Book · Julian R. Sterling

The Pumped Storage Hydropower Handbook

Developing, Valuing, and Financing Long-Duration Energy Storage: Licensing, Revenue Stacking, Construction Risk, and Project Economics

Buying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.

About the book

Cover of The Pumped Storage Hydropower Handbook

Pumped storage hydropower anchors long-duration grid reliability, synchronous inertia, and black-start restoration across fifty-year asset lives. This handbook gives developers, utilities, infrastructure funds, lenders, and counsel one rigorous quantitative and regulatory playbook.

Every calculation is worked on two fictional cases: Granite Basin Pumped Storage Project, developed by Granite Basin Storage Holdings, LLC with a 25-year Capacity and Tolling Agreement with Cascadia Grid Resources, Inc. (400 MW / 10.0 hr, $1,300,000,000 all-in CAPEX reduced to $858,400,000 net post-ITC, $121,800,000 merchant EBITDA vs. $83,200,000 contracted tolling EBITDA, $600,880,000 DOE Title 17 debt at 1.86x DSCR and 15.6 percent pre-tax, post-ITC Equity IRR, $116.14/MWh 40-year LCOS vs. $132.59/MWh 10-hour LFP BESS, and 10.2 percent pre-tax IRR under a $125,000,000 tunneling shock) and Red Mesa Pit Pumped Storage (150 MW brownfield mine saving $130,875,000 all-in CAPEX).

Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.

PDF edition, $19.99, DRM-free, delivered at once by email.

Paperback, $32.99 PDF edition, $19.99

What is inside

Free companion files

Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.

Download all files (ZIP)40 KB

Start with 00_START_HERE.md.

Want the standalone screening model first? Open the free Pumped Storage Hydro Economics and Sizing Model (Excel) page.

Worked articles from the book

Questions practitioners ask

Who is this handbook written for?

Energy infrastructure developers, private equity sponsors, utility IRP planners, project finance lenders, engineers, and attorneys developing, valuing, or financing long-duration pumped storage hydropower.

Does it compare pumped storage LCOS against 10-hour lithium-ion batteries?

Yes. It runs a full 40-year head-to-head LCOS comparison at 7.00 percent WACC showing Granite Basin Pumped Storage Project at $116.14/MWh versus $132.59/MWh for an equal-capacity 10-hour LFP battery with Year 12, 24, and 36 pack replacements.

Are the Excel pumped storage financial models included free?

Yes. Both Granite_Basin_PSH_Case_Workbook.xlsx and the standalone Pumped_Storage_Hydro_Economics_and_Sizing_Model.xlsx are free on this page, unlocked, and macro-free with Controls = 0.

Also by Julian R. Sterling