Courses · Data centers

Data Center Development & Finance: from power to stabilised value

A complete course on how a data center campus is developed and financed, built around one 60 MW campus in three phases: grid power and delivery dates, cost per MW, leases, the power recharge, the construction loan and the refinancing, returns and stress.

$199, with the Data Center Development Model, Pro Edition ($99 on its own)

Eight modules in a 31-page Course Book, an Excel workbook that checks your answers, a 162-question quiz app with a timed final exam and a certificate, and the full quarterly Pro model of the case. Download right after payment.

Get the course, $199 →

Secure checkout by Stripe. Not sure yet? Try module 3 and ten quiz questions free below, or start with the free data center financial model.

A data center is a power and cooling installation with a roof on it, and it is underwritten that way: in megawatts, from the grid connection up. This course teaches the steps in order, on one campus, with every number computed and every exercise checked: when each phase can start paying rent, what it costs per MW, what it earns, who pays for the electricity, how the loans are sized, what it is worth, and what breaks it.

What you will be able to do

The program

Each module has objectives, the lesson, a worked example step by step, the classic mistakes, a summary, three practice questions, one exercise tab, about twenty quiz questions and its own sheet in the Pro model.

Try it free

A full module. Module 3, on development cost per MW and phasing, as it appears in the Course Book: download the free sample (PDF, 4 pages).

Ten quiz questions. Click an answer: it turns green or red and the explanation appears. The questions use the running case:

Harlow Ridge Data Campus (fictional): 60 MW of IT load in three phases of 20 MW, turnkey. Design peak PUE 1.30, annual PUE 1.25, billed at 1.35. Cost before contingency $11.45m per MW, contingency 5%. Rent $110.00 per kW-month, +3% a year. Construction loan 60% loan to cost plus a 6% interest reserve. Cap rate 6.75%.

Module 1

1. Harlow Ridge has 60 MW of IT load and a design peak PUE of 1.30. How much capacity must the utility deliver?

Answer: 78.0 MW. 60 x 1.30 = 78.0 MW. The grid serves the whole facility at its peak, not the IT load alone, and the annual PUE (1.25) is for energy, not sizing.

Module 1

2. Rent is $110.00 per kW-month. What does 1 MW earn in a year?

Answer: $1.32m. $110.00 x 1,000 kW x 12 months = $1.32m.

Module 2

3. Phase 3 is ready in Q15 and tranche 2 arrives in Q13. When does phase 3 start paying rent?

Answer: Q15. The later of the building being ready and power being available.

Module 3

4. With 5% contingency, what is the development budget for 60 MW?

Answer: $721.35m. $12.0225m x 60 = $721.35m.

Module 3

5. What is total development cost?

Answer: $765.10m. $721.35m + $38.99m + $4.76m.

Module 4

6. In Q1 2032, rent per kW-month is $127.52. What is the quarter's rent at full lease?

Answer: $22.954m. 60 x 1,000 x $127.52 x 3.

Module 5

7. What is the power margin in the first stabilized year?

Answer: $3.31m. Billed less bought, over four quarters.

Module 6

8. What is the stabilized loan?

Answer: $712.9m. The smallest of the three limits: loan to value binds.

Module 7

9. What is the yield on cost (forward NOI at the refinancing / total cost)?

Answer: 11.44%. Stabilized NOI / total development cost.

Module 8

10. Why run correlated risks together rather than add single results?

Answer: Only the full run shows the extra equity, the later refinancing and the spread when they hit at once. On this campus the IRR is close to additive; the timing of cash and the refinancing are not.

Inside the course

Exercise Workbook, module 3: given cost lines in blue, answers in yellow and automatic Correct checks
The Exercise Workbook: one tab per module, your answers in yellow, an automatic check, a hidden solution built with live formulas.
Quiz App: a module 5 question on the power margin with the explanation after the answer
The Quiz App: 162 questions with explanations, a timed final exam of 40 questions and a case, and a printable certificate from 70%. It runs offline.
Dashboard of the Data Center Development Model, Pro Edition for the running case
The Data Center Development Model, Pro Edition, included: the whole campus quarter by quarter, one sheet per module, 36 checks.

What you receive

FileWhat it is
Course_Book.pdfEight modules, 31 pages: lesson, worked example, pitfalls, summary, practice questions, glossary and dated sources.
Exercise_Workbook.xlsxEight exercise tabs, 54 answers checked automatically, eight hidden solution tabs.
Quiz_App.html162 questions, practice by module with explanations, timed final exam, score by module, certificate.
Data_Center_Development_Model_ProThe quarterly Pro model with the worked example, a blank copy and an 18-page user guide.
Start_Here.pdfThe order to use it all in, on one page.

The running case

Harlow Ridge Data Campus is a fictional 60 MW turnkey campus in a secondary US market, built in three phases from 2027. Phase 1 is pre-leased to a hyperscale tenant; phases 2 and 3 lease as they deliver. The course follows it from the grid connection to its sale:

MeasureValue
Utility capacity / grid tranches78.0 MW / 60 MW + 20 MW
Total development cost / per MW$765.1m / $12.75m
Stabilized NOI / yield on cost$87.5m / 11.44%
Development spread / value per MW469 bps / $21.60m
Peak construction loan / refinancing cash-out$432.9m / $272.8m
Equity IRR / multiple25.32% / 3.93x
Stress: equity IRR / extra equity12.73% / $69.3m

Questions people ask

Who is the course for?

Infrastructure and real estate analysts, construction and infrastructure lenders, and development and investment teams who are new to data centers. You should be comfortable with a real estate or project model in Excel; the course teaches the power-first logic that makes data centers different.

Is there a data center modeling course elsewhere?

Not a complete one that we know of: the large modeling schools cover buyouts, real estate and project finance, and treat data centers in a webinar or a single case. This course takes one campus through all eight steps, with an Excel model that runs quarter by quarter.

How long does it take?

Most learners need five to eight hours: thirty minutes to an hour per module for the reading, the exercise tab and the practice quiz, then the final exam.

Is there video?

Not yet. This first edition is a written course with a live Excel workbook and a quiz app. Short video walkthroughs will be added later and sent free to every buyer.

What do I get exactly?

One zip file: the Course Book (PDF), the Exercise Workbook (Excel), the Quiz App (a single HTML file that runs offline in any browser), the Data Center Development Model, Pro Edition with a blank copy and its user guide, and a one-page Start Here guide.

Are the market figures current?

They are dated assumptions of the case, each with its source at the back of the Course Book (Cushman & Wakefield 2026 cost guide, CBRE, Uptime Institute, IEA, Berkeley Lab, SOFR). Markets move fast in this sector: the course teaches you how to replace them with your own.

Which software do I need?

A PDF reader, Excel (LibreOffice and Google Sheets also work) and a web browser. No macros, no add-ins, no account to create.

Is the certificate a professional qualification?

No. The Quiz App prints a certificate of completion when you score 70% or more on the final exam. It shows the work you did; it is not a license or an accredited qualification.

Can I get a refund?

It is a digital download delivered immediately, so the right of withdrawal ends at delivery, as the checkout explains. If a file is faulty, write to [email protected] and it will be fixed or refunded. Details in the terms of sale.

Is it investment advice?

No. The campus, the developer, the tenants and every deal are fictional. The course teaches the analysis and the modeling; it does not recommend any investment. It was prepared with AI assistance and every figure is computed and checked by script.

Data Center Development & Finance: $199

The course, the exercises, the quiz and the Data Center Development Model, Pro Edition. Download right after payment.

Get the course, $199 →

Only need the model? The Data Center Development Model, Pro Edition is $99 on its own.

Related