A subsequent closing is never a clerical pro rata true-up. Every closing rewrites historical ownership ratios, triggers differentiated management fee catch-ups, pits cost-plus pricing against ASC 820 mark-ups, exposes legacy LPs to Section 707(c) tax traps, and tests the ERISA 25 percent plan-asset cliff.
Every calculation is worked on one fictional $400.00 million three-close fund, Crestview Partners IV, L.P.: $15.722 million Close 2 and $22.665 million Close 3 wires, $4.089 million and $3.128 million Cost-Plus vs. NAV-Based wealth transfers, +128 bps subscription-line IRR boost (22.85 percent vs. 21.57 percent), $523.7 thousand Section 707(c) tax drag, $1.886 million waterfall hurdle distortion, and 17.24 percent ERISA BPI compliance.
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Chapter 12: Preferred Return, Carry Waterfall, and IRR Distortions from Subsequent Closes
Chapter 13: Parallel Funds, Master-Feeder Rebalancing, and Cross-Vehicle Equalization
Chapter 14: ERISA 25% Benefit Plan Investor Testing, VCOC Timing, and Excuse Rights
Chapter 15: Regulatory Filings, KYC/AML Bottlenecks, and LP Default Remedies at Closing
Chapter 16: The Subsequent Close Execution Playbook: Checklists for CFOs, Fund Administrators, and LPs
Conclusion: Zero-Drift Closing Discipline from First Wire to Final Close
Appendix A: Glossary of Subsequent Close and Fund Administration Terms
Appendix B: Core Formulas and Worked Reconciliation Checks
Appendix C: Subsequent Close LPA Audit and Execution Checklist
Appendix D: Companion Excel Workbooks Guide
Appendix E: Complete Case Summary on One Page
Free companion files
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.
Complete case ledger
Crestview Partners IV Subsequent Close Workbook
8 tabs reproducing Close 2 and Close 3 principal catch-up, ACT/365 simple vs. compound interest, side-letter fee catch-up, Cost-Plus vs. NAV gap, ASC 946 partner capital accounts, sub-line cost, Section 707(c) tax drag, waterfall distortion, and ERISA 25% testing.
Enter your own fund commitments, call dates, interim distributions, fee tiers, portfolio fair values, and BPI totals to audit any live subsequent closing to Controls = 0.
Private fund CFOs and controllers, fund administrators, institutional LP investment operations teams, and fund legal and tax counsel managing or auditing multi-close private equity, private credit, real estate, and infrastructure funds.
Does the book reflect current U.S. GAAP, tax, ERISA, and SEC rules?
Yes. All frameworks are verified as of November 2026, including Delaware DRULPA, FASB ASC 946 and 820, IRC Sections 704(b), 704(c), 706(d), 707(c), 721, and 731, 29 CFR 2510.3-101 (ERISA 25% / VCOC), SEC Marketing Rule 206(4)-1 (Feb 2024 FAQ), Form D, and the ILPA Model LPA.
Are the Excel equalization models included free?
Yes. Both Crestview_Partners_IV_Subsequent_Close_Workbook.xlsx and the standalone Subsequent_Close_Equalization_Model.xlsx are free on this page, unlocked, macro-free, and reconciled to Controls = 0.