Deconstructing $304,204,543 bid NPV (7.0 percent discount rate), fixed vs. variable royalties, and $1,485,691 MVG trade-shock stress.
Most equity value in port concessions is destroyed during the six-month competitive tender when bidders overpay for fixed land rent or accept punitive Minimum Volume Guarantees. Here is the exact PAMA bid NPV and MVG stress math.
Worked in full in The Port Concession Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
In The Port Concession Handbook, the Port Aurelia Maritime Authority (PAMA) awards Berths 4 and 5 under a Two-Envelope tender where technically qualified bidders compete on the highest Net Present Value (NPV) of combined concession fees discounted at the Authority's 7.0 percent public discount rate. Look at Aurelia Container Terminal Holdings, LLC's winning $304,204,543 bid architecture:
| Concession Fee Component | Rate & Escalation (2.0 percent/yr) | Nominal 25-Yr Total | NPV at 7.0 percent |
|---|---|---|---|
| Upfront Signature Fee (Year 0) | Paid at Financial Close | $25,000,000 | $25,000,000 |
| Fixed Land Lease Rent | $14.00/m2 on 450,000 m2 ($6,300,000 Yr 1) | $201,790,888 | $87,912,682 |
| Variable Throughput Royalty | $14.00/TEU Yr 1 (700,000 TEU MVG from Yr 3) | $458,114,994 | $191,291,862 |
| Total PAMA Concession Package | Combined Landlord Waterfall | $684,905,882 | $304,204,543 |
Because the Authority discounts future fees at 7.0 percent while equity sponsors earn 22.07 percent, shifting bid value from upfront signature fees into variable per-TEU royalties preserves sponsor IRR and cushions cyclical volume dips. However, a rigid Minimum Volume Guarantee (MVG) turns a variable royalty into a fixed liability the moment trade slows:
See how this bid feeds into port concession project finance debt sizing (DSCR, LLCR, and PAB/TIFIA stacks), review dry bulk Take-or-Pay concessions, laytime/demurrage, and IFRIC 12 accounting, and run your own bid NPV sensitivity in the free Port Concession Bid and Project Finance Model (Excel).
When the port authority's bid evaluation discount rate (7.0 percent on Port Aurelia) sits well below the sponsor's cost of equity (22.07 percent IRR), back-loading concession fees into variable per-TEU royalties rather than massive Year 0 upfront payments preserves equity IRR and lowers fixed downturn risk.
Lenders typically require a 2-year ramp-up grace period before MVG activation and a floor calibrated at 65 to 75 percent of stabilized throughput (700,000 TEUs vs. 960,000 TEUs stabilized on Port Aurelia), paired with force majeure and channel-depth suspension clauses.
Extrapolating 1990s trade-to-GDP multipliers beyond mature 1.0x to 1.3x rates, ignoring practical 85 to 90 percent yard capacity ceilings, treating footloose transshipment cargo as sticky O&D gateway volume, and omitting Year 12 crane overhaul and Year 25 handback reserves.
This guide is drawn from The Port Concession Handbook, following container and dry bulk terminal concessions from Landlord governance and RFP bidding through marine engineering, project finance debt sizing, PAB/TIFIA stacks, IFRIC 12 accounting, and handback.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Port Concession Bid and Project Finance Model (Excel).