Units and conversions, the four components of the price, what moves it, a comparison with potable reuse, brackish and imported water, and levelized cost.
The cost of desalinated water per acre-foot is mostly the cost of capital. A worked build-up for a fictional 25 mgd seawater plant gives $4,165.33 per acre-foot at full output, compared with $3,424.40 for potable reuse and $1,593.56 for brackish groundwater, with the conversions and conventions that explain why quoted figures differ.
Worked in full in The Desalination and Water Reuse Project Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
American water agencies compare supplies in dollars per acre-foot. An acre-foot is 325,851 gallons, or 1,233.48 cubic meters. Plant capacity is rated in million gallons per day (mgd), and one mgd sustained for a year is 1,120.1 acre-feet. A 25 mgd plant therefore has a nameplate volume of 28,004 acre-feet a year and, at 95 percent availability, about 26,603.
To convert, divide dollars per acre-foot by 325.851 to get dollars per thousand gallons, or by 1,233.48 to get dollars per cubic meter. A price of $4,165.33 per acre-foot is $12.78 per thousand gallons or $3.38 per cubic meter.
The example is the Calder Point plant of The Desalination and Water Reuse Project Finance Handbook, sold under a 30-year water purchase agreement. Calder Point Water Company, the Calder Point Seawater Desalination Plant and the Arroyo Coast Water Authority are fictional, and the costs and prices are planning assumptions, not quotations. This article is educational and is not legal, tax, engineering or investment advice.
| Year 1 dollars per acre-foot | At the minimum, 24,000 acre-feet | At the maximum, 26,600 acre-feet |
|---|---|---|
| Fixed charges (capital and fixed operations) | $3,728.79 | $3,364.33 |
| Variable operating charge | $180.00 | $180.00 |
| Electricity at 13.5 cents per kWh | $621.00 | $621.00 |
| Unit price | $4,529.79 | $4,165.33 |
Fixed charges are 81 percent of the price at full output, and the capital charge alone is 61 percent. Electricity, at a guaranteed 4,600 kilowatt-hours per acre-foot (3.73 kWh per cubic meter for the whole plant, including intake and product pumping), is 15 percent.
Real project estimates show the same sensitivity to convention. When the Carlsbad financing closed, the San Diego County Water Authority published in January 2013 a range of 1,849 to 2,064 dollars per acre-foot for water at the plant and 2,014 to 2,257 dollars including the pipeline and system improvements, in 2012 dollars. Both figures were accurate, and they differ by about 10 percent.
| Supply (fictional planning figures, Year 1 dollars) | Capital | Fixed operations | Variable | Electricity | Total per acre-foot |
|---|---|---|---|---|---|
| Imported water, wholesale rate | $1,750.00 | ||||
| Brackish groundwater desalter, 10 mgd, public financing | $762.49 | $545.56 | $110.00 | $175.50 | $1,593.56 |
| Potable reuse, 12 mgd, public financing | $2,008.23 | $1,091.67 | $95.00 | $229.50 | $3,424.40 |
| Seawater desalination, 25 mgd, private financing, full output | $2,552.30 | $812.03 | $180.00 | $621.00 | $4,165.33 |
The ordering is typical: imported water is cheapest where it is available, then brackish groundwater, then potable reuse, then seawater. Each cheaper source is limited in volume, and the seawater figure includes private financing, which the others do not. Priced under public financing with a federal WIFIA loan and revenue bonds, the same seawater plant would cost $3,169.08 per acre-foot, $996.24 less, with the public owner carrying the construction and performance risk.
Because the debt service charge is flat, the contract price rises about 1.7 percent a year in the example, more slowly than an imported water price assumed to rise 5.0 percent a year. On those assumptions the two lines cross in Year 29 of a 30-year contract. The crossover year depends entirely on the assumed growth of the alternative and should be computed at several rates.
The levelized cost is more robust: the present value of all payments divided by the present value of all acre-feet. At a discount rate of 4.5 percent, it is $5,089.22 per acre-foot for the contract and $3,321.30 for imported water, a levelized premium of $1,767.92. Spread over all of the buyer's sales, the Year 2 premium is $302.86 per acre-foot, or $7.57 a month for a household using 0.30 acre-feet a year.
The free Water Purchase Agreement Model (Excel) builds the unit price from fixed and variable charges at any quantity. For the contract behind the price, see how a take-or-pay water purchase agreement works, and for the capital structure, how a desalination plant is financed.
At full output, one million gallons per day for a year is about 1,120.1 acre-feet, since an acre-foot is 325,851 gallons. Actual production is lower by the plant's availability.
Seawater is far saltier than treated wastewater, so reverse osmosis needs much higher pressure and well over twice the electricity, and a coastal plant needs an ocean intake and outfall. In the worked example, seawater costs $4,165.33 per acre-foot under private financing and potable reuse $3,424.40 under public financing.
Divide by 325.851. To convert to dollars per cubic meter, divide by 1,233.48.
It depends on the project. In the worked example, fixed charges are 81 percent of the price at full output and the capital charge alone is 61 percent, which is why the bond yield on the pricing date matters so much.
This guide is drawn from The Desalination and Water Reuse Project Finance Handbook, which follows the fictional Calder Point Seawater Desalination Plant through its water purchase agreement, its construction, its bond financing and its stress cases.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Water Purchase Agreement Model (Excel).
Illustrative figures computed by the book model; the Calder Point case is fictional and its costs and prices are planning assumptions. Education only, not legal, tax, engineering, or investment advice.