The DoD estimates $37,196 for Level 2 (Self) and $104,670 for Level 2 (C3PAO) over three years at a small entity, but assumes the requirements are already in place; remediation is usually the larger bill.
The DoD estimates the cost of CMMC Level 2 for a small entity at $37,196 over three years for a self-assessment and $104,670 for a C3PAO certification, in 2023 dollars. Both figures assume the 110 requirements are already implemented. In the worked case, an 85-employee machine shop spends $194,190 once and $71,292 a year to get there.
Worked in full in The CMMC Compliance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
The regulatory impact analysis of the 32 CFR part 170 final rule estimates what an assessment and its affirmations cost, by level and by size of entity, in 2023 dollars. They are estimates, not prices, and they rest on one assumption that matters more than any number in the table: the NIST SP 800-171 requirements are already in place, so the analysis counts no engineering cost for Levels 1 and 2.
| Level and assessment | Small entity | Other than small |
|---|---|---|
| Level 1 (Self), self-assessment and affirmation, a year | $5,977 | $4,042 |
| Level 2 (Self), first assessment | $34,277 | |
| Level 2 (Self), over three years (two annual affirmations of $1,459) | $37,196 | |
| Level 2 (C3PAO), certification assessment | $101,752 | $112,345 |
| Level 2 (C3PAO), over three years | $104,670 | $117,768 |
| of which the C3PAO engagement | 120 hours at $260.28 = $31,234 | 200 hours = $52,056 |
| Level 3 (DIBCAC), over three years, before engineering | $12,802 | $44,445 |
Level 3 is where the analysis does count engineering: $2,700,000 of nonrecurring and $490,000 a year of recurring engineering for a small entity, and $21,100,000 and $4,120,000 for an entity other than small. The DoD estimated that 8,350 medium and large entities would need Level 2 (C3PAO).
For a company that has not implemented the 110 requirements, the assessment is the small part of the bill. The estimates exclude the gap assessment, the SSP and the policies, the enclave or the network rebuild, new firewalls and VPNs with FIPS-validated cryptography, MFA tokens, logging and monitoring, physical access controls, training, and the internal time to run it all, plus the recurring cost of managed security and licenses. They also predate any quote a C3PAO would give you today. Use them as a floor for the assessment line and nothing more.
Marrowfield Precision Components, Inc. is the fictional machine shop of The CMMC Compliance Handbook: 85 employees and $6,400,000 a year of DoD subcontracts at an 18 percent gross margin, or $1,152,000. Its gap assessment scored -35, so it started far from the DoD's assumption. It kept CUI in an enclave of 18 users and budgeted the following, every amount invented for illustration:
| One-time line | Amount |
|---|---|
| Gap assessment by outside consultant | $18,500 |
| SSP, policies and procedures (consultant) | $24,000 |
| CUI enclave build and migration by the MSP (FedRAMP Moderate cloud tenant) | $38,000 |
| FIPS-validated firewall and VPN replacement | $16,800 |
| MFA tokens for all 85 users | $5,950 |
| Log collection and SIEM onboarding | $9,500 |
| Badge readers, visitor management and physical access logs | $21,400 |
| Endpoint hardening and application allow-listing | $12,600 |
| Training program setup | $3,200 |
| Mock assessment by outside consultant | $14,000 |
| Internal IT manager time (420 hours x $72) | $30,240 |
| Total one-time | $194,190 |
| Annual line | Amount |
|---|---|
| Enclave cloud licenses (18 users x $62 a month) | $13,392 |
| MSP managed security: monitoring, SIEM, patching ($4,100 a month) | $49,200 |
| Vulnerability scanning tool | $6,000 |
| Annual training and phishing exercises | $2,700 |
| Total a year | $71,292 |
The one-time cost is 3.0 percent of a year of DoD subcontract revenue. The annual cost is 1.1 percent of that revenue but 6.2 percent of the gross margin on it, or $3,960.67 per enclave user a year. Over three years the cost of ownership is $408,066, 11.8 percent of three years of gross margin on DoD work ($3,456,000). Measured against margin rather than revenue, compliance is a real line in the business case, which is why the scope decision matters so much.
The trap: budgeting the assessment and forgetting the run cost. In this case the recurring $71,292 a year outweighs the whole one-time budget within three years, and none of it appears in the DoD estimates for Level 2.
Putting all 85 users into the CUI environment would have changed three lines: migration of $96,000 instead of $38,000, licenses of $63,240 a year (85 users at $62 a month) instead of $13,392, and managed security of $82,800 a year ($6,900 a month) instead of $49,200.
| Scope | One-time | Annual | Three years |
|---|---|---|---|
| CUI enclave, 18 users | $194,190 | $71,292 | $408,066 |
| Enterprise-wide, 85 users | $252,190 | $154,740 | $716,410 |
| Difference | $58,000 | $83,448 | $308,344 |
The enclave saves $308,344 over three years. It is a scoping choice documented in the SSP, not a term of the rule, and it has limits: the shop-floor CNC machines are documented as Specialized Assets that receive CUI only through a controlled transfer workstation, and the business network still handles FCI, so it falls under the Level 1 requirements. How that environment should appear in SPRS next to the enclave's CMMC UID is not settled clearly by the rule text; get a written answer from your prime and your counsel.
The Budget tab of the free SPRS Score Calculator opens with Example Co., an illustrative company with $3,000,000 of annual DoD revenue and invented amounts. Option A, a CUI enclave of 10 users, costs $105,000 once (gap assessment $12,000, SSP and policies $15,000, remediation $30,000, MFA and FIPS-validated encryption $8,000, training setup $2,000, the CUI environment $25,000, and 200 hours x $65 = $13,000 of staff time) and $42,100 a year (licenses at $55 a user a month, $6,600; managed security at $2,500 a month, $30,000; tools $4,000; training $1,500). Over three years: $231,300.
Option B, enterprise-wide with 40 users, costs $140,000 once and $85,900 a year, $397,700 over three years: $35,000 more at the start, $43,800 more each year, $166,400 more in total. Option A is 3.5 percent of the DoD revenue once and 1.4 percent a year. Adding the DoD estimate for a Level 2 (C3PAO) small entity over three years brings Option A to $335,970.
As reported in November 2026, Phase 2, which would have made Level 2 (C3PAO) a condition of award for applicable contracts from November 10, 2026, has been suspended since July 2026 pending a DoD review. Trade press reported that the task force's recommendations included restarting Phase 2 for a narrower population of contracts, but no decision had been published. If it is reinstated, or a contract requires Level 2 (C3PAO), Marrowfield plans with the DoD small-entity estimate of $104,670 over three years as a placeholder, not a quote, which would bring its three-year total to $512,736. Its self-assessment record, evidence binder and closed POA&M are kept so that the same enclave can be presented to a C3PAO.
The Budget tab of the free SPRS Score Calculator compares the two scopes with your own figures. The CMMC Compliance Handbook works the whole business case, chapter 14, on the Marrowfield numbers.
The DoD estimates, in 2023 dollars, $101,752 for a C3PAO certification assessment at a small entity ($104,670 over three years) and $34,277 for a Level 2 self-assessment ($37,196 over three years). They are estimates, not prices, and exclude remediation.
No. The regulatory impact analysis assumes the NIST SP 800-171 requirements are already implemented and counts no engineering cost for Levels 1 and 2. In the worked case, remediation and setup cost $194,190 before any assessment fee.
Usually, when only some staff need CUI. In the worked case the enclave of 18 users saves $308,344 over three years against putting all 85 users in scope, but the rest of the network still handles FCI and stays under the Level 1 requirements.
In the worked case, 169 days from the gap assessment to Conditional status, then 106 more days to close the POA&M and reach Final status. A company starting further from the requirements, or one needing a C3PAO, should plan for longer.
Rules as read and figures verified on November 22, 2026.
This guide is one arc of The CMMC Compliance Handbook. The book follows one machine shop from a score posted without an assessment to a Final Level 2 (Self) status: the two CMMC rules and the phases, FCI and CUI, the contract clauses and the part 240 deviation, scoping and enclaves, cloud and MSPs, the 110 requirements family by family, the SPRS score, POA&Ms and Conditional status, self-assessment and C3PAO assessments, affirmations and False Claims Act exposure, and the budget.
Paperback PDF edition, $19.99 Book page and companion workbooks
Free download: SPRS Score Calculator (Excel).
Illustrative figures computed by the book model; Marrowfield Precision Components, Inc., Example Co. and every person, score, date and amount are fictional and invented. The DoD cost figures are estimates from the regulatory impact analysis of the final rule, in 2023 dollars, not prices. Rules described as read in November 2026; the suspension of Phase 2, the reported revisions of the DFARS class deviation and any move to NIST SP 800-171 Rev. 3 may change them. Education only, not legal advice, and no guide or spreadsheet makes a company compliant.