The loss on a default is time without rent plus the cost of getting the aircraft back and re-placed. The rent cut on re-lease is only part of it.
A narrowbody with 72 months left on a $210,000-a-month lease, repossessed after a default and re-leased after 12 months at $185,000, costs the lessor $5.86m in present value at 8%, 19.5% of its $30.0m value. Each extra month of downtime between 6 and 18 costs about $0.204m.
| Item | Value |
|---|---|
| Aircraft | Narrowbody appraised at $30.0m, 72 months left on a lease at $210,000 a month |
| Default | The airline stops paying at month 0 and the lessor repossesses |
| Recovery costs | Legal and export costs of $0.90m at month 0, then $45,000 a month of storage, insurance and maintenance until re-delivery |
| Re-lease | A new 72-month-horizon lease at $185,000 a month starts after the downtime, after $1.40m of transition and catch-up maintenance |
| Security deposit | $0.42m, two months of rent, kept by the lessor |
| Discount rate | 8.0% a year, 0.6434% a month |
The comparison is over the 72 months left on the original lease. A performing lease is worth 0.210 × 57.480 = $12.07m in present value, where 57.480 is the sum of 72 monthly discount factors.
Recovery costs: $0.90m at month 0 plus 45,000 × 11.513 = $0.52m of carrying cost
Transition: 1.40 × 0.9259 = $1.30m at month 12
New rent for months 13 to 72: 0.185 × 45.968 = $8.50m
Net = 8.50 + 0.42 deposit − 0.90 − 0.52 − 1.30 = $6.21m
Excel, monthly rate in B2, downtime in B3: =0.185*(PV(B2,72-B3,-1)/(1+B2)^B3) for the new rent, with PV in months
Loss = performing lease − default path = 12.07 − 6.21 = $5.86m, 19.5% of the aircraft value and 48.6% of the lease
Each month of extra downtime between 6 and 18 months costs about $0.204m
| Downtime, months | New rent $210,000 | New rent $185,000 | New rent $160,000 |
|---|---|---|---|
| 6 | 3.32 | 4.61 | 5.90 |
| 9 | 4.02 | 5.24 | 6.46 |
| 12 | 4.71 | 5.86 | 7.01 |
| 18 | 6.05 | 7.06 | 8.08 |
| 24 | 7.33 | 8.22 | 9.10 |
At $185,000 a month the loss rises from $4.61m at 6 months to $8.22m at 24 months. A $25,000 cut in the new rent, from $185,000 to $160,000, costs $1.15m at 12 months; six more months of downtime, from 6 to 12, cost $1.25m. The two are of similar size.
| Case | 6 months | 12 months | 18 months |
|---|---|---|---|
| Base costs | 4.61 | 5.86 | 7.06 |
| Recovery, carrying and transition costs 50% higher | 5.87 | 7.22 | 8.52 |
| Recovery, carrying and transition costs doubled | 7.12 | 8.58 | 9.97 |
Doubling every cost adds about $2.71m at 12 months, more than the $2.36m added by stretching the downtime from 12 to 24 months, so the cost assumptions deserve as much scrutiny as the schedule. The model has no tax, no maintenance reserves held, no end-of-lease value and no lessee funding of the repossession.
In this case $5.86m in present value: the rent not received, $0.90m of recovery costs, $0.52m of carrying costs and $1.30m of transition, less the $0.42m deposit.
About $0.204m a month between 6 and 18 months, from $4.61m at 6 months to $7.06m at 18 months at a $185,000 new rent.
They are close. Six more months of downtime, from 6 to 12, cost $1.25m, and a $25,000 cut in the new monthly rent costs $1.15m at 12 months.
The free companion files for The Aircraft Leasing Professional rebuild a fictional lessor’s sale-and-leaseback and its IRRs, a lease return and transition, an airline default, an aircraft ABS and the lessor’s annual results. The figures in this article use invented inputs and are not in them. No account and no email address.
Not on Amazon: 24 paperbacks by Julian R. Sterling on insurance and retirement, printed on demand and shipped worldwide. Browse the bookshop →
Reading guide: credit, private credit and distressed debt → · All 1908 articles →