An unlocked, 6-tab U.S. Public-Private Partnership pursuit budgeting and Go/No-Go decision workbook covering Phase 1 to Phase 5 bid costs, 23 CFR 636.113 stipends, Gate 1 and Gate 2 Expected Value, break-even win probabilities, IP retention testing, and a two-way sensitivity matrix.
Before committing $10.60 million in pre-award cash to a U.S. P3 procurement where stipends cover less than 25 percent of spend, test the exact Expected Value and break-even win probability at Gate 1 (Pre-RFQ) and Gate 2 (Post-Shortlist) with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
P3_Bid_Cost_and_Go_No_Go_Model.xlsx (17 KB)
Unsubscribe in one click. How your address is used.
Built directly from The P3 Bid Handbook, covering consortium formation, SOQ shortlisting, Project Agreement risk allocation, ATC engineering, PABs and TIFIA capital stacks, Best-Value scoring, Financial Close rate sharing, and bid protests.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: U.S. P3 procurement process, Alternative Technical Concepts (ATCs), and P3 stipends and bid costs.
Six unlocked tabs: README, Assumptions with an interactive 3-scenario selector (Base, Stress, Upside), Bid_Budget_Stipend (Phase 1 to Phase 5 cash burn, stipend coverage, consortium pro-rata loss), Go_No_Go_EV (Gate 1 & Gate 2 Expected Value, break-even win probabilities, Stipend vs. IP Retention rule), Sensitivity_Matrix (win probability vs. bid overrun), and dynamic Controls = 0.
No. Every tab is unlocked, macro-free, separates blue inputs from black live formulas, and verifies Controls = 0 natively in Excel and LibreOffice.