An unlocked, circularity-free Excel model for underwriting a single-tenant build-to-suit project: land and hard costs, fees and contingencies, equity-first construction financing, Yield on Cost, net lease exit price, developer margin, IRR, and cost/cap-rate sensitivities.
Most back-of-the-envelope development spreadsheets miscalculate capitalized construction interest or forget selling costs when estimating Yield on Cost and developer IRR. This standalone Excel template models equity-first monthly S-curve draws, verifies the federal 15 percent HVCRE contributed-capital test, solves for exact break-even exit cap rate, and stress-tests cost overruns and cap-rate shifts live.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Build_to_Suit_Development_Model.xlsx (20 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Build-to-Suit Development Handbook, covering tenant requirements, site selection, ASC 842-40-55, AIA A102 GMP contracts, completion guarantees, lease commencement penalties, non-HVCRE construction loans, permanent takeouts, and net lease buyer returns.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: how build-to-suit development works, build-to-suit Yield on Cost, and build-to-suit lease commencement risk.
Six unlocked tabs: README (instructions and conventions), Inputs_Assumptions with a live 3-case Scenario Selector (Base, +10% Hard Cost, +50 bps Exit Cap), Sources_Uses_YoC with Yield on Cost and HVCRE 15% test, a 22-month equity-first Monthly_CashFlow and IRR engine, a Sensitivities exit cap rate table, and a dynamic Controls tab.
No. Monthly construction interest accrues on beginning-of-month loan balances to stay 100 percent circularity-free, zero macros are used, and Controls = 0.