Turn Phase II results into three remediation scenarios, an expected cost, a price reduction, a lender reserve and a return comparison, with a worked example.
A Phase II tells you what is in the ground. It does not tell you what it will cost, or what it will do to the deal. Here is the method practitioners use, worked on one fictional shopping center with a former dry cleaner.
Worked in full in The Environmental Site Assessment Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
A single estimate hides the shape of the risk. Turn the Phase II's uncertainties into a low, a base and a high scenario, cost each one in blocks with explicit timing, and assign probabilities openly.
In the Larkspur Crossing case, every scenario includes a sub-slab depressurization system ($165,000), entry into the state voluntary program, a covenant, monitoring and system operation. The base scenario adds source soil removal ($385,000) and tenant disruption ($72,000); the high scenario adds groundwater treatment ($640,000 and $310,000).
| Scenario | Probability | Present value at 8.0 percent |
|---|---|---|
| Low | 30 percent | $417,824 |
| Base | 50 percent | $896,988 |
| High | 20 percent | $1,870,749 |
| Expected | $947,991 |
A buyer that takes on the risk at exactly its expected cost earns nothing for bearing the uncertainty. The case adds a risk margin equal to 50 percent of the distance between the high scenario and the expected value, $461,379. The price reduction, rounded, is $1,400,000, or 6.4 percent of the $21,750,000 asking price, for an adjusted price of $20,350,000.
The result is stable: doubling the probability of the high scenario from 20 to 40 percent moves the reduction only from $1,400,000 to $1,500,000, because the margin shrinks as the expected value rises.
The lender caps the loan at 65 percent of the adjusted price, deducts $40,500 of monitoring and system operation from underwritten NOI, and requires a reserve of $947,000. The loan falls from $14,130,000 to $13,220,000. Because the reserve and the extra diligence and insurance costs outweigh the net saving from the lower price, equity at closing rises by $553,000, to $8,611,400.
| Version of the deal | Levered IRR |
|---|---|
| Clean deal at asking price | 12.8 percent |
| Finding priced, base remediation | 13.4 percent |
| Finding priced, high remediation | 10.8 percent |
| High remediation, no closure letter at exit | 8.5 percent |
| Naive buyer who never looked | 10.4 percent |
Two lessons follow. A finding priced with a risk margin can beat a clean deal if the risk behaves as forecast. And the real tail is not remediation cost but the absence of a closure letter at exit.
Price takes the measured risk. A seller indemnity backed by an escrow can take third-party claims; pollution legal liability insurance can take the unknowns. In the case the seller indemnity is capped at $1,000,000 for 5 years with an escrow of $500,000, and the policy carries a $5,000,000 limit.
Run your own numbers in the free Phase I ESA Review Checklist and Contamination Calculator (Excel). Check the Phase I behind your Phase II with the Phase I environmental site assessment checklist, and the classification logic with what a recognized environmental condition means. The complete method is in The Environmental Site Assessment Handbook.
Build low, base and high remediation scenarios, discount each to present value, weight by probability to get the expected cost, then add a risk margin for uncertainty. Allocate the tail through escrow, indemnity and insurance.
It reduces the loan through a lower price or value, lower underwritten income, or both. Which effect binds depends on whether the LTV or the DSCR test is the limit.
Because lenders often require an environmental reserve funded at closing, which can outweigh the net saving from the price reduction after the smaller loan.
This guide is drawn from The Environmental Site Assessment Handbook, which follows Larkspur Crossing from a Phase I and a Phase II to a priced finding, a financed closing, a closure letter and a planned sale.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Phase I ESA Review Checklist and Contamination Calculator (Excel).
Illustrative figures computed by the book model; Larkspur Crossing and its screening levels are fictional. Education only, not legal, engineering, environmental, or investment advice.