The repair list is the part of a property condition report that turns into money at closing. Getting the categories right decides who pays, when, and whether the buyer's credit survives the seller's objections.
Worked in full in The Property Condition Assessment Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
The public preview of ASTM E2018-24 separates immediate costs, for deficiencies that require immediate action such as imminent life safety threats and recorded code violations; short-term costs, for deficiencies to be addressed on a priority basis; and long-term costs, the anticipated replacement of building systems over an evaluation period the user defines. Lenders attach the deadlines. Fannie Mae's Form 4099 (June 2024) describes critical repairs as typically addressed immediately or within 6 months, and deferred maintenance typically within 12 months. Freddie Mac's Chapter 62 requires critical repairs before it proceeds, priority repairs within 365 days of origination, and PR-90 repairs within 90 days.
| Category | Amount |
|---|---|
| Immediate repairs (stairs, alarms, trip hazards, accessibility, roof leak, dryer vents, pool gate) | $152,600 |
| Short-term repairs (drainage, trees, retaining wall, down units) | $129,500 |
| Repair escrow at 125 percent (fictional term sheet) | $352,625 |
| Known-material project: polybutylene repipe, funded at closing | $1,248,000 |
The repipe is not a repair and not a reserve item. It is a known material concern with a defined remedy, priced separately so that it does not inflate the reserve for the life of the loan. Polybutylene piping was the subject of a national class action, Cox v. Shell, whose settlement was approved in November 1995 according to class counsel.
In The Property Condition Assessment Handbook, the buyer's credit combines repairs and the repipe dollar for dollar with the present value, at 8 percent, of the long-term needs above the seller's own reserve over the report's period, $1,969,839. The total is $3,499,939, or 7.3 percent of the asking price, taking the bid to $44,500,061. Capitalizing the full reserve difference would have given $4,520,850, a number the seller's broker would rightly attack as treating a twelve-year need as permanent.
To build the long-term part yourself, start with how to calculate replacement reserves; to check the report before you rely on it, use the property condition assessment checklist. The free Capital Reserve Schedule Model (Excel) carries both the repair list and the reserve schedule.
Immediate repairs correct deficiencies that need action now, such as life safety hazards or active failures, and are usually completed or escrowed at closing. Replacement reserves fund the expected replacement of building components over the evaluation period.
Lenders set it. Many size it above the opinion of cost to cover overruns; the fictional term sheet in the book uses 125 percent of the immediate and short-term repairs.
Usually not. A known material problem with a defined remedy is better priced and funded as a separate capital project, so that it does not inflate the reserve for the whole loan term.
This guide is drawn from The Property Condition Assessment Handbook, which follows Larkspur Commons from the engagement letter to the reserve table, the loan, the price credit and the capital plan after closing.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Capital Reserve Schedule Model (Excel).
Illustrative figures computed by the book model; Larkspur Commons is fictional. Education only, not engineering, legal, tax, or investment advice.