Site packages, utility installation, basements for builders and homeowner work: unit prices and every cost line, export loads and trucks, contribution per crew-day, crews and overhead, a P&L with adjusted EBITDA, SDE and equipment payments, break-even and stress tests, equipment cost per hour and two offers for the company.
The file follows Corbeck Excavating & Site Work, a fictional company with a site crew and a builder crew on the edge of a growing metro area. It bills $4,200,480, earns adjusted EBITDA of $677,712 (16.1%), pays $300,000 a year on its equipment and breaks even after 148 of its 200 site crew days. Every figure in the book comes from the full model; this simplified version keeps the same logic and the same results.
One Excel file, no macros, nothing locked. Free: enter your email address and the download opens at once, along with the other free models.
Excavation_Company_Model_Corbeck.xlsx (17 KB)
You join the reader list: one email when a new free model or a new book comes out, and a few notes on using the models. Leave in one click. Already on the list? Enter the same address. How your address is used.
This file is the worked case of The Excavation Contractor Business Owner. The book explains every assumption and every tab: how a takeoff becomes bank, loose and compacted yards and a bid, why the crew-day is the resource that runs out first, what the trucks and the fleet really cost, why cash falls into June, and how two buyers would value the company.
DRM-free PDF, $19.99 → · Paperback, $32.99, shipped worldwide
Eight tabs. Blue cells are inputs; every other cell is a formula.
Run a wet year. Set the production days factor to 0.88: revenue falls, the crews and the overhead do not, and adjusted EBITDA drops to $366,919, only $66,919 after equipment payments.
Change the swell. Raise the swell on the Inputs tab and watch the loads, the hired trucks and the export cost of every site package rise with it.
Park the excavator. Cut its engine hours on the Equipment tab from 1,600 to 900: its ownership cost per hour rises from $27.38 to $48.68.
A site package leaves $10,090 per site crew-day and a sewer job $7,520; on the builder crew, a basement leaves $4,351 and a homeowner job $2,730, after materials, trucks, dump fees, fuel, repairs, rentals and marketing, before crew wages and overhead.
No macros and no circular reference. It recalculates in Excel, LibreOffice or Google Sheets.
Yes: replace every blue input, starting with your crews, production days, typical jobs and unit prices. Corbeck and every figure in it are fictional case assumptions, not market data.