U.S. LNG export terminals finance multi-billion-dollar liquefaction trains using two core commercial contracts: 20-year Free on Board (FOB) Sale and Purchase Agreements priced at 115 percent of Henry Hub plus a fixed liquefaction fee, and Liquefaction Tolling Agreements (LTAs). Understanding how both contracts allocate feedgas risk, cargo cancellation economics, and ASC 842 lease accounting is essential for developers, lenders, and offtakers.

Worked in full in The LNG Export Project Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

The 115 Percent Henry Hub FOB SPA Formula Explained

Under a standard U.S. Gulf Coast FOB Sale and Purchase Agreement (SPA), the project SPV buys domestic pipeline gas, liquefies it, and transfers title at the ship's flange. The buyer pays two distinct components:

FOB SPA Price = (1.15 x Henry Hub) + Fixed Liquefaction Fee

At Calcasieu Point LNG in The LNG Export Project Finance Handbook, Kansai Thermal Power (3.50 MTPA, A-) and RheinGas Trading (2.50 MTPA, A-) contract 6.00 MTPA (312.00 million MMBtu/year) at 115.0 percent of Henry Hub ($4.025/MMBtu at $3.50 HH) plus a $2.80/MMBtu fixed liquefaction fee, yielding a $6.825/MMBtu FOB Gulf Coast price. Why 115 percent? The extra 15 percent reimburses the terminal for 9.0 percent plant fuel and shrinkage (109.0 percent actual gas intake = $3.815/MMBtu) plus $0.14/MMBtu of firm pipeline transportation ($3.955/MMBtu total cost), leaving a modest $0.070/MMBtu ($21.84 million/year) retainage margin that lenders conservatively exclude from debt sizing.

FOB SPA vs. Liquefaction Tolling Agreement (LTA)

Calcasieu Point LNG blends 6.00 MTPA of FOB SPAs with 2.50 MTPA (130.00 million MMBtu/year) contracted to Pacific Rim Gas Supply (BBB+) under a 20-year Liquefaction Tolling Agreement (LTA) at a fixed tolling fee of $2.68/MMBtu ($348.40 million/year):

Commercial FeatureFOB SPA (6.00 MTPA)LTA Tolling (2.50 MTPA)
Feedgas ProcurementSPV purchases & transports gasOfftaker delivers 109% gas to gate
Fixed Take-or-Pay Fee$2.80/MMBtu ($873.60M/yr)$2.68/MMBtu ($348.40M/yr)
Working Capital / Gas LCsRequired by SPV ($250M-$350M)Zero feedgas working capital for SPV
ASC 842 Lease RiskService / commodity sale (ASC 606)Must avoid dedicated train to stay off-balance-sheet

Offtaker Delivered Cost Stacks & Cargo Cancellation Breakevens

Because the $2.80/MMBtu fixed liquefaction fee is unconditionally sunk (take-or-pay) whether the buyer lifts a cargo or cancels it 60 days ahead, an offtaker cancels a cargo strictly when destination prices fall below avoidable marginal cash cost (115% Henry Hub + shipping + regasification), NOT full delivered cost:

Even if European TTF crashes to $7.00/MMBtu, lifting the cargo recovers $1.375/MMBtu toward the sunk $2.80 fee, keeping U.S. terminals running while protecting senior lenders. Read how LNG export project finance works, study LNG project debt sizing and completion risk, and download the free LNG Export Project Model (Excel).

Questions practitioners ask

Why do U.S. LNG SPAs charge 115 percent of Henry Hub?

The 15 percent premium above Henry Hub covers roughly 8 to 10 percent natural gas consumed as liquefaction plant fuel and shrinkage plus firm interstate pipeline transportation and basis costs from Henry Hub to the coastal terminal gate.

What happens to lender cash flow if an LNG buyer cancels a cargo?

Under a bankable U.S. FOB SPA, a buyer canceling a cargo 45 to 60 days ahead avoids paying the 115 percent Henry Hub feedgas component, but must still pay 100 percent of the fixed liquefaction fee ($2.80/MMBtu), leaving lender CFADS completely intact.

How do LNG tolling agreements avoid balance-sheet lease capitalization under ASC 842?

Structurers contract terminal-wide commingled capacity rather than a dedicated physical train and preserve operator discretion over train dispatch and maintenance scheduling so the LTA fails the ASC 842 'identified asset' and 'right to control' tests.

Read the full handbook

This guide is drawn from The LNG Export Project Finance Handbook, following Calcasieu Point LNG Export, LLC from pre-filing through Financial Close, debt sizing, and downside stress testing.

Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks