Free Excel Templates

Interconnection Cost & Timeline Model (Excel)

An unlocked FERC Order No. 2023 Excel workbook modeling cluster study timelines, Commercial Readiness Deposits, surety bond vs. cash carry costs, DFAX upgrade allocations, withdrawal penalties, and 25-year project IRR impact.

One neighbor withdrawal or a twelve-month cluster slip can flip a bankable renewable project into a negative-NPV breach. This standalone template separates blue project inputs from black live formulas, computes Proportional Impact (DFAX) and per-capita substation shares automatically, compares cash, LC, and Order No. 2023-A surety bond carry costs, and calculates your exact Kill-Switch Network Upgrade ceiling.

Get the Excel template

One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.

Interconnection_Cost_and_Timeline_Model.xlsx (19 KB)

Unsubscribe in one click. How your address is used.

The handbook behind this template

Built directly from The Interconnection Queue Handbook, covering FERC Order No. 2023 cluster windows, DFAX cost allocation, restudy cascades, ATT mitigation, surety bonds, Order No. 2003 reimbursement vs. RTO participant funding, IRC Section 48E QIP, and LGIA execution.

Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook

Related guides: how interconnection queues work, network upgrade cost allocation, and interconnection study timelines.

Questions practitioners ask

What does the Interconnection Cost and Timeline Model include?

Six unlocked tabs: Project Inputs with a 3-scenario selector and Order 2003 reimbursement toggle, a DFAX and per-capita cluster allocation calculator, automated FERC Order No. 2023 deposit/carry-cost/withdrawal penalty schedules, a live 25-year IRR and Kill-Switch engine, and a dynamic Controls tab.

Are there any macros or locked cells?

No. Every tab is unlocked, macro-free, and separates blue user inputs from black live formulas with Controls = 0.