At the end of its design life a wind farm can be repowered, extended or decommissioned. An extension is a small capital decision that is judged by the cash it earns on worn equipment, not by the age of the turbines.
A 60 MW wind farm at the end of its design life can run ten more years for $9.0m of refurbishment. At a 30% capacity factor, 1% a year of output decline, $52 per MWh, $4.0m of annual operating cost and an 8% discount rate the extension is worth $17.10m. It breaks even at $35.20 per MWh, 32% below the assumed price.
A course built on one solar project, from P50 and P90 to construction funding, sculpting, reserves, cover ratios and stress tests, with Excel exercises, a 160-question quiz and the Project Finance Model, Pro Edition included ($149 at launch).
| Item | Value |
|---|---|
| Installed capacity | 60 MW |
| Capacity factor | 30% |
| Output in the first extension year | 157,680 MWh |
| Output decline a year (blade and gearbox wear) | 1.0% |
| Merchant price, flat | $52 per MWh |
| Operating cost a year | $4.0m |
| Refurbishment and lease renewal, paid now | $9.0m |
| Extension | 10 years |
| Discount rate | 8.0% |
Output is 60 × 8,760 × 30% = 157,680 MWh in the first extension year and falls by 1.0% a year. Revenue is output × price, and the extension is worth taking if the present value of revenue less operating cost exceeds the $9.0m spent to get it.
| Year | Output | Revenue | Opex | Net | PV at 8% |
|---|---|---|---|---|---|
| 1 | 157,680 | 8.199 | 4.000 | 4.199 | 3.888 |
| 2 | 156,103 | 8.117 | 4.000 | 4.117 | 3.530 |
| 3 | 154,542 | 8.036 | 4.000 | 4.036 | 3.204 |
| 4 | 152,997 | 7.956 | 4.000 | 3.956 | 2.908 |
| 5 | 151,467 | 7.876 | 4.000 | 3.876 | 2.638 |
| 6 | 149,952 | 7.798 | 4.000 | 3.798 | 2.393 |
| 7 | 148,453 | 7.720 | 4.000 | 3.720 | 2.170 |
| 8 | 146,968 | 7.642 | 4.000 | 3.642 | 1.968 |
| 9 | 145,498 | 7.566 | 4.000 | 3.566 | 1.784 |
| 10 | 144,043 | 7.490 | 4.000 | 3.490 | 1.617 |
| Total | 26.10 |
Year 1 revenue is 157,680 × 52 = $8.199m, and year 10 revenue is $7.490m after nine years of wear. Net cash flow falls from $4.199m to $3.490m because the operating cost does not fall with output.
NPV = present value of net cash flows − refurbishment = 26.10 − 9.0 = $17.10m
Break-even price = the price at which NPV is zero = $35.20 per MWh, which is 32.3% below the assumed $52
Every $1 per MWh of price is worth about $1.02m of NPV
Excel: =NPV(8%,B2:B11)-9 with net cash flows in B2:B11
The refurbishment is repaid by about year 3, and the extension earns its return mostly in the middle years, when the $4.0m cost base is covered with room to spare. Deferring decommissioning is a further benefit not counted above: a $3.0m cost pushed ten years out is worth $1.61m today if it stays at $3.0m, or $1.31m if it escalates at 2% a year. That would take NPV to $18.41m.
| Case | NPV |
|---|---|
| Base case | $17.10m |
| Price of $45 per MWh | $9.97m |
| Price of $60 per MWh | $25.24m |
| Refurbishment of $12.0m | $14.10m |
| Operating cost of $4.5m | $13.74m |
| Capacity factor of 27% | $11.81m |
| Discount rate of 10% | $14.97m |
| Seven-year extension | $11.73m |
| Five-year extension | $7.17m |
Price is the main risk because the farm sells at the merchant price. Even so, a fall to $45 leaves NPV at $9.97m. The value is also sensitive to length: with only five years of life the same refurbishment still earns $7.17m, so the decision is not marginal unless price falls toward $35.
Discount the net cash flow of the extra years, with output falling for wear, and deduct the refurbishment. Here that is $26.10m less $9.0m, or $17.10m.
The price at which the present value of net cash flows equals the refurbishment. In this example it is $35.20 per MWh.
Yes. A $3.0m cost pushed out ten years is worth $1.61m today without escalation and $1.31m with 2% a year of escalation.
The free companion files for The Infrastructure Asset Manager rebuild a fictional infrastructure platform after the deal, from a regulated water utility, a solar portfolio and a schools concession to covenants, a refinancing, the quarterly valuation and the exit. The wind farm in this article is invented and is not in them. No account and no email address.
Not on Amazon: 19 paperbacks by Julian R. Sterling on energy, infrastructure and land, printed on demand and shipped worldwide. Browse the bookshop →
Reading guide: infrastructure, data centre and energy investing → · All 1908 articles →