Screening Buildings, Underwriting Costs and Rents, Residual Land Value, Code and Floor-Plate Tests, Tax Abatements and Historic Credits, and the Capital Stack of Turning Empty Offices into Apartments
Most empty office buildings cannot become apartments, and most of those that can only work at the right price. This handbook gives developers, investors, lenders, analysts and city officials the full method: the physical screen, the test fit, the rent roll, the budget, the schedule and its financing costs, the residual land value, the correct valuation of a tax abatement, historic tax credits, the capital stack, the refinance and the exit.
Every figure is worked on one fictional 14-story 1968 office tower, the Corliss Building, converted to 273 apartments: total development cost of $86,260,560, a residual land value of $12,818,536 against an asking price of $16,000,000, a permanent loan of $53,340,953 sized on unabated income, and a common equity return of 17.5 percent with public support against 4.2 percent without it.
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Introduction: The Building Is Empty, the Question Is Price
1. Why Most Office Buildings Cannot Become Apartments
2. The Physical Screen: Depth, Light, Height and Grid
3. Scoring Three Candidates in Lakeport
4. Code, Zoning and the Change of Occupancy, in Principle
5. The Test Fit: From Gross Area to Apartments
6. Rents, the Affordable Set-Aside and Stabilized NOI
7. The Budget: What Conversion Work Really Costs
8. Timeline, Draws and the Cost of Carry
9. Residual Land Value: What the Empty Building Is Worth
10. Tax Abatements and What They Are Really Worth
11. Historic Tax Credits in a Conversion
12. Affordable Housing Tools: Housing Credits and Bonds, in Principle
13. The Capital Stack: Senior, Mezzanine, Preferred and Common
14. The Refinance: Sizing the Permanent Loan
15. The Hold, the Exit and the Returns
16. Stress Testing the Conversion
17. Construction Risk: Surveys, Hazardous Materials, Facades and Contracts
18. Lease-Up, Operations and the Ground Floor
19. Working With the City
20. Underwriting Residential Demand Downtown
21. Alternatives to a Full Conversion
22. The Investment Committee Memo
23. Energy, Carbon and Building Performance
24. From the Lender's Chair: Underwriting a Conversion Loan
25. Ten Mistakes in Conversion Models
Conclusion: The Price Is the Plan
Appendix A: Glossary
Appendix B: Feasibility and Due Diligence Checklist
Appendix C: The Worked Formulas
Appendix D: Guide to the Companion Workbooks
Free companion files
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.
Complete case model
Corliss Building Conversion Case Workbook
Every figure in the book from one Inputs tab: scorecard, unit mix, NOI with and without the abatement, budget, 90-month schedule, refinance tests, sale, returns and residual land value.
Residential developers, equity investors, construction and permanent lenders, mezzanine and preferred equity providers, analysts, and city officials who evaluate requests for public support of office conversions.
Does the book cover tax abatements and historic tax credits?
Yes. It shows how to value a time-limited abatement as unabated value plus the present value of the remaining benefit, less the remaining cost of its affordable condition, and how the 20 percent federal rehabilitation credit funds a conversion and sets its hold period through the five-year recapture rule.
Are the Excel workbooks free?
Yes. The full case workbook and the standalone feasibility template are free on this page, unlocked, without macros, with a Controls tab that reads zero.