Liquefaction Trains and Tolling Models, Long-Term Sale and Purchase Agreements, EPC Contracts and Construction Risk, Export Permits, Debt Sizing and Completion Support, and the Return Math of Developers, Lenders and Offtakers
Financing a greenfield U.S. LNG export terminal demands nearly $10 billion of committed capital, four years of cryogenic construction, and four separate federal regulatory regimes before loading its first cargo. This handbook shows project finance bankers, developers, infrastructure equity investors, and commercial structurers how to build, size, negotiate, and stress-test a bankable non-recourse LNG export financing from pre-filing to first commercial cargo.
Every calculation is worked on one fictional 10.00 MTPA U.S. Gulf Coast terminal, Calcasieu Point LNG Export, LLC: 8.50 MTPA (85.0 percent) contracted under 20-year FOB SPAs and an LTA generating $922.44 million of contracted CFADS, sizing $6,873.80 million of multi-source senior debt (70.3 percent of $9,783.02 million Total Uses) at 1.40x contracted DSCR, delivering 1.79x base DSCR and a 14.23 percent pre-tax equity IRR (7.11 percent contracted floor), saving $31.38 million/year via Year-3 refinancing, and surviving +12-month delays, +$600 million CapEx overruns, and 70 percent merchant margin compression.
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Appendix D: Companion Excel Workbooks and Lead Magnet Template Guide
Free companion files
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circularity, and a Controls tab that reads 0.
Complete case model
Calcasieu Point LNG Case Workbook
8 tabs reproducing every capacity, CFADS, S-curve IDC, DSCR debt-sizing, Year-3 refi, 24-year equity IRR (25 years under the delay stress), and offtaker netback table in the book.
Editable 6-tab Excel model with a live 4-case Scenario Selector (Base, +12M Delay, +$600M Overrun, Merchant Stress), deterministic debt sizing, and live IRR engine.
Project finance bankers, energy infrastructure private equity professionals, LNG developers, Export Credit Agency credit officers, institutional bond analysts, and commercial offtake structurers.
Which U.S. regulatory, tax, and accounting rules are covered?
Natural Gas Act Section 3 (15 U.S.C. 717b), FERC 18 CFR Part 153 and Part 380 (NEPA), DOE 10 CFR Part 590 (including 2025-2026 non-FTA updates), PHMSA 49 CFR Part 193, USCG 33 CFR Part 127, Equator Principles IV, MACRS Asset Class 49.25, IRC Sections 263A(f) and 163(j) (post-OBBBA 2025 EBITDA & 100% bonus depreciation), and FASB ASC 842 / ASC 606, all as read in November 2026.
Are the Excel workbooks included free?
Yes. Both Calcasieu_Point_LNG_Case_Workbook.xlsx and the standalone LNG_Export_Project_Model_Template.xlsx are free on this page, unlocked, macro-free, and zero-circularity.