A POA&M is allowed only if the score is at least 88, every open item is worth 1 point (or 3 for encryption that is not FIPS-validated) and none of six excluded requirements is open; it must close within 180 days.
Under 32 CFR 170.21, a CMMC Level 2 assessment can end in Conditional status with a POA&M only if three tests pass: a score of at least 88 out of 110, no open item worth more than 1 point except SC.L2-3.13.11 at 3 points, and none of six excluded requirements open. The POA&M must then be closed within 180 days.
Worked in full in The CMMC Compliance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
A plan of action and milestones lists the requirements an assessment found NOT MET, with the tasks, resources and dates to close them. Under CMMC it is a narrow tool. A POA&M is not a substitute for a completed requirement, and there is no POA&M at all at Level 1, where all 15 requirements must be fully implemented. At Level 2 it is the bridge between an assessment that is nearly there and a Final status: it allows a Conditional status while a small number of low-value gaps are closed.
Do not confuse it with the operational plan of action. A temporary deficiency covered by an operational plan of action, with progress toward correction, is scored MET under 32 CFR 170.24. A POA&M item is NOT MET and costs its points.
| Requirement | Short title | Point value |
|---|---|---|
| AC.L2-3.1.20 | Verify and control connections to external systems | 1 |
| AC.L2-3.1.22 | Control CUI posted on publicly accessible systems | 1 |
| CA.L2-3.12.4 | System security plan (SSP) | none |
| PE.L2-3.10.3 | Escort and monitor visitors | 1 |
| PE.L2-3.10.4 | Maintain audit logs of physical access | 1 |
| PE.L2-3.10.5 | Control and manage physical access devices | 1 |
Put together, the rules leave 47 of the 110 Level 2 requirements that can ever be on a POA&M: the 46 one-point requirements not excluded, plus SC.L2-3.13.11 in its 3-point case. Every 5-point and 3-point requirement must be MET on the day of the assessment, and so must multifactor authentication, even in its 3-point partial case.
Marrowfield Precision Components, Inc., the fictional machine shop of The CMMC Compliance Handbook, ran an internal mock assessment of its new CUI enclave on May 15, 2026. It scored 89, above the 88-point threshold, with 9 requirements NOT MET:
| Requirement | Short title | Points lost | Allowed on a POA&M |
|---|---|---|---|
| AU.L2-3.3.5 | Correlate audit review, analysis and reporting | 5 | No |
| IA.L2-3.5.3 | Multifactor authentication (partial) | 3 | No |
| IR.L2-3.6.3 | Test the incident response capability | 1 | Yes |
| MA.L2-3.7.6 | Supervise maintenance personnel without access authorization | 1 | Yes |
| MP.L2-3.8.9 | Protect the confidentiality of backup CUI | 1 | Yes |
| PE.L2-3.10.6 | Safeguarding measures at alternate work sites | 1 | Yes |
| RA.L2-3.11.2 | Scan for vulnerabilities periodically and when new ones are identified | 5 | No |
| SC.L2-3.13.11 | FIPS-validated cryptography to protect CUI (partial) | 3 | Yes |
| SC.L2-3.13.12 | Block remote activation of collaborative computing devices | 1 | Yes |
The deduction is 21 points, so the score passes the first test. It fails the second: correlated audit review (5 points), multifactor authentication in its partial case (3 points) and vulnerability scanning (5 points) cannot be on a POA&M. Had this result been entered in SPRS, the status would have been Not eligible, not Conditional. The company fixed those three before its real self-assessment.
The trap: reading 88 as a pass mark. A score of 88 or more is necessary, not sufficient. One 3-point or 5-point finding, or one of the six excluded requirements, closes the door to Conditional status even at 109.
On June 30, 2026 Marrowfield entered a Level 2 self-assessment in SPRS. Six requirements were still NOT MET, for a deduction of 8 points:
| Requirement | Short title | Points lost | Allowed on a POA&M |
|---|---|---|---|
| IR.L2-3.6.3 | Test the incident response capability | 1 | Yes |
| MA.L2-3.7.6 | Supervise maintenance personnel without access authorization | 1 | Yes |
| MP.L2-3.8.9 | Protect the confidentiality of backup CUI | 1 | Yes |
| PE.L2-3.10.6 | Safeguarding measures at alternate work sites | 1 | Yes |
| SC.L2-3.13.11 | FIPS-validated cryptography to protect CUI (partial) | 3 | Yes |
| SC.L2-3.13.12 | Block remote activation of collaborative computing devices | 1 | Yes |
The score is 102 and the ratio 102/110 = 0.927. Every item is a 1-point requirement that may be on a POA&M, plus SC.L2-3.13.11 in its 3-point case: the backup appliance encrypted CUI but could not yet be shown to run a validated module in its validated mode. All three tests pass, so the status is Conditional Level 2 (Self), and June 30, 2026 is the Conditional CMMC Status Date. The affirming official affirmed in SPRS the same day, and the subcontract was awarded on August 3, 2026.
Two what-ifs on the same assessment show how thin the line is. Had MFA covered only remote and privileged users, the score would have been 99 and the status Not eligible, because IA.L2-3.5.3 at 3 points cannot be on a POA&M. Had the physical access logs (PE.L2-3.10.4, 1 point) been missing, the score would have been 101 and the status Not eligible, because that requirement is excluded. Both scores are higher than 88; neither qualifies.
The closeout assessment covers only the NOT MET requirements on the POA&M and must be completed within 180 days of the Conditional CMMC Status Date, or the Conditional status expires. For Level 2 (Self) the contractor performs it in the same way as the initial self-assessment; for Level 2 (C3PAO) a C3PAO performs it. A successful closeout gives Final status, and the affirming official affirms again.
| Date | Marrowfield | Example Co. (calculator) |
|---|---|---|
| Conditional CMMC Status Date | June 30, 2026 | December 15, 2026 |
| POA&M closeout deadline (180 days) | December 27, 2026 | June 13, 2027 |
| Closeout completed | October 14, 2026 (106 days used), score 110, Final Level 2 (Self) | open |
| Next annual affirmation before | June 30, 2027 | December 15, 2027 |
| New assessment before | June 30, 2029 | December 15, 2029 |
The affirmation and reassessment deadlines run from the Conditional CMMC Status Date when a POA&M was required, not from the closeout date. Example Co., the illustrative company of the free SPRS Score Calculator, scores 99 with 9 items on its POA&M worth 11 points and no blocker, so it too qualifies for Conditional status, with a closeout deadline of June 13, 2027.
A Conditional status is current for no more than 180 days. Contracting officers check SPRS and do not award a contract, exercise an option or extend performance without a current CMMC status at the required level, and clause 252.204-7021 requires the contractor to maintain that status for the duration of the contract. An expired Conditional status leaves the company with no current Level 2 status. Plan the closeout well inside the window: Marrowfield used 106 of its 180 days.
The POAM tab of the free SPRS Score Calculator lists the eligible findings automatically and flags any closing date beyond the window. For the scoring behind each line, see how to calculate an SPRS score; for the budget that funds the tasks, see what CMMC Level 2 costs.
Under the phased plan of 32 CFR 170.3(e), Level 2 (C3PAO) was to become a condition of award for applicable contracts from November 10, 2026. As reported, a DoD CIO memorandum of July 13, 2026 suspended Phase 2 while a task force reviewed the program, and Level 1 (Self) and Level 2 (Self) remain in force. If Phase 2 is reinstated, the same three tests and the same 180 days would apply to a C3PAO assessment, with the closeout performed by the C3PAO. The CMMC Compliance Handbook sets out how to plan under that uncertainty.
No. At Level 2 no POA&M item may be worth more than 1 point, except SC.L2-3.13.11 in its 3-point case (encryption employed but not FIPS-validated). Every 5-point requirement must be MET at the assessment.
It passes the score test, since 88/110 is 0.8. Conditional status also requires that every open item may be on a POA&M and that none of the six excluded requirements is open.
AC.L2-3.1.20 (external connections), AC.L2-3.1.22 (CUI on publicly accessible systems), CA.L2-3.12.4 (system security plan), PE.L2-3.10.3 (escort visitors), PE.L2-3.10.4 (physical access logs) and PE.L2-3.10.5 (physical access devices).
Only the NOT MET requirements on the POA&M. It must be completed within 180 days of the Conditional CMMC Status Date, by the contractor for Level 2 (Self) and by a C3PAO for Level 2 (C3PAO).
No. At Level 1 all 15 requirements must be fully implemented and there is no Conditional status.
Rules as read and figures verified on November 22, 2026.
This guide is one arc of The CMMC Compliance Handbook. The book follows one machine shop from a score posted without an assessment to a Final Level 2 (Self) status: the two CMMC rules and the phases, FCI and CUI, the contract clauses and the part 240 deviation, scoping and enclaves, cloud and MSPs, the 110 requirements family by family, the SPRS score, POA&Ms and Conditional status, self-assessment and C3PAO assessments, affirmations and False Claims Act exposure, and the budget.
Paperback PDF edition, $19.99 Book page and companion workbooks
Free download: SPRS Score Calculator (Excel).
Illustrative figures computed by the book model; Marrowfield Precision Components, Inc., Example Co. and every person, score, date and amount are fictional and invented. The DoD cost figures are estimates from the regulatory impact analysis of the final rule, in 2023 dollars, not prices. Rules described as read in November 2026; the suspension of Phase 2, the reported revisions of the DFARS class deviation and any move to NIST SP 800-171 Rev. 3 may change them. Education only, not legal advice, and no guide or spreadsheet makes a company compliant.