An unlocked institutional workbook for container and bulk terminal concessions: 25-year bid NPV, fixed rent vs. variable royalty and MVG penalties, MRA & Handback reserves, DSCR/LLCR/PLCR debt sizing, PAB/TIFIA/PIDP uplift, and Year 5 termination payouts.
Before submitting a binding port concession tender or underwriting non-recourse terminal debt, test whether your bid NPV survives a trade downturn, MVG shortfall penalties, Year 12 crane overhauls, and 1.35x DSCR lender floors. This standalone Excel model runs every calculation dynamically with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Port_Concession_Bid_and_Project_Finance_Model.xlsx (26 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Port Concession Handbook, covering World Bank Landlord governance, OSRA 2022, EU Directive 2014/23/EU, demand forecasting, crane CapEx, MVG bidding, dry bulk Take-or-Pay, DSCR/LLCR debt sizing, PAB/TIFIA stacks, IFRIC 12, and lender step-in rights.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: port concession project finance debt sizing, container terminal concession fees and MVG bidding, and dry bulk Take-or-Pay concessions and IFRIC 12.
Six unlocked tabs: README, Assumptions (with a 3-scenario selector for Base, Downside Stress, and Public-Private Stack), Bid_and_Operating_Model (25-year TEU, tariff, OpEx, MVG, bid NPV, IFRIC 12 amortization, and MRA/Handback reserves), Debt_and_Termination (18-year debt, DSCR, LLCR, PLCR, DSRA, Levered IRR, and Year 5 termination payouts), Sensitivity_Matrix, and Controls = 0.
No. Every tab is unlocked, macro-free, separates blue user inputs from black formulas, and verifies Controls = 0.