Companion files · The Renewable Energy Development Handbook
Taking Solar and Wind Projects from Site Control to Commercial Operation: Land, Permits, Interconnection, PPAs and Financing.
The DRM-free PDF edition, $19.99 → Read the first chapter freeBuying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.
PDF, $19.99 Apple Books Google Play
These are the companion files of the book. One workbook rebuilds Cedar Hollow Solar, the fictional 150 MWac / 195 MWdc project the book follows from the first land option in 2022 to commercial operation in 2028: its capital cost, its energy yield and exceedance levels, market prices, a 20-year utility PPA, a 15-year virtual PPA and the merchant case, the production tax credit and the ITC alternative, the foreign entity test, debt and tax equity, a wind alternative and a battery option, and the value of the project at each development milestone. A second file holds the diligence checklists of Appendix B in editable form. Around them: a blank copy of the workbook for your own project, eight documents to print, forty questions and three cases the book names but does not work. No sign-up, no email is asked for, nothing is locked. Amounts are in US dollars; blue type is an input, black type is a formula.
The archive holds the workbook, the checklists, the blank model set, eight working documents, forty questions and three new worked cases, with 00_START_HERE.md at its root. Each group below can also be downloaded on its own. Last revised 16 November 2026. No macros, no circular references, no external links. The workbook recalculates in Excel, LibreOffice or Google Sheets.
Reading the paperback or the Kindle edition? The same book is also sold as a DRM-free PDF: searchable, printable, yours on any device. $19.99, instant download.Buy the PDF edition → Free sample
Finished the book? Two or more PDF editions bought together are 15% off. Browse the PDF editions →
The working models behind the books, built out for live deals: the Pro models →
Learn to model and size a project, step by step: the Project Finance Modeling course →
Optional. When the workbook on this page is corrected or a new worked case goes up, readers on the list get one email, plus a short note when a new book comes out. The downloads do not need it.
Join the reader listRun by MailerLite, off this site. How your address is used.
Chapters 1 to 15 · Appendix A
One Inputs sheet holds every assumption, each with a range name, and the scenario switches: offtake case, credit, bonus, energy level, capital cost, module price, network upgrades, hub price and discount rates. Capex, Energy, Market, Opex and Credits build the project year by year from 2028 to 2062. Cases values the utility PPA, the virtual PPA and the merchant case: development value and its bridge, the highest premium a buyer can pay, IRR, and values at COD and in 2038. Breakeven finds the PPA price that leaves the buyer at its discount rates, and Sensitivities draws the tornado. Then site screening, interconnection deposits and upgrade shocks, stage values and the developer's return, sales at earlier stages, debt and tax equity, the foreign entity test, the wind alternative, the battery option, EPC delay damages, and a Checks sheet that sets 431 figures the book prints beside the cells that compute them.
Download the workbook213 KBAppendix B
Land and site control, resource and energy yield, permits, interconnection, offtake, equipment and foreign entity documentation, the EPC contract, tax credits, financing and closing at NTP, and construction to COD. Edit them for your own project.
Download the checklists40 KBRead first
Which sheet answers which chapter, and the two inputs to change first.
Download the read-me5 KBFor your own project · Appendix A
The same workbook with its 207 case inputs emptied: size and energy, losses and uncertainty, land, capital cost, development spend and stage probabilities, market, offtake, credits, rates, debt, tax equity, the screening sites, the wind and battery options and the EPC terms. The structure, the statutory rules and the switches stay. Until every input is filled, every formula shows nothing and Inputs counts what is missing; ten identities check the result for any inputs. book_inputs.txt lists the book’s values cell by cell: typed back in, they reproduce the full workbook exactly.
Download the blank set193 KBChapters 1 to 15 · The three cases
Six parts: risk retired and stage values; screening, land and energy yield; permits, interconnection and offtake; costs, the EPC contract and tax credits; financing, storage and the sale; and the three new cases. Numbers and multiple choice, marked as you type; a score sheet tells you which part to revise first.
Download the questions14 KBEight pages to print and use. A4, with margins wide enough for US Letter.
Chapters 1 to 15 · Appendix B
The milestone ladder with stage values; the site screening sheet with the five screens and the levelized cost; the land and lease abstract with the title and curative tracker; the energy yield review sheet (losses compounded, uncertainties combined, P50 to P99); the permit critical path and the interconnection deposit ladder; the PPA comparison grid with the risk allocation; the EPC review of delay damages by cause, retention and the performance test; and the credit file with the NTP sale pricing. Each page carries Cedar Hollow’s figures as a worked example beside blank columns for your project.
Download the PDF24 KBNew material, not a restatement. Each case takes a situation the book names and does not compute. Each is the companion workbook with three sheets in front: the note, the case beside the book, and checks that end ALL OK. Values the book does not give are inputs, marked ADDED.
Chapters 11 and 15 · Case one
Chapter 15 says every month of delay adds construction interest, then leaves it out. With it, a month costs Ashgrove $2.29 million, not $1.65 million, and Ironbridge’s $1.60 million leaves $0.70 million a month uncovered. A three-month grid delay costs the owner $6.87 million and nobody else pays; late modules need supply damages of $502 per MWac per day, 1.44 times the EPC rate; and on the 2027 backstop an 8.0 percent chance of slipping would use up Ashgrove’s whole headroom.
Chapter 7 · Case two
“A basis that widens as new solar crowds the node hurts Cedar Hollow under case C, not under case U.” At $0.25/MWh a year (ADDED), case C loses $11.2 million and falls to $4.0 million, case U only $4.3 million. A widening of $0.34 a year erases case C, which loses more per dollar than the merchant case because the model discounts the basis under contract at 7.0 percent. Faster capture decline, by contrast, lands on Quillon until 2042.
Chapters 5 and 14 · Case three
“A seller who thinks the LGIA is more likely than 81 percent can rationally prefer the earnout.” How much more likely: 91.0 percent, ten points, not one. If both milestones slip a year (ADDED), no odds are enough. At the book’s odds, the earnout is fair with $2.55 million at signing instead of $2.0 million, or a $10.96 million headline.
Download the three cases583 KB| The offtake | The right to build Cedar Hollow is worth $33.4 million with the utility PPA, $15.2 million with the corporate virtual PPA and minus $38.2 million fully merchant, against a $27.0 million premium paid at notice to proceed |
| The credit | The production tax credit carries $73.0 million of that value: with the ITC instead the project is worth $6.6 million, and with no credit minus $39.6 million |
| The milestones | The project is worth $0.02 million at site control and $35.1 million at notice to proceed; the biggest step, $11.8 million, comes with the PPA and the start of construction in 2026 |
| 16 Nov 2026 | Added eight working documents to print, the blank model set with the book’s inputs, forty self-marking questions and three new worked cases (the delay nobody pays for, a basis that widens, the earnout and the seller’s odds). The workbook is unchanged: recalculated, its Checks sheet still reads ALL OK on 431 printed figures and 10 identities. |
| 10 Oct 2026 | Companion files published with the book. |
The files are provided as they are, without warranty of any kind. The model is illustrative: Cedar Hollow Solar, Hartwell Ridge Wind, Calder Plains Renewables, Ashgrove Clean Power Fund, Norland Electric Cooperative, Quillon Data Systems, Ironbridge Constructors, Larkspur Solar Manufacturing and Marlow County are fictional, and the figures are the book's assumptions, not market statistics or forecasts. Nothing here is investment, legal, tax, accounting or engineering advice.
Forty private markets interview questions with model answers and the arithmetic worked out. Direct download, no sign-up.
Get the cheat sheetDiscover more of Julian R. Sterling's practical library of models, checklists and worked cases.
Browse Julian R. Sterling's books Browse all companion filesMore in infrastructure and energy, with free companion files. The full list of titles is on the author page.