Book · Julian R. Sterling
Engineered Standards, Units per Hour, Labor Planning, Productivity Pay, and Cost per Order for Distribution Center Leaders
Google Play Paperback, $32.99 PDF edition, $19.99
Unengineered historical UPH averages bake past waste into your budget, punish associates who draw tough order profiles, and leave distribution centers trapped in chronic overtime. This handbook shows warehouse and finance leaders how to build discrete engineered standards, separate Direct Performance from Labor Utilization, staff shifts from Earned Standard Hours, design FLSA-compliant productivity incentives, and meet state warehouse quota and OSHA ergonomic standards.
Every calculation is worked on one fictional U.S. hardgoods distributor, Crestline Home & Hardware Distribution, Inc. (220,000 sq ft, 600,000 orders, 7,200,000 units): lifting Direct Performance from 77.1 percent to 100.0 percent, Utilization from 81.4 percent to 85.9 percent, and Blended Facility UPH from 38.9 to 53.3, cutting overtime from 25,000 to 5,000 hours and All-In Labor Cost per Order from $10.07 to $7.97 ($1,259,400/yr net savings, 2.7-month payback, $2,851,941 3-year NPV at 10.0 percent).
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, and a Controls tab that reads 0.
Complete case model
8 tabs reproducing every calculation in the book.
Download Warehouse_Labor_Standards_Workbook.xlsx24 KBStandalone practitioner tool
Size daily shifts, overtime exposure, blended UPH, and Cost per Order for your own DC.
Download Warehouse_Labor_Planning_Calculator.xlsx16 KBWant the standalone tool first? Open the free Warehouse Labor Planning Calculator page.
Distribution center directors, warehouse operations managers, industrial engineers, labor analysts, HR partners, and operations controllers.
FLSA overtime and nondiscretionary bonuses (29 U.S.C. Section 207; 29 CFR Sections 778.209, 778.210, 785.18, and 785.19), OSHA Section 5(a)(1), NIOSH Lifting Equation, 29 CFR 1910.178 powered industrial trucks, and state warehouse quota laws (CA AB 701, NY WWPA, WA RCW 49.84, MN Section 182.6526, OR HB 4127), as read in November 2026.
Yes. Both Warehouse_Labor_Standards_Workbook.xlsx and the standalone Warehouse_Labor_Planning_Calculator.xlsx are free on this page with zero macros.