Financing.

The DRM-free PDF edition, $19.99 → Read the first chapter freeBuying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.

These are the companion files of the book. One workbook rebuilds Cedar Hollow Solar, the fictional 150 MWac / 195 MWdc project the book follows from the first land option in 2022 to commercial operation in 2028: its capital cost, its energy yield and exceedance levels, market prices, a 20-year utility PPA, a 15-year virtual PPA and the merchant case, the production tax credit and the ITC alternative, the foreign entity test, debt and tax equity, a wind alternative and a battery option, and the value of the project at each development milestone. A second file holds the diligence checklists of Appendix B in editable form. Around them: a blank copy of the workbook for your own project, eight documents to print, forty questions and three cases the book names but does not work. No sign-up, no email is asked for, nothing is locked. Amounts are in US dollars; blue type is an input, black type is a formula.

All the companion files and the read-me, in one archive1034 KB

The archive holds the workbook, the checklists, the blank model set, eight working documents, forty questions and three new worked cases, with 00_START_HERE.md at its root. Each group below can also be downloaded on its own. Last revised 16 November 2026. No macros, no circular references, no external links. The workbook recalculates in Excel, LibreOffice or Google Sheets.

Reading the paperback or the Kindle edition? The same book is also sold as a DRM-free PDF: searchable, printable, yours on any device. $19.99, instant download.Buy the PDF edition → Free sample

Finished the book? Two or more PDF editions bought together are 15% off. Browse the PDF editions →
The working models behind the books, built out for live deals: the Pro models →

Learn to model and size a project, step by step: the Project Finance Modeling course →

Get an email if these files are corrected

Optional. When the workbook on this page is corrected or a new worked case goes up, readers on the list get one email, plus a short note when a new book comes out. The downloads do not need it.

Join the reader list

Run by MailerLite, off this site. How your address is used.

The files

The documents the chapters describe

Eight pages to print and use. A4, with margins wide enough for US Letter.

Three cases the book does not work

New material, not a restatement. Each case takes a situation the book names and does not compute. Each is the companion workbook with three sheets in front: the note, the case beside the book, and checks that end ALL OK. Values the book does not give are inputs, marked ADDED.

Three numbers to reproduce first

The offtakeThe right to build Cedar Hollow is worth $33.4 million with the utility PPA, $15.2 million with the corporate virtual PPA and minus $38.2 million fully merchant, against a $27.0 million premium paid at notice to proceed
The creditThe production tax credit carries $73.0 million of that value: with the ITC instead the project is worth $6.6 million, and with no credit minus $39.6 million
The milestonesThe project is worth $0.02 million at site control and $35.1 million at notice to proceed; the biggest step, $11.8 million, comes with the PPA and the start of construction in 2026

What changed, and when

16 Nov 2026Added eight working documents to print, the blank model set with the book’s inputs, forty self-marking questions and three new worked cases (the delay nobody pays for, a basis that widens, the earnout and the seller’s odds). The workbook is unchanged: recalculated, its Checks sheet still reads ALL OK on 431 printed figures and 10 identities.
10 Oct 2026Companion files published with the book.

The files are provided as they are, without warranty of any kind. The model is illustrative: Cedar Hollow Solar, Hartwell Ridge Wind, Calder Plains Renewables, Ashgrove Clean Power Fund, Norland Electric Cooperative, Quillon Data Systems, Ironbridge Constructors, Larkspur Solar Manufacturing and Marlow County are fictional, and the figures are the book's assumptions, not market statistics or forecasts. Nothing here is investment, legal, tax, accounting or engineering advice.

Free: the Private Markets Interview Cheat Sheet

Forty private markets interview questions with model answers and the arithmetic worked out. Direct download, no sign-up.

Get the cheat sheet

Explore the full companion library

Discover more of Julian R. Sterling's practical library of models, checklists and worked cases.

Browse Julian R. Sterling's books Browse all companion files

Also by Julian R. Sterling

More in infrastructure and energy, with free companion files. The full list of titles is on the author page.