An unlocked workbook that turns airspace, tonnage and third-party unit costs into remaining life, a closure and post-closure estimate, a GASB 18 liability, a funding target with a level annual deposit, and the annual cost of each financial assurance mechanism.
A landfill closure obligation has three legitimate numbers: the regulatory estimate, the accounting liability and the funding target. This template computes all three from the same inputs, shows the annual deposit that reaches the target on the closure date, and prices a bond, a letter of credit, insurance and a guarantee side by side, with a Controls sheet that reads 0.
One unlocked Excel workbook, no macros. Free: enter your email address and the download opens at once.
Landfill_Closure_Cost_Model.xlsx (33 KB)
Unsubscribe in one click. How your address is used.
Built from The Landfill Financial Assurance Handbook, which works a fictional county landfill line by line: a $53.04 million regulatory estimate, a $19.80 million trust fund, a $18.192 million accounting liability, a $81.03 million funding target, the mechanisms that cover the $33.24 million gap, and an offer to buy the site.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: Landfill Financial Assurance: The Mechanisms and What They Cost, Landfill Airspace Calculation: Density, Remaining Life and Value, GASB 18 Landfill Closure and Post-Closure Liability: Formula and Worked Example.
Six unlocked sheets: README, Inputs (airspace, tonnage, density, acreage, unit costs, the annual care budget, rates, the existing fund, mechanism pricing and a guarantor's figures), Estimates (remaining life, the regulatory estimate, the remaining cost and the GASB 18 liability and expense), Funding (the target on the closure date, the level deposit and a fund simulation), Mechanisms (annual cost of a bond, letter of credit, insurance and guarantee, and the local government financial test) and Controls.
No. It is a simplified model for education and first-pass analysis. A regulatory cost estimate needs an engineer, the accounting liability needs your auditor's agreement, and a funding policy needs a model built on your site's actual plans, reviewed by your financial advisor.