Driveways, commercial mill and overlay, patching, commercial maintenance and residential sealcoating: tons, prices and every cost line, contribution per crew-day, crews and overhead, a P&L with adjusted EBITDA and SDE, break-even and stress tests, cash month by month and two offers for the company.
The file follows Fairlow Paving & Sealcoating, a fictional company with one paving crew and one sealcoat crew in a northern metro area. It bills $3,719,031, places 12,320 tons of asphalt and earns adjusted EBITDA of $471,125 (12.7%), and breaks even after 88 of its 120 paving days. Every figure in the book comes from the full model; this simplified version keeps the same logic and the same results.
One Excel file, no macros, nothing locked. Free: enter your email address and the download opens at once, along with the other free models.
Asphalt_Paving_Company_Model_Fairlow.xlsx (17 KB)
You join the reader list: one email when a new free model or a new book comes out, and a few notes on using the models. Leave in one click. Already on the list? Enter the same address. How your address is used.
This file is the worked case of The Asphalt Paving Company Owner. The book explains every assumption and every tab: how a takeoff becomes tons and a bid, why the crew-day is the resource that runs out first, what the trucks and the milling really cost, why cash keeps falling into the season, and how two buyers would value the company.
DRM-free PDF, $19.99 → · Paperback, $32.99, shipped worldwide
Seven tabs. Blue cells are inputs; every other cell is a formula.
Run a wet season. Set the production days factor to 0.85: revenue falls, the crews and the overhead do not, and adjusted EBITDA drops to $209,889.
Raise the asphalt price. Set the asphalt factor to 1.12 with prices unchanged: $115,315 comes straight off EBITDA.
Change the mix of days. Move paving days from commercial overlays to driveways and watch contribution per crew-day pull EBITDA down, even with the crew just as busy.
A commercial mill and overlay leaves $11,111 per crew-day, patching $9,200, a driveway $5,586, commercial maintenance $7,625 and residential sealcoating $1,028, after asphalt, trucks, milling, materials, fuel, repairs and marketing, before crew wages and overhead.
No macros and no circular reference. It recalculates in Excel, LibreOffice or Google Sheets.
Yes: replace every blue input, starting with your crews, production days, typical jobs and prices. Fairlow and every figure in it are fictional case assumptions, not market data.