Book · Julian R. Sterling

The Utility-Scale Solar Project Finance Handbook

Site Control and Interconnection, PPAs and Merchant Tails, Energy Yield and Degradation, EPC and Module Supply, Tax Credits and Tax Equity, Back-Leverage, and the Return Math of Developers, Sponsors and Lenders

Buying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.

About the book

Cover of The Utility-Scale Solar Project Finance Handbook

Utility-scale solar looks simple from the highway, yet converting sunlight into a bankable infrastructure asset requires mastering site control and mineral waivers, FERC Order 2023 and ERCOT interconnection, NERC IBR reliability standards, Virtual PPA nodal basis risk, P50/P90 energy yield, UFLPA and FEOC/PFE module compliance, Section 48E/45Y tax equity flips under OBBBA, and dual-DSCR sculpted back-leverage debt.

Every calculation is worked on one fictional 150 MWac / 195 MWdc West Texas solar plant, Mesquite Mesa Solar, LLC ($224.25 million CapEx, 427,050 MWh Year 1 P50 yield, $50.00/MWh VPPA less $3.00/MWh basis haircut, 40.0 percent Section 48E ITC = $82.00 million, $94.30 million tax equity flip, $100.94 million sculpted back-leverage debt at 6.50 percent, and $29.01 million sponsor equity), lifting a 4.00 percent unlevered yield to a 14.11 percent sponsor pre-tax IRR (7.18x MOIC) while maintaining a 1.30x P50 and 1.12x 1-Year P90 minimum DSCR.

Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.

PDF edition, $19.99, DRM-free, delivered at once by email.

Paperback, $32.99 PDF edition, $19.99

What is inside

Free companion files

Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.

Download all files (ZIP)63 KB

Start with 00_START_HERE.md.

Want the standalone template first? Open the free Utility-Scale Solar Project Model (Excel) page.

Worked articles from the book

Questions practitioners ask

Who is this handbook written for?

Solar project developers, infrastructure PE sponsors, project finance lenders, tax equity structurers, corporate PPA buyers, and independent engineers underwriting utility-scale solar deals.

Does it cover 2026 OBBBA tax credits, FERC Order 2023, and NERC IBR rules?

Yes. Every chapter reflects Public Law 119-21 (OBBBA July 4, 2026 BoC / Dec 31, 2027 PIS rules including the June 6, 2026 vacatur of IRS Notice 2025-42 in Oregon Environmental Council v. IRS, IRS Notice 2026-15 FEOC/PFE MACR, permanent 100 percent IRC Section 168(k) bonus depreciation), FERC Order 2023 (upheld July 2026), NERC Category 2 / PRC-028-1 / PRC-029-2, and UFLPA / AD-CVD module trade compliance.

Are the Excel workbooks included free?

Yes. Both Utility_Scale_Solar_Case_Workbook.xlsx and the standalone Utility_Scale_Solar_Project_Model.xlsx are free on this page, unlocked, macro-free, and verified with Controls = 0.

Also by Julian R. Sterling