Every finding in a Phase I report lands in one of a few boxes. The box decides whether a Phase II is recommended, whether the lender asks for a reserve, or whether the finding is filed and forgotten. Here is how the boxes work.

Worked in full in The Environmental Site Assessment Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

The REC definition in three parts

Publicly available summaries of ASTM E1527-21 describe a recognized environmental condition as one of three things: the presence of hazardous substances or petroleum products in, on or at the property due to a release to the environment; their likely presence due to a release or likely release; or their presence under conditions that pose a material threat of a future release.

The second part is where judgment lives. The 2021 revision defined "likely" so that it means neither "possible" nor "proved": in substance, something a reasonable observer would expect or believe based on logic, experience and the available evidence. A dry cleaner that operated for decades with on-site processing and floor drains is the textbook likely release.

The classification ladder

LabelMeaningUsual consequence
RECRelease, likely release or material threat, not addressed to regulatory satisfactionPhase II or a negotiated alternative
CRECPast release addressed to regulatory satisfaction, contamination left in place under controlsObtain the controls and confirm compliance
HRECPast release addressed or meeting unrestricted use, without controls; not a RECKeep the closure file
De minimisMinor condition, no threat, no enforcement expected; not a RECHousekeeping

Five tests for any classification

  1. Is the basis stated? Each REC should say which part of the definition applies and why.
  2. Is the closure current? An HREC based on an old closure letter should be checked against current unrestricted use criteria and vapor.
  3. Are the controls known and met? A CREC whose covenant or system is not being maintained is effectively a REC.
  4. Is de minimis really small? If the extent cannot be seen, it is not obviously minor.
  5. Are off-site conditions explained? Distance, groundwater direction, chemical and regulatory status should support each conclusion.

A worked example

In the fictional Larkspur Crossing case in The Environmental Site Assessment Handbook, a 1972 shopping center produced four findings: a REC for a former dry cleaner that operated from 1974 to 2009; a CREC for a former tire and lube pad closed in 2001 with a groundwater use covenant; an HREC for a heating oil tank removed in 1993; and a de minimis stain at a trash compactor. A leaking tank case across the road, 350 feet away, was explained as not a REC because it was cross-gradient and stable.

The REC led to a Phase II that found PCE in groundwater at 8.2 times the federal drinking water standard and in sub-slab soil gas at 28.9 times the screening level used in the case. The price fell by $1,400,000. The other three findings cost almost nothing, because they were labeled correctly.

Why PFAS changed the boxes

E1527-21 treats emerging contaminants such as PFAS as non-scope until they become CERCLA hazardous substances. EPA's designation of PFOA and PFOS took effect on July 8, 2024, and the D.C. Circuit upheld it on August 18, 2026, so those two substances are now within the scope of a Phase I. Other PFAS remain non-scope unless the user adds them.

To review a full report quickly, use the Phase I environmental site assessment checklist or download the free Phase I ESA Review Checklist and Contamination Calculator (Excel). To see how a REC becomes a number, read Phase II costs and their effect on price and the loan.

Questions practitioners ask

Is a CREC still a recognized environmental condition?

Yes. A controlled REC is a REC from a past release addressed to regulatory satisfaction with contamination left in place under controls. The question becomes whether the controls are being met.

Is an HREC a REC?

No. A historical REC has been addressed to regulatory satisfaction, or meets unrestricted use criteria, without controls. The reviewer should still check the old closure against current criteria.

What is a de minimis condition?

A minor condition that generally presents no threat to health or the environment and would not attract enforcement. It is not a REC.

Read the full handbook

This guide is drawn from The Environmental Site Assessment Handbook, which follows Larkspur Crossing from a Phase I and a Phase II to a priced finding, a financed closing, a closure letter and a planned sale.

Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks

Free download: Phase I ESA Review Checklist and Contamination Calculator (Excel).

Illustrative figures computed by the book model; Larkspur Crossing and its screening levels are fictional. Education only, not legal, engineering, environmental, or investment advice.