Non-recourse project debt sizing, DSCR and LLCR, sale-leaseback IRR vs. ASC 842-40 failed-sale rules, host closure recovery, and two-tier DCF.
Should an on-site Air Separation Unit be financed with non-recourse project debt or an equipment sale-leaseback? Here is the side-by-side arithmetic on a fictional $120 million plant.
Worked in full in The Industrial Gas Plant Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
Financing an on-site Air Separation Unit comes down to matching capital structure to contract tenor, tax appetite, and Year 15 residual value. In The Industrial Gas Plant Finance Handbook, Redcliff ASU ($120,000,000 total capex, $16,724,362 base EBITDA, $15,524,362 pre-tax free cash flow) is financed under two competing options: an $84,000,000 non-recourse project term loan (Option A) and a $96,000,000 equipment sale-leaseback (Option B).
| Financing Metric | Option A: Project Debt | Option B: Sale-Leaseback |
|---|---|---|
| Upfront Proceeds (LTC) | $84,000,000 (70%) | $96,000,000 (80%) |
| Sponsor Equity Required | $36,000,000 | $24,000,000 |
| Rate / Term | 6.85% / 13 yrs | 7.60% / 15 yrs |
| Annual Payment | $9,965,390 | $10,213,767 |
| Pre-Tax Equity IRR | 17.5% | 22.8% (with Y15 buyout) |
Fictional Redcliff ASU case figures computed by the book's deterministic model.
Under Option A, the $84,000,000 term loan amortizes to zero over 13 years inside the 15-year GSA, leaving a 2-year contracted tail with zero refinancing risk. Including $429,488 of interest on the $5,726,504 drawn working capital line and deducting $635,219 of steady-state pass-through tax distributions yields a base-year DSCR of 1.43x (pre-tax 1.49x), a pre-tax LLCR of 1.56x, and a 15-year PLCR of 1.70x, backed by a 6-month DSRA ($4,982,695). In the Weak state, DSCR stays healthy at 1.22x.
Option B raises $12,000,000 more upfront cash for only $248,377 more per year by stretching to 15 years and booking a 20% FMV residual ($19,200,000), lifting pre-tax equity IRR by 5.3 percentage points to 22.8%. Under Public Law 119-21 (signed July 4, 2025), permanent 100 percent bonus depreciation under IRC Section 168(k) on 5-year MACRS Class 28.0 equipment makes true tax sale-leasebacks especially attractive when a bank lessor can monetize Year 1 tax shields faster than a project SPV. Watch out for GAAP, however: under ASC 842-40-25-3, a purchase option on a specialized on-site ASU almost always triggers failed-sale accounting, keeping the asset and a financing liability on the seller-lessee's balance sheet.
If the host steel mill closes in Year 6, merchant-only operation loses cash (-$462,390 EBITDA) and cold-box relocation nets only $22,000,000 (18% of capex). Combined with a 25% bankruptcy recovery ($18,552,212), lenders recover $40,552,212 (68%) against $59,853,779 of debt, absorbing a $19,301,567 loss. Valuing the healthy plant with a Two-Tier DCF ($128,917,975 for 15 contracted years at 8.5%, plus $17,208,965 for the 10-year post-contract tail valued at 12.0% at Year 15 and discounted back 15 years at 8.5%) produces $146,126,939 of Enterprise Value and $56,400,435 of Equity Value after deducting all $89,726,504 of debt (term loan plus drawn line).
Run both debt sizing and two-tier valuation in the free Air Separation Plant Model (Excel). Read how an air separation unit makes money and how industrial gas supply contracts and take-or-pay work, or explore broader infrastructure valuation in The Infrastructure M&A Handbook.
In the fictional case, the $96,000,000 sale-leaseback cuts upfront sponsor equity by $12,000,000 and stretches payments to 15 years with a 20% residual, lifting pre-tax equity IRR from 17.5% to 22.8%.
Under ASC 842-40-25-3, a repurchase option blocks sale treatment unless the exercise price is fair value AND substantially similar alternative assets are readily available, which specialized on-site cold boxes rarely satisfy.
No. Tax rules under Public Law 119-21 and financial models are educational illustrations only.
This guide is drawn from The Industrial Gas Plant Finance Handbook, which follows a fictional Air Separation Unit from ambient air through take-or-pay contracts, power pass-throughs, argon netbacks, project debt vs. sale-leasebacks, host closure risk, and two-tier valuation.