A complete worked make-or-buy comparison across Make In-House, Domestic CM, Nearshore USMCA, and Offshore CM showing how overhead and bottlenecks reverse rankings.
A rigorous make-or-buy analysis compares five-year differential cash flows rather than comparing an ERP absorbed standard cost against a supplier invoice. Worked on one fictional U.S. manufacturer (60,000 hydraulic manifold blocks per year), stripping unavoidable plant overhead, adding Total Landed Cost, and testing constrained capacity completely reverses the naive outsourcing rankings.
Worked in full in The Make-or-Buy Decision Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
In The Make-or-Buy Decision Handbook, every formula, tariff layer, working capital balance, and capital-budgeting test is worked on one fictional U.S. industrial manufacturer, Kestrel Precision Controls, Inc., deciding how to source its flagship Series-400 Hydraulic Manifold Block at 60,000 units per year over a 5-year horizon (300,000 lifetime units, 10.0 percent pre-tax discount rate).
Kestrel's ERP system reports an absorbed standard cost of $74.00 per unit ($4,440,000 per year). Facing a $1,350,000 capital request to install a new three-machine 5-axis CNC cell, leadership compares four complete options: Make In-House, Domestic Contract Manufacturing (Redwood Precision Machining, LLC at $61.00/unit), Nearshore Contract Manufacturing in Mexico (Sierra Norte Precision S.A. de C.V. at $51.50/unit FCA, USMCA-qualified), and Offshore Contract Manufacturing (Pacific Rim Precision Ltd. at $44.00/unit FOB).
Comparing $74.00 ERP standard cost against a $61.00 domestic quote or a $44.00 offshore quote creates a massive optical illusion. Inside Kestrel's $74.00 standard cost sits $20.00 per unit ($1,200,000 per year) of unavoidable allocated plant overhead (building lease, property taxes, plant leadership, ERP) that remains inside the factory if production leaves. Stripping that $20.00 and adding $1.00/unit of internal Cost of Poor Quality (COPQ) yields a true relevant Make operating cost of $55.00 per unit ($3,300,000 per year).
Meanwhile, adding inbound freight, customs duties (27.5 percent offshore tariff applied to $44.00 FOB plus $0.80/unit apportioned tooling assist under 19 U.S.C. Section 1401a = $12.32/unit), supplier management, and expected COPQ lifts every external option sharply:
| Sourcing Option | Quoted / Book Rate | Relevant Operating / Unit | 5-Year Pre-Tax PV of Costs |
|---|---|---|---|
| Make In-House (Idle Cap.) | $74.00 absorbed | $55.00 ($3,300,000/yr) | $13,772,600 ($60.55 EAC) |
| Nearshore CM (USMCA) | $51.50 FCA | $58.40 ($3,504,000/yr) | $13,765,875 ($60.52 EAC) |
| Domestic CM | $61.00 invoice | $66.00 ($3,960,000/yr) | $15,397,135 ($67.70 EAC) |
| Offshore CM (FOB) | $44.00 FOB | $66.40 ($3,984,000/yr) | $15,833,210 ($69.61 EAC) |
Under idle capacity, Make In-House ($13,772,600) beats Domestic CM by $1,624,534 and crushes Offshore CM by $2,060,610, while tying USMCA-qualified Nearshore CM within $6,725 (0.05 percent). Because Make In-House scores 86.8 vs. 72.8 on Kestrel's 100-point Strategic Risk Scorecard and avoids the $3.31 million USMCA non-qualification cliff ($17,071,692 PV if origin fails), Make In-House wins clearly under idle capacity.
Now introduce a hard physical bottleneck: releasing Kestrel's 12,000 machine hours lets the plant launch its high-margin Series-900 Aerospace Servo Valve, earning $900,000 per year ($15.00/unit, or $75.00/machine hour) in net incremental contribution margin. Adding that opportunity cost raises Make's relevant cost to $70.00/unit and pushes Make's 5-year PV of costs to $17,184,308. Suddenly, Domestic CM beats Make by $1,787,174 and Nearshore CM beats Make by $3,418,433!
Two additional variations round out a real-world board deck. First, a 70/30 Hybrid Split (making 42,000 base-load units in-house on a $750,000 single-cell investment + buying 18,000 peak units from Domestic CM) cuts Year 0 outlay from $1,350,000 to $910,000 and delivers a 5-year PV of $14,642,695, protecting utilization in a 40,000-unit downturn. Second, if Kestrel were exiting a legacy Offshore CM contract and reshoring back in-house, liquidating 90-day offshore inventory ($898,800 down to $180,000) releases $718,800 in working capital, slashing net Year 0 outlay to $821,200 for a 14.4-month payback and $1,480,610 NPV.
To run this exact multi-year model on your own parts, download the free Make-or-Buy Decision Calculator, or dive deeper into relevant costs in make-or-buy decisions and contract manufacturing total landed cost comparison.
First strip unavoidable allocated plant overhead from your ERP standard cost to isolate variable plus avoidable fixed cash costs. Second, normalize external quotes to Total Landed Cost including freight, tariffs, customs tooling assists, management, and expected COPQ. Third, add any verified constrained-capacity opportunity cost to Make, include working capital as a Year 0 outflow and Year 5 release, and compare 5-year Present Value of Costs.
Buy beats Make under three conditions: when plant capacity is constrained by a higher-margin alternative product (opportunity cost), when volume sits below the capital-adjusted indifference volume (36,886 units vs. Domestic CM in the Kestrel case), or when required CapEx exceeds capital-rationing limits.
Because $20.00 of the $74.00 standard cost was unavoidable plant overhead that stayed behind, while the $44.00 FOB quote accumulated $3.60 ocean freight, $12.32 customs duties (27.5 percent including a $0.80 tooling assist), $3.00 offshore management, $3.48 COPQ/air-freight risk, and $898,800 of 90-day working capital.
This guide is drawn from The Make-or-Buy Decision Handbook, following Kestrel Precision Controls, Inc. across four sourcing options, constrained capacity, 70/30 hybrid peak shaving, and reshoring economics.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Make-or-Buy Decision Calculator (Excel).
Illustrative figures computed by the book model; Kestrel Precision Controls, Inc. is fictional. Education only, not legal, tax, customs, or external accounting advice.