Energy margin from heat rate and spark spreads, capacity revenue, fixed costs, DCF and price per kW, term loan B leverage, and stress tests, worked on one example
A gas plant is worth what it earns in the hours it runs, plus what it is paid for being ready, minus what it costs to stay ready. Everything else, from the price per kilowatt to the exit multiple, is a cross-check on that cash flow.
Worked in full in The Gas-Fired Power Plant Handbook by Julian R. Sterling, with every figure reproduced in Excel workbooks.Get the DRM-free PDF, $19.99 →
A gas-fired power plant is worth the present value of what it will earn from three sources: the energy margin between the power price and its fuel and variable costs in the hours it runs, the capacity revenue it earns for being available, and smaller payments for ancillary services. Subtract the fixed cost of keeping it ready and the capital spending that keeps it reliable, and you have the cash flow a buyer pays for. Price per kilowatt and EBITDA multiples are cross-checks, not substitutes.
This guide works through the method on the fictional plant used throughout The Gas-Fired Power Plant Handbook: Harlan Ridge Energy Center, a 720 MW two-on-one combined cycle bought by an infrastructure fund on January 1, 2027 and held for seven years. Every figure is an assumption of the case, computed by one model, not a market statistic.
The plant's operating heat rate is 6,936 Btu per kWh, about 2.0 percent worse than its new-and-clean rating of 6,800. With Henry Hub gas at $3.60 per MMBtu, a basis of $0.30 to the plant, and variable transport charges of $0.10, the delivered gas price is $4.00. Fuel therefore costs $27.74 per MWh, and with variable O&M of $3.00 the plant's dispatch cost is $30.74 per MWh. The plant runs in every price block above that cost, as the spark spread explained shows in detail.
In year 1 it generates 3,908,160 MWh, a capacity factor of 62.0 percent, earns energy revenue of $187.72 million, and keeps an energy margin of $67.57 million after fuel and variable costs.
| Year 1 line | Amount |
|---|---|
| Energy margin | $67.57 million |
| Capacity revenue | $26.02 million |
| Ancillary services | $2.50 million |
| Fixed O&M | -$10.08 million |
| Other fixed costs (service agreement fee, property tax, insurance, asset management, firm transport) | -$16.80 million |
| EBITDA | $69.21 million |
Capacity revenue is 27.1 percent of the plant's gross margin. It is paid on 648 MW of accredited capacity at $110.00 per MW-day, which is why accreditation rules and capacity auction results deserve as much diligence as the power price forecast.
Subtract capital spending, including $18.0 million of owner-funded work in each major inspection year, and the plant generates cash flow before debt service of $66.71 million in year 1 and $46.35 million in its first major outage year. A seven-year forecast plus an exit value at 7.0x the year 7 EBITDA of $71.46 million gives an enterprise value at exit of $500.2 million.
The purchase price of $504.0 million is $700 per kW and 7.3x the first year's EBITDA. At that price, the unlevered pre-tax return is 11.62 percent. Price per kilowatt should be compared with the cost of building a new plant, which rose sharply in the mid-2020s as turbine order books filled; multiples should be applied to a normalized EBITDA, not to one good or bad year.
A merchant gas plant is usually financed with a term loan B. Here the lenders lend the lower of 4.25x the year 1 EBITDA and 60 percent of the price: $294.1 million at 8.25 percent, with 1 percent annual amortization and a 50 percent cash sweep. The fund invests $227.3 million of equity. Over the hold the plant repays 54.4 percent of the loan and distributes $139.5 million; at exit the equity receives $358.7 million. The pre-tax equity IRR is 14.02 percent and the multiple is 2.19x.
Notice where that return comes from. EBITDA grows slowly and the exit multiple is below the entry multiple, so the enterprise value barely changes. The return comes from cash generation: debt repaid and distributions paid. The exit proceeds are still 72.0 percent of everything the equity receives, which is why the exit assumption deserves its own stress test.
| Stress | Year 1 EBITDA | Lowest DSCR | Equity IRR |
|---|---|---|---|
| Base case | $69.21 million | 1.98x | 14.02 percent |
| Henry Hub 10 percent higher, power prices unchanged (spark spread squeeze) | $59.45 million | 1.51x | 6.79 percent |
| Power prices 10 percent lower in every block and year | $50.44 million | 1.11x | -2.33 percent |
| Capacity price of $50.00 per MW-day instead of $110.00 | $55.02 million | 1.31x | 3.94 percent |
| Heat rate 3 percent worse than plan | $65.96 million | 1.82x | 11.85 percent |
| Exit multiple of 6.0x instead of 7.0x | $69.21 million | 1.98x | 11.37 percent |
The plant is long the spark spread, not short gas: when gas and power rise together the return goes up, and when gas rises alone it falls. Power and capacity prices are the largest levers. Operational stresses such as a worse heat rate cost less on their own but tend to arrive together with deferred maintenance, which is where gas turbine long-term service agreements come in.
Test your own plant with the free Gas Plant Spark Spread Model (Excel): overwrite the blue inputs and read the EBITDA, the loan the plant supports, and the equity return, with a Controls tab that must read 0.
This guide is drawn from The Gas-Fired Power Plant Handbook, following Harlan Ridge Energy Center (720 MW combined cycle) from its first income statement through heat rate, gas supply, dispatch, capacity revenue, a toll offer, two major outages, diligence, valuation, a term loan B, stress tests, and exit.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Gas Plant Spark Spread Model (Excel).
It depends on the plant's margins, its remaining life, and the cost of new construction. In the fictional example, a 720 MW combined cycle is bought at $700 per kW, or 7.3x its first-year EBITDA.
A discounted cash flow built from heat rate, gas and power prices, capacity revenue, fixed costs, and the maintenance schedule, cross-checked against price per kilowatt and EBITDA multiples of comparable transactions.
The spark spread in the hours it runs, the capacity price on its accredited capacity, its availability, and the exit value. A gas price rise matters mainly through whether power prices follow it.