Scope, access, quantities, remaining useful life and the edge of the table: the questions that decide whether a property condition report can carry your price and your loan.
A property condition report is only as useful as the questions you ask of it. Most readers copy two numbers, the immediate repairs and the reserve per unit, and move on. This checklist is for the reader who wants to know whether those two numbers deserve to be copied.
Worked in full in The Property Condition Assessment Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
The baseline standard in the United States is ASTM E2018. Its current edition, E2018-24, was published in January 2024, and ASTM described the revision as placing more emphasis on the user: each assessment is given objectives so that its scope can be tailored. The default objective is the continued current use of the property without rehabilitation or change of use. If your plan differs, or if the property raises a question the baseline cannot see, the engagement letter is where you say so.
A report built on the units the manager chose to show is not a report. Fannie Mae's Form 4099 asks for at least 10 percent of units on properties of 51 to 300 units, plus long-vacant and down units; Freddie Mac's Chapter 62 asks for at least 10 percent of residential units and at least half of vacant and down units. In the case worked in The Property Condition Assessment Handbook, the consultant entered 38 units of a 240-unit property, including every vacant and down unit, and two of the 3 down units held the evidence of supply piping failures that later became a $1,248,000 line in the negotiation.
Every cost should be a quantity times a unit cost. A line that reads "roof replacement" with a single total is an assertion; a line that reads 1,056 squares at $480 per square, $506,880, is a calculation you can check against the roof plan and a contractor's quote.
| Check | Why it matters |
|---|---|
| Quantities and unit costs shown | Without them you cannot challenge or update anything |
| Useful life table named | Different tables move the whole schedule |
| Assessed versus age-based remaining life | Remaining life is defined in E2018-24 as a subjective opinion |
| Rolling items for unit equipment | HVAC and water heaters are replaced every year, not all at once |
| Items just beyond the period | They are inside the next buyer's table |
In the book's case, the windows were past their expected life but still performing, so the observer gave them 14 years, beyond the 12-year table. Their $1,248,000 replacement does not appear in the reserve at all. Moving every remaining life two years earlier raises the inflated twelve-year total from $3,839,386 to $4,330,385, partly because the window program enters the last year. Ask for every major item due within a few years after the period, with its cost.
Rebuild the long-term table in your own workbook, line by line, and check that it reproduces the consultant's totals. The free Capital Reserve Schedule Model (Excel) does this with 25 component rows and a 20-question review checklist. Then carry the reserve into net cash flow and loan sizing, as explained in how to calculate replacement reserves, and separate the repairs that belong at closing from the replacements that belong in the reserve, as explained in immediate repairs versus capital reserves.
ASTM E2018, a standard guide for a baseline property condition assessment process. The current edition, E2018-24, was published in January 2024.
It depends on the lender. Fannie Mae's Form 4099 (June 2024) asks for at least 10 percent of units on properties of 51 to 300 units, plus long-vacant and down units; Freddie Mac's Chapter 62 asks for at least 10 percent of residential units and at least half of vacant and down units.
No. The public preview of E2018-24 defines it as a subjective opinion of the number of remaining years. Expected useful life minus age is only a starting point.
This guide is drawn from The Property Condition Assessment Handbook, which follows Larkspur Commons from the engagement letter to the reserve table, the loan, the price credit and the capital plan after closing.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Capital Reserve Schedule Model (Excel).
Illustrative figures computed by the book model; Larkspur Commons is fictional. Education only, not engineering, legal, tax, or investment advice.