The formula, a worked 100 MW electrolysis case at $4.94 per kg, the PPA and capacity factor grid, the cost net of the 45V credit and the pitfalls.
The levelized cost of hydrogen (LCOH) is the constant price per kg that, over the life of a plant, exactly pays back its capital, its operating costs and the return the discount rate demands. You compute it as the present value of lifetime costs divided by the present value of lifetime output. For Caliche Point Hydrogen, a fictional 100 MW PEM electrolysis plant on the Texas Gulf Coast, the answer is $4.94 per kg at an 8 percent discount rate: power $2.15, capital $2.02, and the rest in stacks, fixed costs and water. Net of the 45V credit, it falls to $2.79.
Worked in full in The Green Hydrogen Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
Write every year's costs in one column and every year's hydrogen output in another. Discount both columns to the same date at the same rate, then divide the first sum by the second. The result is a price per kg: if the plant sold every kg at that price, flat over its life, the project would have a net present value of exactly zero at the chosen rate. Discounting the output feels odd at first, since a kg produced in year 12 is still a kg. It is the revenue you are really discounting: output times a constant price, and the price is what you solve for.
Three choices decide the answer before a single input is typed. The discount rate: the case uses 8 percent. The date you discount to: here both costs and output are discounted to commercial operation (COD), January 1, 2029. And the life: the operating life of the model, in which the plant runs only in years when the hydrogen price covers its variable cost. Change any of the three and the same plant shows a different LCOH, which is why two published figures are rarely comparable.
Caliche Point Hydrogen costs $165,000,000 to build, or $1,650 per kW of electrolyzer input. The electrolyzer system itself is $62,000,000; balance of plant $30,000,000; compression and storage $22,000,000; substation and grid interconnection $18,000,000; engineering and construction management $14,000,000; owner's costs $8,000,000; and a construction contingency of $11,000,000.
The plant draws 100 MW at full load and runs at a 60 percent capacity factor, which gives 525,600 MWh of electricity a year. System consumption is 52.5 kWh per kg at the start of stack life, all-in including balance of plant: an efficiency of 63.4 percent against hydrogen's lower heating value of 33.3 kWh per kg. Consumption rises by 1.0 percent of that figure for each year of stack life, to 57.23 kWh per kg in year 10, so output slides from 10,011 tonnes in year 1 to 9,185 in year 10. Stacks are replaced at the end of years 10 and 20, for $25,000,000 each, and output returns to 10,011 tonnes.
Power comes from a blended wind and solar virtual PPA at $35.00 per MWh fixed for 15 years, plus $4.00 for transmission, ancillary charges and shaping: $39.00 per MWh delivered. After the PPA ends, delivered power is assumed at $48.00. Fixed O&M is $3,300,000 in year 1 and insurance and property tax $1,320,000, both escalating 2.5 percent a year. Water and consumables cost $0.05 per kg.
| Component | LCOH per kg | What drives it |
|---|---|---|
| Capital | $2.02 | Capital cost, discount rate, capacity factor |
| Stack replacements | $0.16 | Stack cost and stack life |
| Power | $2.15 | Delivered power price and kWh per kg |
| Fixed O&M, insurance and property tax | $0.56 | Share of capital cost, escalation |
| Water and consumables | $0.05 | Water use and treatment |
| Total | $4.94 |
Power is 44 percent of the LCOH and capital 41 percent. Everything else is a rounding error by comparison, which tells you where to spend diligence time. A quick check on power: 52.5 kWh per kg at $39.00 per MWh is $2.05 per kg, the year-1 figure. The levelized figure is higher, $2.15, because consumption rises as stacks age and delivered power steps up to $48.00 once the PPA ends.
The two numbers that move LCOH most are the price of power and the share of hours the electrolyzer runs. Power cost scales with the PPA price; capital cost per kg falls as the capacity factor rises, because the same plant is spread over more output. The grid below shows the LCOH before the credit:
| PPA price | 40 percent CF | 60 percent CF | 70 percent CF |
|---|---|---|---|
| $27/MWh | $6.03 | $4.53 | $4.08 |
| $35/MWh | $6.46 | $4.94 | $4.42 |
| $43/MWh | $6.90 | $5.34 | $4.77 |
| $51/MWh | $7.33 | $5.75 | $5.12 |
Read it in both directions. At the case PPA, dropping from 60 to 50 percent capacity factor takes LCOH from $4.94 to $5.60; dropping to 40 percent takes it to $6.46. Raising the PPA from $35 to $43 at 60 percent adds far less. A cheap PPA does not rescue a plant that runs too few hours, and the capacity factor is not a free choice: in the case, 60 percent is the result of hourly-matched operation on contracted wind and solar plus grid top-up, as the credit rules require.
The plant's emissions intensity is 0.40 kg CO2e per kg, under the 0.45 threshold of the top 45V tier, so it earns $3.185 per kg for ten years. Sold to a buyer at 0.92 per dollar, that is $2.930 of cash per kg. Levelized over the whole life on the same basis as the costs, the credit is worth $2.15 per kg, so the LCOH net of the credit is $2.79. The levelized offtake and merchant revenue is $2.98 per kg, which leaves a margin over the net cost. The tiers, the electricity rules and the deadline behind that credit are explained in the guide on how the 45V clean hydrogen credit works.
Year 1 makes the same point in plain cash. The offtaker pays $2.60 per kg and the credit adds $2.93, for $5.53. Variable cost is $2.10 (power $2.05 plus water $0.05) and fixed O&M, insurance and property tax $0.46. Without the credit, the offtake price would cover the variable and fixed costs with almost nothing left to repay the capital.
The free LCOH Calculator lets you rerun this calculation with your own capital cost, PPA price and capacity factor, and The Green Hydrogen Handbook builds the full model behind every number above, from the plant to the lenders' cases.
It is the present value of a plant's lifetime costs divided by the present value of its lifetime output: the flat price per kg at which the project breaks even at the chosen discount rate. In the worked case it is $4.94 per kg at 8 percent.
Power, followed closely by capital. In the case, power is $2.15 per kg, 44 percent of the LCOH, and capital $2.02, 41 percent. Stacks ($0.16), fixed costs ($0.56) and water ($0.05) make up the rest.
A lot, because capital is spread over output. At a $35 PPA, the case LCOH is $4.94 at 60 percent capacity factor, $5.60 at 50 percent and $6.46 at 40 percent.
Quote both. Before the credit the case is $4.94 per kg; the credit, levelized as cash after the transfer discount, is worth $2.15, so the net figure is $2.79. The credit changes revenue, not the cost of making hydrogen.
This guide is one arc of The Green Hydrogen Handbook. The book follows one 100 MW electrolysis plant from its first kilowatt-hour to retirement: electrolyzers and degradation, power supply and hourly matching, the levelized cost, the 45V credit and its sale, European and UK subsidies, the offtake contract, construction, sculpted debt, equity returns, scenarios and due diligence.
Paperback PDF edition, $19.99 Book page and companion workbooks
Free download: LCOH Calculator (Excel).
Illustrative figures computed by the book model; the project, its companies, contracts and every figure are fictional. Tax credits and subsidy schemes described as read in November 2026. Education only, not legal, tax or investment advice.