How to Calculate a Machine Shop Hourly Rate: Full Cost and Covenant Math

Build shop rates from actual billed spindle hours, not available capacity: $109.08 full cost vs $114.12 covenant rate in a worked CNC shop.

A CNC machine shop hourly rate must recover every dollar of machine running costs, scheduled two-shift payroll, fixed overhead, depreciation, and debt service over actual billed spindle hours, not available hours. In the worked case, full cost per billed hour rose to $109.08 in 2025, while meeting the bank's 1.25x DSCR covenant required a $114.12 blended rate against $112.22 charged.

Worked in full in The Machine Shop Owner by Julian R. Sterling, with five live Excel workbooks included.Get the DRM-free PDF, $19.99 →

Free Excel tool: plug your own machines, hours, payroll, and debt into the Machine Shop Rate Calculator to see full cost per billed hour, break-even hours a day, and your covenant-required rate.

1. The Denominator Rule: Billed Hours, Not Available Hours

An independent CNC job shop sells machine hours to customers' drawings. Before setting a single dollar rate, count three separate hour buckets: available hours (machines times shifts times working days), hours run (every hour a spindle turns, including quote overruns and remaking scrap), and billed hours (the quoted hours customers actually pay for).

Every cost of running the shop must be divided by billed hours, because unbilled overrun hours and scrap rework hours generate zero revenue while consuming tooling, coolant, power, and payroll. In The Machine Shop Owner, Halvercote Precision (a fictional 12-machine shop on two 8-hour shifts over 250 working days) had 46,976 available hours in 2025, ran its spindles for 34,527 hours (including 3,727 unbilled hours from 8% overruns and 4.1% scrap), and billed only 30,800 hours (65.6% utilization).

Notice one critical classification rule: payroll is a scheduled fixed cost, not a variable cost. Thirteen machinists ($32.00/hr plus 1.5x overtime under the Fair Labor Standards Act, 29 U.S.C. 207), two programmers, two inspectors, one shipping clerk, four salaried managers, and 20% employer taxes and benefits cost $1,997,264 in 2025 whether every spindle turns or sits idle.

2. Worked Example 1: Full Cost per Billed Hour vs. Machine Group Rates

In 2025, Halvercote billed 30,800 hours across three machine groups: 15,400 hours on six three-axis vertical mills at $109.00/hr ($1,678,600), 10,900 hours on four CNC lathes at $102.00/hr ($1,111,800), and 4,500 hours on two five-axis machining centers at $148.00/hr ($666,000). Total machining revenue was $3,456,400, a blended rate of $112.22 per billed hour. Adding $1,163,292 of billed material (15% markup over $1,011,558 cost) and $257,488 of billed outside processing (10% markup over $234,080 cost) brought total revenue to $4,877,180.

Excluding pass-through material and outside processing, what did each billed hour cost the shop in 2025? Machine running costs ($7.60 tooling + $2.60 coolant/consumables + $3.40 spindle power = $13.60 per hour run) totaled $469,564 across 34,527 hours run, or $15.25 per billed hour. Adding freight out ($43,895), total payroll ($1,997,264), other fixed costs ($516,170 including $194,670 rent, $66,000 maintenance, $54,000 insurance, $38,000 software, and $30,000 quality/AS9100 calibration), and straight-line depreciation ($332,857) gives a full cost of $3,359,750, or $109.08 per billed hour (up from $100.75 in 2024).

Halvercote Precision Full Cost per Billed Hour (fictional case, 2024 vs 2025).
Cost Component (Excl. Material & Outside Proc.)2024 ($ / Hr)2025 Total ($)2025 ($ / Hr)
Machine running costs (tooling, coolant, power on hours run)$13.30$469,564$15.25
Freight out (0.9% of total revenue)$1.35$43,895$1.43
Total shop and office payroll (with 20% burden)$61.94$1,997,264$64.85
Other fixed costs (rent, maintenance, software, quality)$15.41$516,170$16.76
Book depreciation (straight-line, 7-year lives)$8.75$332,857$10.81
Full Cost per Billed Hour (30,700 / 30,800 hrs)$100.75$3,359,750$109.08
Blended Machining Rate Charged$107.40$3,456,400$112.22
Blended Rate Needed for 1.25x DSCR Covenant$104.08$3,514,790$114.12

Even though the $112.22 blended rate cleared full accounting cost ($109.08) by $3.14 an hour, the shop still failed its bank covenant. Why? Because full cost includes book depreciation ($332,857), not principal repayments on equipment loans and SBA debt ($247,258 principal plus $177,993 interest = $425,252 total debt service) or owner tax distributions ($90,000).

Check your own shop's rate gap in five minutes

Enter your machine groups, billed hours, payroll, and loan payments in the free Excel calculator, or study the full 2024-2028 model in The Machine Shop Owner.

Free Machine Shop Rate Calculator Explore the Book & 5 Workbooks

3. Worked Example 2: Solving for the Covenant Rate and Repricing Plan

Under Halvercote's loan agreement, the year-end Debt Service Coverage Ratio is defined as (EBITDA - Owner Distributions) / Debt Service, with a minimum covenant of 1.25x. In 2025, EBITDA fell from $637,564 to $563,175 while debt service rose from $356,391 to $425,252 after financing a second five-axis machine ($560,000 loan at 8.4%). Actual DSCR dropped to ($563,175 - $90,000) / $425,252 = 1.11x, triggering a default and a $7,500 bank waiver fee.

To solve directly for the minimum blended hourly rate that clears the bank covenant, work backward from required EBITDA:

Required EBITDA for 1.25x DSCR = $90,000 distributions + (1.25 × $425,252 debt service) = $621,565

2025 EBITDA Shortfall = $621,565 required - $563,175 actual = $58,390

Hourly Rate Gap = $58,390 ÷ 30,800 billed hours = $1.90 per billed hour

Covenant-Required Blended Rate = $112.22 charged + $1.90 gap = $114.12 per billed hour

Equivalently, in volume terms, Halvercote's contribution per billed hour was $99.89 ($3,076,609 / 30,800 hours). Breaking even on EBITDA required $2,513,434 / $99.89 / 250 days = 100.6 billed hours per working day, while meeting the 1.25x covenant required 125.5 billed hours a day against 123.2 actually billed (2.3 hours a day short).

In December 2025, the owner compared three 2026 plans: an aerospace push (Option A, adding a sales engineer and CMM loan), a robotic lathe cell (Option B, adding a $420,000 automation loan), and repricing the shop from cost (Option C). Option C raised 2026 group rates to $116.00 on vertical mills, $108.00 on lathes, and $154.00 on five-axis centers, restored material markup to 18%, and cut overruns from 8% to 6% and scrap from 4.1% to 3.2%. Even after deliberately walking away from low-margin vertical mill work (dropping total billed hours to 30,338), Option C was the only plan that cleared the bank covenant in 2026:

2026 Strategic Options Compared (Halvercote Precision, fictional projections).
2026 PlanBilled Hours2026 Revenue2026 EBITDA2026 DSCRYear-End Cash
Option A: Aerospace push (new loan + hire)32,163$5,310,174$563,3830.95x$9,262
Option B: Robotic cell on lathes ($420k loan)32,908$5,311,653$657,9171.10x$67,204
Option C: Reprice by group + fix quotes30,338$5,081,030$665,0191.26x$304,934

Notice the lesson for any job shop owner: billing 462 fewer hours at the right hourly rates generated $101,844 more EBITDA than 2025 ($665,019 vs $563,175) and lifted year-end cash from $141,622 to $304,934 without taking on a single dollar of new debt.

The trap: Pricing a five-axis machining center near your blended shop rate to win first-article aerospace work, or dividing overhead by 46,976 available hours instead of 30,800 billed hours. Dividing $3,359,750 by available hours produces a phantom cost of $71.52 an hour; quoting off that number guarantees cash losses on every spindle hour you win.

4. Frequently Asked Questions

How do you calculate the hourly rate for a CNC machine shop?

Divide all shop costs excluding pass-through material and outside processing (machine running costs, freight, total payroll, fixed overhead, and depreciation) by actual billed spindle hours, not available hours. Then add the margin required to cover owner distributions, debt service, and your bank's DSCR covenant.

Why should machinist payroll be treated as a fixed cost in a shop rate?

A two-shift CNC job shop pays its machinists, programmers, and inspectors whether every spindle turns or sits idle. Treating payroll as a scheduled period cost ($1,997,264 or $64.85 per billed hour in the worked case) forces every billed hour to carry its share of idle time, overruns, and scrap.

Should a CNC shop charge one blended hourly rate across all machines?

No. A $600,000 five-axis machining center carries far higher depreciation, loan payments, tooling, and programming overhead than a three-axis vertical mill or CNC lathe. In the worked case, 2025 rates are set by machine group: $109.00 on vertical mills, $102.00 on lathes, and $148.00 on five-axis centers ($112.22 blended).

How much does a $1.90 per hour rate gap affect a machine shop's bank covenant?

Across 30,800 billed hours, a $1.90 per hour shortfall removes $58,390 of EBITDA. In the worked case, charging $112.22 blended instead of the $114.12 required rate pushed DSCR down to 1.11x against a 1.25x loan covenant, triggering a year-end default and a $7,500 bank waiver fee.

5. Sources and Methodology

  1. U.S. Small Business Administration, SOP 50 10 8.1: Lender and Development Company Loan Programs (SBA 7(a) debt service coverage underwriting and commercial loan standards).
  2. Fair Labor Standards Act, 29 U.S.C. Section 207(a)(1) (federal overtime compensation at not less than 1.5 times the regular rate for hours worked beyond 40 in a workweek).
  3. Internal Revenue Code, 26 U.S.C. Sections 168(k) and 179 (federal equipment depreciation and expensing rules; book depreciation in the case uses 7-year straight-line).

Run every number of your CNC job shop with five live workbooks

The Machine Shop Owner covers the monthly machine-hour engine, shop rates by group, quoting and hit rates, scrap and overruns, two-shift payroll, machine financing, AS9100 and CMMC, receivables, and bank covenants.

Buy DRM-Free PDF ($19.99) Paperback ($32.99) Google Play Book Page & Free Workbooks