Free Excel Templates

SPRS Score Calculator (Excel)

An unlocked Excel calculator for CMMC Level 2: set each of the 110 NIST SP 800-171 Rev. 2 requirements to MET, NOT MET, PARTIAL or N/A and read your SPRS score, whether Conditional status is available, the POA&M and its 180-day deadline, and a budget.

A Level 2 score starts at 110 and loses 5, 3 or 1 point for every requirement NOT MET, down to -203. A score of 88 opens Conditional status only if every open finding is a 1-point item that may sit on a POA&M. This calculator does the arithmetic and the eligibility test in one place, with checks that must read zero before a number goes anywhere near SPRS.

Get the Excel calculator

One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once, along with the other free models.

SPRS_Score_Calculator.xlsx (39 KB)

You join the reader list: one email when a new free model or book comes out. Unsubscribe in one click. Already subscribed? Enter the same address. How your address is used.

The handbook behind this calculator

This calculator is the reusable core of the 13-tab workbook in The CMMC Compliance Handbook, which takes one machine shop from a score of 104 posted without an assessment, through a gap assessment at -35 and a mock at 89 that was not enough, to Conditional status at 102 and a Final Level 2 (Self) status at 110: the rules and the phases, FCI and CUI, scoping and enclaves, cloud and MSPs, the 110 requirements, the score, POA&Ms, assessments, affirmations, False Claims Act exposure and the budget.

Paperback PDF edition, $19.99 Book page and full workbook

What is inside the workbook

Start
What the file does, how to use it in six steps, the rules applied as read in November 2026 and the limits of a calculator.
Assessment
The 110 requirements, one row each: CMMC identifier, family, a short paraphrased title, basic or derived, point value (5, 3, 1 or none for the SSP), partial-credit value, the POA&M flags, and a blue status cell (MET, NOT MET, PARTIAL or N/A) with a column for where the evidence is kept. Company name, assessment date and scope at the top.
Results
Counts by status, findings, points lost, the SPRS score and its ratio to 110, the 88-point test, the number of blockers, the status available (Final, Conditional or Not eligible), the SSP warning, the closeout deadline and affirmation dates from the Conditional CMMC Status Date you enter, the points lost in each of the 14 families and the list of findings that block Conditional status.
POAM
The POA&M-eligible findings, listed automatically with their points, and blue columns for owner, milestones, planned completion and closing date, with the days used against the 180 allowed and a late flag.
Budget
One-time and annual lines for a CUI enclave (Option A) against an enterprise-wide scope (Option B), the three-year cost of ownership, the shares of your DoD revenue, and a DoD estimate of assessment costs from the regulatory impact analysis that you can add to Option A.
Checks
13 tests, from blank or misspelled statuses and PARTIAL on a requirement without partial credit to the 313-point total, the score range, the POA&M totals, late closures and the budget arithmetic. The total counts the exceptions and must read zero.

The prefilled example

The file opens with Example Co., an illustrative company whose every status, date and amount is invented. Its scope is a CUI enclave of 10 users and its assessment date is December 15, 2026. 8 one-point requirements are NOT MET, SC.L2-3.13.11 is PARTIAL (encryption employed but not FIPS-validated) and two wireless requirements are N/A: 9 findings, 11 points lost, a score of 99, a ratio of 0.900 and no blocker, so Conditional status is available with 9 items on the POA&M. With a Conditional CMMC Status Date of December 15, 2026, the closeout deadline is June 13, 2027, the next annual affirmation is due before December 15, 2027 and a new assessment before December 15, 2029.

On the Budget tab, Option A (enclave) costs $105,000 once and $42,100 a year, $231,300 over three years; Option B (enterprise-wide, 40 users) costs $140,000 and $85,900, $397,700. With the DoD estimate for a Level 2 (C3PAO) small entity over three years ($104,670) added, Option A reaches $335,970. Type over the blue cells to enter your own.

How to use it

  1. Save a copy, then set the company, the assessment date and the scope you are assessing (one CMMC UID at a time).
  2. Assess each requirement against its NIST SP 800-171A objectives and enter the status. MET means every objective met on final evidence, not drafts.
  3. Read the Checks tab: it must read zero.
  4. Read the Results tab: score, status available, blockers. Fix the blockers before you think about a POA&M.
  5. Once the result is entered in SPRS, enter the Conditional CMMC Status Date: the POAM tab then tracks the 180 days and the affirmation dates follow.

For the arithmetic behind the score, read how to calculate your SPRS score; for the POA&M rules, CMMC POA&M requirements and Conditional status; for the money, what CMMC Level 2 costs.

The calculator adds up the statuses you enter; it does not test the assessment objectives, make a company compliant or replace a C3PAO or DIBCAC assessment. A misstated score posted in SPRS can carry False Claims Act exposure. Rules as read in November 2026. Education only, not legal advice.

Questions practitioners ask

What does the calculator compute?

From one status per requirement it returns the SPRS score under the 32 CFR 170.24 point values (maximum 110, minimum -203), the points lost by family, whether Conditional status is available under 32 CFR 170.21, the findings that block it, the POA&M list with its 180-day closeout deadline, the next affirmation and assessment dates, and a budget comparing a CUI enclave with an enterprise-wide scope.

How are partial credit and N/A handled?

N/A counts as MET. PARTIAL applies only to IA.L2-3.5.3 (multifactor authentication for remote and privileged users but not general users) and SC.L2-3.13.11 (encryption employed but not FIPS-validated), each 3 points lost instead of 5. PARTIAL entered on any other requirement is scored as NOT MET and flagged on the Checks tab.

Does a score from the calculator mean my company is compliant?

No. The calculator adds up the statuses you enter. Whether a requirement is MET depends on the NIST SP 800-171A assessment objectives and on final evidence, which only an assessment can establish. A score entered in SPRS is a representation by your affirming official.

Is it updated for Phase 2 or Rev. 3?

It encodes the rules as read in November 2026: NIST SP 800-171 Rev. 2, which is the CMMC baseline, and the 32 CFR part 170 point values. The point values and POA&M flags are blue cells so they can be updated if the DoD changes them.