An unlocked FERC transmission formula rate workbook covering Rate Base, book and MACRS depreciation, ADIT, 100% CWIP vs. AFUDC, capital structure, Base ROE and incentive adders, O&M, ATRR, and HoldCo return sensitivities.
Underwriting a high-voltage electric transmission line starts with an auditable FERC formula rate engine. This standalone Excel template separates blue project inputs from black live formulas, computes Year 1 Rate Base, Pre-Tax ROR, and ATRR, compares 100 percent CWIP against traditional AFUDC, and tests ROE and HoldCo double-leverage sensitivities with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Transmission_Revenue_Requirement_Template.xlsx (17 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Electric Transmission Investment Handbook, covering FERC formula rates, 18 CFR Part 101 accounts, IRS ADIT proration, Order No. 679 CWIP and ROE adders, Order No. 1000 cost caps, Order No. 1920 planning, HoldCo double leverage, and Rate Base M&A valuation.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: how FERC transmission formula rates work, transmission ROE and incentive adders, and transmission revenue requirement calculation.
Six unlocked tabs: README, Inputs, ATRR_Engine (Rate Base, 1/8 CWC, Pre-Tax ROR, FFO/Debt), CWIP_AFUDC_Model (CWIP vs. AFUDC and Year 1 rate shock), Sensitivities (ROE, 50/50 to 60/40 equity ratio, and HoldCo double leverage), and Controls.
No. Every tab is unlocked, macro-free, and separates blue user inputs from black live formulas with Controls = 0.