A quarterly development model for a data center campus in up to three phases: grid tranches and rent commencement, cost per MW and S-curves, pre-leasing and lease-up, rent per kW-month, PUE and the power recharge, a construction loan with equity first and an interest reserve, the refinancing, the sale, and three scenarios side by side, with 36 built-in checks.
Data Center Development & Finance includes this model, plus a 31-page Course Book, an Excel workbook that checks your answers and a 162-question quiz with a final exam. Each module of the course has its own sheet in the model.
Enter the grid tranches, the cost per MW, the three phases, the leasing, the rent and energy terms, the loans and the exit. The workbook finds the quarter each phase can start paying rent, spends the budget along S-curves, leases the campus, bills the power, draws and repays the construction loan without a circular reference, sizes the refinancing on three tests, and returns yield on cost, development spread, value created, IRR and multiple, for Base, Downside and Stress at once.
One zip file: the model with a worked example, a blank copy and an 18-page PDF user guide. Single-user license.
Secure checkout by Stripe. Want to learn the whole analysis? Data Center Development & Finance, the course, includes this model ($199). The free data center financial model stays free.

Blue text on a pale yellow fill marks an input; every other cell is a formula.

Harlow Ridge Data Campus, a fictional 60 MW turnkey campus in three phases from 2027. Amounts in $ millions:
| Measure | Value |
|---|---|
| Rent commencement, phases 1 to 3 | Q3 2028, Q3 2029, Q3 2030 |
| Budget / total development cost | 721.4 / 765.1 |
| Cost per MW / value per MW | 12.75 / 21.60 |
| Stabilized NOI / yield on cost / spread | 87.5 / 11.44% / 469 bps |
| Peak construction loan / stabilized loan | 432.9 / 712.9 |
| Equity IRR / unlevered IRR / multiple | 25.32% / 17.55% / 3.93x |
| Stress: equity IRR / extra equity | 12.73% / 69.3 |
| Powered shell on the same site: yield on cost | 11.27% |

No. Interest is charged on opening balances, the loan commitment is sized on the approved budget with an explicit interest reserve, and spending is funded in a fixed order, so the workbook calculates in one pass.
The free model compares turnkey, powered shell and powered land on a 180 MW site and runs one monthly cash flow. The Pro edition models three phases tied to grid tranches, leasing by phase, the power recharge, a real construction loan and refinancing, three scenarios side by side and 36 checks. The free model stays free.
Yes. It uses standard functions only and was recalculated and verified cell by cell in LibreOffice. Charts may look slightly different outside Excel.
Tax and depreciation, demand charges and on-site generation, rent-free periods, and more than three phases or two grid tranches. The guide lists every simplification.
Yes: Data Center Development & Finance ($199) teaches the whole analysis on the same campus and includes this model.
Yes, the blank copy is built for that. The license is single-user, the example campus is fictional and nothing in the model is investment advice.