Companion files · Supply Chain Management
Service levels, safety stock and what a supplier’s reliability is worth, on one part number from start to finish.
These are the companion files of Supply Chain Management by Julian R. Sterling.The book on Amazon →
The four workbooks that produced every figure in the book, rechecked from scratch. Around them: the same models with the inputs emptied, twelve working documents to print, forty questions that mark themselves, and three cases the book names and never takes to a number. No sign-up, no email address, nothing locked. One company, Aldermere Filtration, and one part number, AF-7; blue cells are the only inputs, everything else is a formula.
The book’s own files. Every figure in them was recomputed outside the workbooks in September 2026, and every one held; the files are unchanged. Two sentences of the book did not, and are corrected below.
Workbook 1 · Chapters 1 to 5
Demand during lead time for part AF-7, and where its variance comes from: 9.4845 per cent from the market, 90.5155 per cent from the supplier’s lead time. Also the 79 receipts it takes to know the lead-time standard deviation to plus or minus 0.3 weeks. Rechecked: 9 checks, all OK.
Download the workbook12 KBWorkbook 2 · Chapters 6 to 11
The service level table and the fill-rate solver: a cycle service level of 98 per cent is a fill rate of 99.3846 per cent. The three policies priced in euros, including the 18,490.12 EUR a year the board’s proposal costs, and how flat the cost curve is around its minimum. Rechecked: 88 checks, all OK. Chapter 11 says the batch and the service level should strictly be set together and that an appendix prices it; none did. Set together, the batch rises to 5,840.71 units and the year costs 683.37 EUR less (case two).
Download the workbook25 KBWorkbook 3 · Chapters 12 and 13
The lead-time table from 0.0 to 3.0 weeks, and what reliability is worth: 24,154.77 EUR a year for taking the standard deviation from 1.9 weeks to 0.5, 3.90 times the value of the dispute. The price per unit you can offer the supplier for it. Rechecked: 52 checks, all OK. The 0.2525 EUR is the simple division; with the premium also carried on every unit held, the exact break-even is 0.2512 (case three).
Download the workbook18 KBWorkbook 4 · Chapters 14 and 15
Four depots against one central warehouse, forecast bias from minus 10 to plus 10 per cent, and the holding rate from 8.0 to 25.0 per cent. Four depots tie up 91,485.19 EUR more stock and 8,401.59 EUR a year more orders; a 10 per cent under-forecast costs 8,952.25 EUR a year, a 10 per cent over-forecast earns 2,168.93. Rechecked: 54 checks, all OK.
Download the workbook18 KBTwelve workbooks (the four of the book, their blank twins, the three cases and the question book), the printable documents, the read-me and the start-here file. The four workbooks end on a Checks sheet that puts every printed figure beside the live formula: 203 checks, all OK. No macros, no external links. Each group below can also be downloaded on its own. Last revised 24 September 2026.
Reading the paperback or the Kindle edition? The same book is also sold as a DRM-free PDF: searchable, printable, yours on any device. $19.99, instant download.Buy the PDF edition → Free sample
Finished the book? Two or more PDF editions bought together are 15% off. Browse the PDF editions →
The working models behind the books, built out for live deals: the Pro models →
Optional. When a workbook on this page is corrected or a new worked case goes up, readers on the list get one email, plus a short note when a new book comes out. The downloads do not need it.
Join the reader listRun by MailerLite, off this site. How your address is used.
| Fill rate at a 98% cycle service level | 99.3846% |
| Share of the variance from lead time | 90.5155% |
| Lead-time reliability, 1.9 to 0.5 weeks | 24,154.77 EUR a year |
The four workbooks with every blue input emptied. The Checks sheets count what is still missing and test what holds for any inputs.
Chapters 1 to 15
The same formulas, every input empty: the thirteen quantities of the Assumptions sheet, the precision you want on the lead-time spread, the fill-rate target, the reliability target and horizon, the number of depots. An incomplete sheet stays empty rather than showing a wrong number. The sensitivity axes (service levels, lead-time spreads, biases, holding rates) stay: they are steps, not data.
The book’s inputs are listed in a text file inside the archive. Type them back in and its figures come back: 90.5155 per cent of the variance from the supplier, a fill rate of 99.3846 per cent, 24,154.77 EUR a year for a regular supplier, 91,485.19 EUR for four depots.
Download the blank set57 KBTwelve pages to print and use. A4, with margins wide enough for US Letter.
Chapters 1 to 15 · Appendices A to C
The agreed list of nine quantities, with source and owner. The holding rate built from its four components, with its sensitivity row. Lead time measured from goods receipts. The variance split. The service level translation table, the one document that ends the argument. The total cost test for any stocking proposal. The optimum on one line. The supplier regularity case on one page, and the regularity clause as a term sheet. The network test. The bias control. The Monday plan with the assumptions register.
Download the PDF30 KBA workbook that marks itself. Answer in the yellow cells; the marking fills in as you go.
All parts of the book
Seven on demand, lead time and the variance split, seven on the batch and the readings of service, seven on the money, seven on the supplier lever, six on depots and bias, and six on the three cases below. Numbers are marked to a tolerance, multiple choice to the letter, and the score sheet counts your errors part by part: that is your revision list.
Nothing is hidden. The marking sheet holds every answer, every tolerance, and the reason for each answer.
Download the question book17 KBNew material, not a restatement. Three situations the chapters name and never take to a number. Each case is one workbook: the note is the first sheet, the model is the rest, and a checks sheet closes it. Type your own figures in and every finding recomputes.
Chapter 14 · Case one
Chapter 14 counts the depots’ extra stock and orders, never their annual cost, and never the shortages the extra buffer prevents: Chapter 15’s own lesson. Counted as the chapter counts, 20,660.60 EUR a year; with the shortage leg, 15,838.27. At the same fill rate as the warehouse the depots need a cycle service level of 96.70 per cent and only 109.00 more units of safety stock, not 1,006.53: 65,815.76 EUR of extra inventory, not 91,485.19, and 17,220.90 EUR a year. With the supplier at 0.5 weeks, four depots cost 318.44 EUR a year less than one warehouse today.
Chapter 11 · Case two
The refinement Chapter 11 names and does not perform. Set jointly, the batch is 5,840.71 units, 33.2 per cent above the economic order quantity, the cycle service level 98.7622 per cent, and the year costs 683.37 EUR less: inside the flat floor, as the chapter says, but the field that moves is the batch. With both states re-optimised, the supplier lever is worth 22,269.56 EUR a year, 3.59 times the dispute instead of 3.90.
Chapter 13 · Case three
The premium also sits in every unit held and comes off every unit lost: the exact break-even is 0.2512 EUR, and at 0.2525 Aldermere is 116.49 EUR a year worse off. The row premiums the chapter describes and does not print: 0.0783 at 1.5 weeks, 0.1715 at 1.0. A flat premium at half the break-even (ADDED) loses 12,109.39 EUR a year if the supplier does not move; a schedule on the spread achieved never loses. Paid up front, the three-year ceiling is 62,929.32 EUR, not 72,464.30.
Download the three cases49 KB| Amounts | in euros; Aldermere Filtration, part AF-7 and every figure attached to them are fictional |
| Time | weeks throughout, 52 to the year; demand and lead time in the same grain |
| Service level | the cycle service level unless the fill rate is named; the batch is the economic order quantity unless stated |
| Blue cells | the inputs in the book’s workbooks; amber cells in the cases; every other number is a formula |
| ADDED | a figure the book does not give, used in the cases and marked wherever it appears |
| 24 Sep 2026 | Every figure in the four workbooks recomputed independently: all hold, the files are unchanged, 203 checks all OK. Corrected in the book: Chapter 13’s “exactly as well off” at 0.2525 EUR a unit (116.49 EUR a year short; the exact break-even is 0.2512); Chapter 11’s pointer to an appendix that was to price the joint setting of batch and service level (now priced: 683.37 EUR a year). Added: a blank set, twelve working documents, forty questions that mark themselves, and three cases. |
More in business and operations, with free companion files. The full list of titles is on the author page.
Supply Chain Management develops the complete framework behind these models, with the assumptions, trade-offs and worked examples tied together.
View the book on Amazon Read the related analysisAlso as an ebook on Apple Books · Google Play ยท DRM-free PDF edition ($19.99).
If this book helped — or didn’t — a few lines on Amazon are worth more than they look: they are what the next reader goes on. Write a review. The workbook stays free either way.
Also available as a standalone free template: safety stock calculator.